Quarterly Activities Report
Released
Released
Announcement PDF
1
Quarterly Report for the quarter ending 31 December 2023
Auking Mining Limited
ABN 29 070 859 522
ASX Code: AKN, AKNO
Quarterly Report
For the quarter ending 31 December 2023
aukingmining.com
AuKing Mining is an exploration company focused on uranium,
copper and zinc projects in Australia and Tanzania.
Highlights
•
Completed initial soil and rock chip
sampling at Mkuju in southern Tanzania,
with results including:
•
Drilling activities concluded at end of
December, with onset of the wet season.
A total of 557m (55 holes) of auger and
52m of diamond drilling was completed.
•
Mkuju project area significantly increased
with the addition of three new licences
within the highly prospective Mkuju
radiometric survey.
•
Successful completion of a $1.2M share
placement in November 2023.
MKGS021 6,213ppm U3O8
MKGS056 1,344ppm U3O8
•
Continued shallow auger drilling as part
of initial Stage 1 program with results
including:
MKAU23_020 4m @ 598ppm U3O8 incl
1m @ 1896ppm U3O8
Issued Capital:
Directors:
Contact
Ordinary shares
230,353,707
Executive Chairman Asimwe Kabunga
Non-Executive Director Peter Tighe
Non-Executive Director Shizhou Yin
Non-Executive Director Park Wei
Suite 28, Level 22
127 Creek Street
BRISBANE Q 4000
Ph: +61 7 3535 1208
Email:
admin@aukingmining.com
Options
64,500,000 unlisted options (30
September 2025 @ 20c each)
13,125,000 unlisted options (31
December 2025 @ 10c each)
3,000,000 Director incentive options
(31 May 2025 @ 17c each)
2,700,000 Employee incentive options
(31 May 2025 @ 11c each)
Chief Executive Officer Paul Williams
Company Secretary Paul Marshall
Quarterly Report for the quarter ending 31 December 2023
2
Tanzania Projects
Ownership 100% | Tanzania
Uranium and Copper projects
In January 2023, AuKing announced completion of the acquisition of its 100% interest in six projects in
Tanzania (Ref ASX Release 31 January 2023).
Four of the projects are prospective for uranium (Manyoni, Mkuju, Itigi and Magaga) and the other two
are prospective for copper (Mpanda and Karema). Mkuju is currently the priority focus of exploration
activities in Tanzania.
Continuation of Mkuju Stage 1 Exploration
During the December Quarter, AuKing continued its soil and rock chip sampling program as well as the
shallow auger drilling program. Diamond drilling also commenced in November 2023.
Figure 1 – Mkuju Project Location
Soil and rock chip sampling at Mkuju
A detailed summary of results achieved from the Stage 1 soil sampling and rock chip exploration
program at Mkuju is set out in ASX Releases dated 16 October and 20 November 2023 respectively) and
include the following:
• A total of 66 sample results included pXRF results of:
499ppm U3O8 from rock chip sample MKGS001
481ppm U3O8 from rock chip sample MKGS006
6,213ppm U3O8 from rock chip sample MKGS021
652ppm U3O8 from rock chip sample MKGS056
1,344ppm U3O8 from rock chip sample MKGS056
549ppm U3O8 from rock chip sample MKGS057
Quarterly Report for the quarter ending 31 December 2023
•
As illustrated below, the results from this program demonstrate a close correlation with the
radiometric survey undertaken by Mantra Resources Limited in 2007 – thereby leaving open a
significant prospective area for future drilling activities.
Figure 2 – Mkuju Soil and Rock Chip Sample Locations and Results
3
4
Quarterly Report for the quarter ending 31 December 2023
Auger drilling at Mkuju
A summary of the auger drilling results achieved from the Stage 1 exploration program at Mkuju are
highlighted below and also set out in full in Annexure A of ASX release dated 29 December 2023:
Hole ID
From (m)
To (m)
Width
MKAU23_011
10
11
1
MKAU23_014
0
1
1
MKAU23_018
2
6
4
MKAU23_020
0
4
4
Incl.
0
1
1
MKAU23_035
7
9
2
MKAU23_042
6
7
1
MKAU23_045
0
2
2
Incl.
0
1
1
Table 1 – Mkuju highlighted auger drilling results
Grade (U ppm)
38
159
48
598
1896
110
51
169
283
A number of observations need to be made in relation to the auger drilling program:
• Overall, the auger drilling program comprised 55 holes for a total of 547m drilled, with the
deepest hole being 18m and an average hole depth of 10m;
• AuKing’s planned drilling for the auger rig was to achieve depths of 30m per hole and that based
on historical drilling in the area (including at Nyota), uranium mineralization was expected to be
observed if these drilling depths were achieved;
• However, as noted previously, the auger drilling rig has experienced several mechanical faults
and other problems since arriving to site in August 2023 and these issues have prevented the
30m target depth being achieved for any drill hole;
• AuKing’s exploration team believes this is the major reason why most of the auger holes did not
identify uranium mineralisation – the holes were simply not deep enough;
• the auger rig has now been removed from site and is undergoing a major overhaul in Dar es
Salaam. Whether it returns to the Mkuju site will be a matter for AuKing to consider as it would
appear to make more sense for future drilling to be undertaken by way of air core/RC drilling rig;
and
• Despite the ongoing mechanical problems, AuKing has still been able (in some of the drill holes)
to identify significant uranium mineralization, including over to the eastern part of the Mkuju
licence area. As has been the case with the reported rock chip and soil sample results, these
auger drill results provide further correlation with the historical radiometric survey. More
importantly, the results provide a strong basis for the next stage of proposed drilling at Mkuju
which is planned for the first half of 2024, as soon as access is permissible after the wet season
has concluded.
Diamond drilling at Mkuju
AuKing sought to mobilise the track-mounted diamond drilling rig in early November 2023 in an attempt
to carry out a few quick drill holes to a depth of approximately 100m in order to test uranium
mineralisation at certain priority target holes. Unfortunately, the rig arrived at site in mid-November and
then had several days tramming (on its own tracks) to the first drill hole location. Mechanical breakdowns
then occurred over the next few weeks with the rig and then final set-up delays meant that drilling did not
commence on the first proposed hole until the week before Christmas. A total of 52m of diamond drilling
Quarterly Report for the quarter ending 31 December 2023
5
was completed before the crew departed site for the Christmas/New Year vacation period. Rainfall has
continued over this period and the prospect of further diamond drilling at this time is very unlikely.
The delays experienced with the diamond rig were frustrating and unfortunate and point to a greater
likelihood that a track-mounted air core/RC drilling rig will be utilized for the planned future drilling at
Mkuju.
Figure 3 – Location of highlighted Mkuju auger drilling results
Cautionary Statement
The Company used an Olympus Vanta portable hand-held XRF analyser to screen air-core samples for
mineralisation before submitting samples to the lab for assay. This allows for some understanding of the
distribution of mineralisation prior to sampling to better ensure that samples submitted for analysis are
representative of the type and style of mineralisation. The hand-held XRF provides confirmation that
mineralisation is present however it is not an accurate determination of the elemental concentration
within the sample analysed. Limitations include: very small analysis window, possible inhomogeneous
distribution of mineralisation, analytical penetration depth, and possible effects from irregular rock
surfaces. These results obtained from the hand-held XRF are indicative only and may not be
representative of elemental concentration within the material sampled. The pXRF readings are subject to
confirmation by chemical analysis from an independent laboratory.
Quarterly Report for the quarter ending 31 December 2023
6
Expansion of Mkuju Project Area
During the December Quarter, AuKing secured the grant of three new prospecting licences (PLs) to the
east of the existing Mkuju project areas, covering a highly prospective area of approximately 345 sq kms.
As demonstrated in Figure 4 below, all three PL areas cover radiometric “highs” that appear to be of
similar quality to the world class Nyota uranium deposit to the immediate north-east.
Figure 4 – New Mkuju Licence Areas
Emerging Uranium “Hotspot” Region
By securing these new licence areas AuKing has now consolidated an area of approximately 1,070 sq
kms of tenures where high levels of interest are emerging for uranium exploration and development.
Figure 5 below highlights the concentration of licences around the Nyota special mining licence, with
AuKing’s Mkuju tenure package comprising a strategic position.
Quarterly Report for the quarter ending 31 December 2023
7
Figure 5 – Licence holdings in Mkuju region (AuKing – yellow, 92U; Sienna Mining – blue, LEGZ92;
Gladiator Resources – green, Zeus Resources)
With Gladiator Resources and Sienna Mining planning significant exploration programs in early 2024,
there is likely to be a substantial level of newsflow and interest in the Mkuju region going forward.
Itigi Drilling Program
As previously reported, AuKing completed a total of 1,060.5m of air core (AC) drilling at the Itigi project
(to the west of Manyoni in central Tanzania). This drilling was completed across 72 holes, to depths up to
15m where bedrock was encountered.
Assay results received by AuKing’s exploration team during the December Quarter were largely
consistent with the initial XRF field measurements of the drilling samples. Although there were
anomalous U3O8 readings across several drill holes (including up to a maximum reading of 304ppm
U3O8), AuKing’s drilling at Itigi was unable to replicate the historically-reported results in this area. As a
consequence (and largely due to the expanded focus on Mkuju to the south) it is likely that AuKing will
abandon it licence holdings at Itigi over the coming weeks.
Revocation of Manyoni Licences
On 27 February 2023 AuKing advised of a decision by the Tanzanian Mining Commission to revoke two
of the Company’s PL holdings at Manyoni – PLs 12193 and 12194. As a result of this decision AuKing
filed an appeal to the Tanzanian Minister of Mining under the relevant provisions of the Mining Act. A
response to that appeal is still pending. Throughout the course of the December Quarter AuKing
Quarterly Report for the quarter ending 31 December 2023
8
continued to liaise with representatives of the Ministry and also the Mining Commission, hopeful of a
positive outcome from the discussions.
Koongie Park Project
Western Australia, Australia
Ownership 100% (subject to 1% net smelter royalty)
Total JORC Resources: Sandiego/Onedin - 8.9 million tonnes @ 1.01% Cu, 3.67% Zn, 0.16g/t
Au, 32g/t Ag, 0.77% Pb and Emull -12.2 million tonnes @ 0.27% Cu, 0.38% Zn, 0.09% Pb and
4.9g/t Ag
Sandiego Mining Study
AuKing has previously announced the results of a Scoping Study designed to assess the development of
an open-pit and underground mining operation at the Sandiego deposit. Features of the Study
outcomes included:
•
•
•
Life-of-Mine (LOM) of 11 years with an estimated total production of 110kt Cu, 38kt Zn and
355koz Ag
Processing nameplate capacity of 750ktpa of run-of-mine (ROM) ore
Strong project economics and financial returns including:
o Pre-production Capex of A$134M, with an estimated 2.45 years’ payback period
o Robust pre-tax NPV8 of approximately A$176.9M and 39.7% IRR
o Life of Mine EBITDA of A$443.8M with an average operating cashflow of A$40.3M per
annum.
[Refer ASX release on 1 June 2023 for full details of the Scoping Study and the detailed cautionary
statement applicable to that information]
There were no activities conducted at the Koongie Park project during the December Quarter other than
receipt of further assays from the Sandiego North soil sampling program as below.
Other Project Activities
Sandiego North
Earlier in 2023, the Company completed a soil sampling program over the Sandiego North area to follow
up on mineralisation identified in and around the waterbore drill hole (ASWB001) which is situated 700m
north of the Sandiego deposit. The purpose of the soil program was to identify any geochemical
continuity between Sandiego and Sandiego North.
Figure 6 below shows the sample locations that were targeting the area between the main Sandiego
deposit and Sandiego North – with the recent Sandiego mining study including a possible open pit mine,
the ability to identify further open-pittable resources at Sandiego North becomes quite significant. From
the further assay results received during the December Quarter (and as illustrated in Figure 6) there is a
clear Cu geochemical trend from ASWB001 back towards the main Sandiego deposit to the south-west.
Quarterly Report for the quarter ending 31 December 2023
Samples were taken on a nominal 50m x 20m spacing for a total of approx. 330 samples in total. The
results from this program clearly demonstrate the need for several drill holes to test the extent of
potential copper mineralisation across this very prospective zone.
Figure 6 – AuKing’s Sandiego North soil sampling area
Corporate
November 2023 Share Placement
The Company completed a share placement to sophisticated and professional investors to raise $1.05
million (before costs) through the issue of 26,250,000 shares at an issue price of $0.04 each (Placement
Shares). An additional series of free-attaching options (Placement Options) was issued with the
Placement Shares on a 1:2 basis exercisable at 10c on or before 31 December 2025. Mr Asimwe
Kabunga, the Board Chairman and major shareholder, agreed to participate in the Placement to the
extent of a further $200,000, taking the total funds raised (excluding costs) to $1.25 million.
The Company engaged Vert Capital Pty Ltd (Vert) to act as lead manager to the Placement. Vert
received a 6% cash fee payable on the extent of funds raised by them in the Placement. In addition, a
9
Quarterly Report for the quarter ending 31 December 2023
10
total of 5 million options exercisable at 20c on or before 30 September 2025 were issued to Vert (and/or
their nominees).
The proceeds of the Placement were used towards:
• Diamond drilling campaign at the Mkuju uranium project;
• General working capital, and
• Payment of placement costs.
Extraordinary General Meeting
The Company convened an extraordinary general meeting of shareholders (EGM) that was held on 16
January 2024. The purpose of the EGM was to authorize/ratify the issue of shares and options associated
with the Share Placement. The participation of AuKing Chairman, Mr Asimwe Kabunga, in the Share
Placement was also the subject of approval at the EGM. All resolutions were passed with almost
unanimous majorities.
ASX Additional Information
Exploration Activities ASX Listing Rule 5.3.1:
The focus of AuKing’s exploration activities during the December Quarter was at its Tanzanian uranium
projects, particularly Mkuju in southern Tanzania. No exploration was conducted at Koongie Park. Total
exploration expenditure for the December Quarter was $0.607M.
Mine Production Activities ASX Listing Rule 5.3.2:
There were no mine production or development activities conducted during the Quarter.
ESG commitment
The Company has previously adopted the World Economic Forum’s Environment, Social and
Governance (ESG) framework and instructed management to set up an impact measurement plan for
each sustainability area. These areas include governance, anti-corruption practices, ethical behaviour,
health and safety, GHG emissions, land use, ecological sensitivity, water consumption, diversity and
inclusion, pay equality and economic contribution.
To ensure that AuKing can measure, monitor, and report on its ESG progress, the Company has
engaged impact monitoring technology platform Socialsuite to streamline the outcomes measurement
and ongoing ESG reporting process.
Related Party Payments
During the December 2023 Quarter, AuKing paid a total of $75,000 of director fees to related parties and
their associated entities.
Board and Senior Management
Mr Asimwe Kabunga, Executive Chairman
Mr Paul Williams, Chief Executive Officer
11
Quarterly Report for the quarter ending 31 December 2023
Mr Peter Tighe, Non-Executive Director
Mr Shizhou Yin, Non-Executive Director
Mr Park Wei, Non-Executive Director
Mr Chris Bittar, Exploration Manager
Mr Paul Marshall, CFO and Company Secretary
Financial Position
At 31 December 2023, AuKing had cash reserves of $0.4M. Further details of AuKing’s financial activities
during the December 2023 Quarter are set out in the Appendix 5B Quarterly Cashflow Statement which
accompanies this report.
Share Information
Issued share capital of 230,353,707 ordinary shares, 64,500,000 options to subscribe for ordinary AKN
shares at an exercise price of 20c each and exercisable on or before 30 September 2025 and
13,125,000 options to subscribe for ordinary AKN shares at an exercise price of 10c each and
exercisable on or before 31 December 2025.
There are also 3,000,000 director incentive options (17c exercise price on or before 31 May 2025) and
2,700,000 employee incentive options (11c exercise price on or before 31 May 2025) on issue.
Top 10 Shareholders of AKN at 31 December 2023
Rank
Name
1
2
3
4
5
6
7
8
9
10
TOTAL
Kabunga Holdings Pty Ltd <Kabunga Family A/c>#
Ven Capital Pty Ltd#
Mr Pavle Tomasevic
Bienitial International Industrial Co Ltd
Bonacare Pty Ltd
Ropa Investments (Gibraltar) Limited
Mr Hashimu Millanga
Ms Pharoth San & Mr Kaden San <PKSan SuperFund>
Ms Leticia Kabunga
Mr Prisin Moshi
# Denotes substantial shareholder
Other Details
Head Office
Share Registry
Level 22, Suite 2208
127 Creek Street
Brisbane Q 4000
Phone: +61 7 3535 1208
Website: www.aukingmining.com
Link Market Services Limited
Level 12, 300 Queen Street
Brisbane Q 4000
Phone: 1300 554 474
Number of
Shares
36,000,000
15,680,000
10,000,000
9,245,092
9,000,000
7,600,000
7,425,000
5,318,706
4,581,000
4,252,578
109,102,376
%
15.63
6.81
4.34
4.01
3.91
3.30
3.22
2.31
1.99
1.85
47.37
Quarterly Report for the quarter ending 31 December 2023
This announcement is authorised by the Board.
For further information contact:
Paul Williams
Chief Executive Officer
p.williams@aukingmining.com
+61 419 762 487
12
13
Quarterly Report for the quarter ending 31 December 2023
JORC Resources
Onedin Mineral Resource Estimate and Metal Tonnes
Zone
Classification
Tonnes
(Mt)
Copper
(%)
Zinc (%)
Gold
(g/t)
Silver
(g/t)
Lead (%)
Cu
Dominant
Indicated
1.5
1.1
0.6
0.2
47
1.2
Inferred
-
-
-
-
-
-
Zn
Dominant
Indicated
3.3
0.5
4.3
0.1
34
1.0
Inferred
-
-
-
-
-
-
4.8
0.7
3.2
0.1
38
1.1
Resource Total and Grades
Zone
Classification
Tonnes
(Mt)
Copper
(tonnes)
Zinc
(tonnes)
Gold
(oz)
Silver
(Moz)
Lead (tonnes)
Cu
Dominant
Indicated
1.5
16,500
9,000
9,600
2.27
18,000
Inferred
-
-
-
-
-
-
Zn
Dominant
Indicated
3.3
16,500
141,900
10,600
3.61
33,000
Inferred
-
Total Metal Tonnes
Note:
33,000
150,900
-
-
-
20,200
5.88
51,000
(1) Reported tonnes and grade are rounded
(2) Reporting cut-off grades of 0.4% Cu and 1% Zn have been applied to the Onedin deposit
Sandiego Mineral Resource Estimate and Metal Tonnes
Classification
Cu
Dominant
Zn
Dominant
Gold
(g/t)
Silver
(g/t)
Lead (%)
1.7
2.3
0.8
0.3
18
0.2
0.3
1.6
3.0
0.2
5
0.0
Sub Total
2.0
2.2
1.1
0.3
16
0.1
Indicated
2.0
0.6
7.3
0.1
35
0.7
Inferred
0.1
0.2
6.1
0.1
10
0.1
Sub Total
2.1
0.6
7.3
0.1
34
0.7
4.1
1.4
4.3
0.2
25
0.4
Tonnes
(Mt)
Copper
(tonnes)
Zinc
(tonnes)
Gold
(oz)
Silver
(Moz)
Lead (tonnes)
Indicated
1.7
39,100
13,600
16,400
0.98
3,400
Inferred
0.3
4,800
9,000
1,900
0.05
0
Sub Total
2.0
43,900
22,600
18,300
1.03
3,400
Indicated
2.0
12,000
146,000
6,400
2.25
14,000
Inferred
0.1
200
6,100
300
0.03
100
Sub Total
2.1
12,200
152,100
6,700
2.28
14,100
56,100
174,700
25,000
3.31
17,500
Total Metal Tonnes
Note:
Zinc (%)
Inferred
Classification
Zn
Dominant
Copper
(%)
Indicated
Resource Total and Grades
Cu
Dominant
Tonnes
(Mt)
(1) Reported tonnes and grade are rounded
(2) Reporting cut-off grades of 0.8% Cu and 3% Zn have been applied to the Sandiego deposit
14
Quarterly Report for the quarter ending 31 December 2023
JORC Resources (cont.)
Emull Base Metals Deposit
December 2022 Mineral Resource Estimate (0.15% Cu Cut-off)
Type
Oxide
Transitional
Fresh
Total
Type
Oxide
Transitional
Fresh
Total
Type
Oxide
Transitional
Fresh
Total
Tonnage
Mt
0.26
0.34
1.8
2.4
Cu
%
0.28
0.29
0.31
0.30
Zn
%
0.72
0.68
0.57
0.60
Indicated Mineral Resource
Pb
Ag
Cu
Zn
%
g/t
t
t
0.16 5.4
700
1,800
0.17 7.0
1,000
2,300
0.14 6.6
5,600
10,400
0.14 6.6
7,300
14,500
Tonnage
Mt
0.04
0.05
9.7
9.8
Cu
%
0.24
0.25
0.26
0.26
Zn
%
0.23
0.18
0.33
0.33
Inferred Mineral Resource
Pb
Ag
Cu
Zn
%
g/t
t
t
0.05 3.1
100
100
0.04 3.4
100
100
0.08 4.6
25,200
32,300
0.08 4.5
25,400
32,500
Tonnage
Mt
0.29
0.39
11.5
12.2
Cu
%
0.28
0.28
0.27
0.27
Zn
%
0.66
0.61
0.37
0.38
Total Mineral Resource
Pb
Ag
Cu
%
g/t
t
0.14 5.2
800
0.15 6.6
1,100
0.09 4.9
30,800
0.09 4.9
32,700
Zn
t
1,900
2,400
42,700
47,000
Pb
t
400
600
2,400
3,400
Ag
koz
50
80
390
510
Pb
t
Ag
koz
7,400
7,400
10
1,420
1,430
Pb
t
400
600
9,800
10,800
Ag
koz
50
80
1,810
1,940
Note:
The Mineral Resource has been compiled under the supervision of Mr. Shaun Searle who is a director of Ashmore Advisory
Pty Ltd and a Registered Member of the Australian Institute of Geoscientists. Mr. Searle has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity that he has undertaken to
qualify as a Competent Person as defined in the JORC Code.
All Mineral Resources figures reported in the table above represent estimates at December 2022. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and
continuity of the occurrence and on the available sampling results. The totals contained in the above table have been
rounded to reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
15
Quarterly Report for the quarter ending 31 December 2023
Current AuKing Tenures
Project/Location
WESTERN AUSTRALIA
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Koongie Park, Halls Creek
Kununurra Region
TANZANIA
Manyoni
Manyoni
Manyoni
Manyoni
Manyoni
Manyoni
Itigi
Mkuju
Mkuju
Mkuju
Mkuju
Mkuju
Mkuju
Mkuju
Mkuju
Mkuju
Mkuju
Karema
Tenement
Reference
Current Holder
AKN %
Interest
Comment
E80/ 4389
E80/ 4766
E80/ 4960
E80/ 5076
E80/ 5087
E80/ 5127
E80/ 5263
M80/ 276
(Sandiego)
M80/ 277
(Onedin)
E80/5707
P80/ 1878
P80/ 1879
P80/ 1880
P80/ 1881
P80/ 1882
E80/5794
(Bow River)
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
100
100
100
100
100
100
100
100
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Koongie Park Pty Ltd
100
Refer Note 1 and 2
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
Koongie Park Pty Ltd
AuKing Mining Limited
100
100
100
100
100
100
100
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
Refer Note 1 and 2
PL12188
PL12190
PL12191
PL12193
PL12194
PL12323
PL12352
PL12184
PL12185
PL12186
PL12187
PL12189
PL12192
PL12485
PL12606
PL12607
PL12608
PL12179
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
92U Tanzania Ltd
Monaco Copper Ltd
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
Refer Note 3
Refer Note 3
Notes:
1.
AKN acquired a 100% interest in the Koongie Park Joint Venture as at 30 June 2023, subject to a 1% NSR royalty in
favour of former JV partner (Astral Resources NL).
2.
Koongie Park Pty Ltd is a wholly-owned subsidiary of AuKing Mining Limited.
3.
These licences have been revoked by the Tanzanian Mining Commission and the matter is currently the subject of appeal
to the Minister of Mines.
There were no changes in the quarter to the tenements held.
4.
Quarterly Report for the quarter ending 31 December 2023
16
Company Profile
AuKing Mining (ASX:AKN) is a mining exploration company focused on uranium, copper and zinc projects in
both Tanzania and Australia.
AuKing is focussed on the exploration and development of six uranium and copper projects in Tanzania
including:
Mkuju – near to the world class Nyota uranium project in southern Tanzania; the subject of significant
previous exploration
Manyoni/Itigi – the subject of significant exploration situated in central Tanzania, just west of Dodoma
Mpanda/Karema – prospective copper areas in western Tanzania that were the subject of historic mining
operations but largely untouched by modern exploration methods.
The Company also holds the Koongie Park Copper Zinc Project in Western Australia’s Halls Creek Region
hosts a JORC resource and is neighboured by several significant mining and development operations
including Nicolson’s Gold Mine and Savannah Nickel Mine. Koongie Park has already been the subject of
significant exploration drilling and analysis since the 1970’s, hosting over 300 RC and diamond drill holes
consisting of more than 60,000m of drilling in total.
AuKing announced in June 2023 the results of its Koongie Park Scoping Study on a proposal to commence
mining operations around a central processing facility at Sandiego.
Quarterly Report for the quarter ending 31 December 2023
17
Competent Persons’ Statements
The information in this report that relates to exploration results at the Sandiego North Project is based on
information compiled by Mr Chris Bittar who is a member of the Australasian Institute of Mining and
Metallurgy. Mr Bittar is an employee of AuKing Mining Limited and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which
they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Bittar consents to
the inclusion in the report of the matters based on his information in the form and context in which it
appears.
The information in this report that relates to exploration results at the Koongie Park Project is based on
information compiled by Mr Ian Hodkinson who is a member of the Australian Institute of Geoscientists
and the Society for Geology Applied to Mineral Deposits. Mr Hodkinson is a former non-executive
director and now independent consultant to AuKing Mining Limited and has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Hodkinson
consents to the inclusion in the report of the matters based on his information in the form and context in
which it appears.
The information in this report that relates to Mineral Resource Estimates at the Koongie Park Project
(Onedin and Sandiego) is based on information compiled by Mr David Williams who is a member of the
Australian Institute of Geoscientists. Mr Williams is a Principal Consultant Geologist (Brisbane) of CSA
Global and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Williams consents to the inclusion in this release of the matters based
on his information in the form and context in which it appears.
The information relating to the Mineral Resource Estimates at the Koongie Park copper/zinc project
(Onedin and Sandiego) is extracted from the Independent Mineral Resource Estimate of CSA Global (the
Report) dated 4 April 2022, which is available to view on the AKN website www.aukingmining.com. The
Report was issued in accordance with the 2012 Edition of the JORC Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market
announcement and, in the case of estimates of Mineral Resources or Ore Reserves that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented h