Cloncurry Project Update
Released
Released
Announcement PDF
Auking Mining Limited
ASX:AKN
Suite 34, Level 10
320 Adelaide Street
Brisbane Queensland 4000
ABN 29 070 859 522
Phone 07 3535 1208
www.aukingmining.com
17 December 2024
ASX RELEASE
Cloncurry Project Update
AuKing Mining Limited (ASX: AKN, AuKing) is pleased to provide an update on the
proposed activities at the Cloncurry gold project in north-western Queensland, after
receiving a briefing from Orion Resources about its plans for 2025. As announced on 27
November 2024 AuKing proposes to earn-in a 15% interest in the Cloncurry gold project
after incurring $1.5M in project expenditure before 31 December 2025.
Highlights of the Orion Resources briefing include the following:
•
Preparation of a Conceptual Mining Study and Mineral Resource Review: Orion
has engaged consultants to complete a Conceptual Mining Study and Mineral
Resource Review of the Mt Freda and Golden Mile project areas (which areas are the
subject of the AuKing earn-in agreement).
•
Delineation of updated JORC Resources at Mt Freda: Proposed drilling at Mt
Freda/Golden Mile is intended to increase confidence in the resource estimates and
support proposed mining and economic studies.
•
Lorena Processing Facility Recommissioning Study: Work is planned to prepare a
fully-costed project plan to recommission the Lorena Processing and Tailing Disposal
facility.
•
Drilling at nearby Mt Scheelite project: AuKing’s earn-in expenditure will include
further drilling at the nearby Mt Scheelite project with historical drilling results such
as:
MS22DD001 15m @ 6.96g/t Au from 28m including
[See ASX release 21 November 2022 by Tombola Gold Limited].
AuKing’s Managing Director, Mr Paul Williams, said that the proposed Orion transaction
presents an exciting opportunity for the Company to secure an interest in a near-term gold
producing asset situated in north-western Queensland.
1
“Clearly, the exploration work to be conducted by AuKing’s exploration team as part of the
earn-in arrangements (at Mt Freda, Golden Mile and probably the nearby Mt Scheelite
prospect) is going to provide essential information for Orion Resources to realise its aims to
re-establish mining and processing operations in and around the Lorena facility,” said Mr
Williams.
Cloncurry Project
Orion Resources Pty Ltd (Orion) has entered into an asset sale agreement (ASA) to acquire
the existing Lorena processing plant and associated facilities, situated approximately 15 kms
east of Cloncurry in northern Queensland, together with various exploration and mining
tenements in that area. As announced on 27 November 2024 AuKing proposes to earn-in a
15% interest in the Cloncurry project after incurring $1.5M in project expenditure before 31
December 2025.
Figure 1 – Orion’s Cloncurry Project interests, including the Mt Freda/Golden Mill mining
leases. [Note the nearby Wynberg and Wallace/Wallace South gold projects are not assets
being acquired by Orion]
The Lorena plant is a 250,000 - 300,000 tonne per annum Gold/Copper processing plant
and permitted tailings storage facility. In addition, Orion has acquired under the ASA
additional exploration and mining tenements approx. 30kms to the south of the Lorena plant,
2
described as the “Mt Freda/Golden Mile Project”. The overall tenure package being
acquired by Orion covers an area of 447km2 in the Cloncurry Region.
Orion Resources’ Mining Re-Commencement Plans
Orion is developing a pathway to re-establish mining and processing operations at the
Cloncurry project with a focus on restarting mining at the Mt Freda/Golden Mile deposits.
As part of its recommencement strategy, Orion’s immediate focus is summarised below.
Figure 2 – Lorena Processing Facility
Conceptual Mining Study and Mineral Resource Review
Orion has engaged an industry recognised exploration and mining consulting group for the
purposes of carrying out a Conceptual Mining Study and Mineral Resource Review of the Mt
Freda and Golden Mile (Comstock and Shamrock) project areas (which areas are the
subject of the AuKing earn-in agreement). The Conceptual Mining Study will update
previous mining studies undertaken by the same consultants. The Study work will include a
detailed review of the existing Mineral Resource estimation processes for the Mt Freda,
Comstock and Shamrock pits and recommendations for exploration and delineation drilling
to improve resource quality prior to undertaking further mine design and economic
assessment. Orion anticipates the Mining Study and Mineral Resource Review to be
complete late January/early February 2025.
Resource Estimates for Mt Freda/Golden Mile
On 4 March 2021 Ausmex Mining Group Limited (ASX: AMG) reported an upgraded mineral
resource for the Mt Freda deposit (as shown in Table 1 below). Mt Freda has been mined
historically, with remaining resources below the historical open pit controlled in their lateral
3
and vertical extents by a geological model. This model was created from lithological
descriptions and geochemical data collected from holes drilled by various explorers since
the 1980s.
Table 1 – Mt Freda mineral resource estimate (Refer AMG release to ASX 4 March 2021)
The primary intention of the proposed drilling to be conducted by AuKing under the earn-in
will be to establish greater confidence around the Mt Freda/Golden Mile resources and
facilitate proposed mining studies to support recommencement of mining and processing
activities. As noted above, the drilling will be guided largely by the outcomes of the
independent Conceptual Mining Study and Mineral Resource Review and further details will
be announced early next year.
Lorena Processing Study
Another key activity is study work focussed on recommissioning the Lorena facility. This will
include:
•
•
•
•
Capex associated with plant refurbishment;
Estimated operating costs and identification of suitable operating arrangements for
the facility (contractors, employees etc);
Crushing facilities;
Tailings storage facilities including expansion of facilities and the associated
regulatory approvals);
Orion’s Next Steps
Orion considers the Conceptual Mining Study and Resource Review will provide guidance to
proceed quickly through the typical project stage gates: Scoping, Pre-Feasibility and
Feasibility stages prior to a production decision. As this is effectively a “re-start” of
permitted mining and processing facilities in a region that is well familiar with mining
operations there is a level of comfort that the Study process will not be cumbersome.
Mt Scheelite Exploration and Drilling
AuKing proposes to follow up excellent near-surface gold results from a recent drilling
program conducted at Mt Scheelite.On 21 November 2022, Tombola Gold Limited (ASX:
TBA) reported results from 24reverse circulation (RC) holes (for a total of 2,020.6m) and 1
diamond (DD) hole (90.6m). Significant results from the program include:
•
15m @ 6.96g/t Au from 28m (MSDD001) including
4
•
•
•
•
6m @ 7.41g/t Au from 28m
5m @ 11.20g/t Au from 37.5m, including
2.5m @ 15.54g/t from 40m
21m @ 3.27g/t Au from 34m (MS22RC001) including
4m @ 11.53g/t from 34m
6m @ 6.9g/t Au from 47m (MS22RC003)
18m @ 5.1g/t Au from 23m (MS22RC004) including
6m @ 5.5g/t Au from 23m
5m @ 8.7g’t Au from 36m
14m @ 16.22g/t Au from 26m (MS22RC009) including
4m @ 51.89g/t Au from 27m including
2m @ 83.90g/t Au from 28m
As shown in Figure 3 below, Mt Scheelite is situated only 600m to the west of the Golden
Mile mining pits at Comstock and Shamrock. The extent of the initial near-surface gold
results at Mt Scheelite (when considering the proximity to the Mt Freda/Golden Mile areas)
makes it fairly evident that follow up drilling is required here and, where possible, will be
included in the proposed AuKing activities.
Figure 3 – Location of the Mt Scheelite drilling areas, with respect to the nearby Comstock
and Shamrock pits (Refer TBA release to ASX on 21 November 2022)
ASX Disclosure re Historical Exploration Results
This ASX release contains information derived from public disclosures of Ausmex Mining
Group Limited (ASX:AMG) and Tombola Gold Limited (ASX:TBA), both former owners of the
5
Lorena/Mt Freda/Golden Mile project areas. In accordance with ASX disclosure
requirements the following additional matters need to be noted:
• The historical mineral resource estimates and drilling results reported in this release
were made by a company other than AuKing namely, Ausmex Mining Group Limited
and Tombola Gold Limited – companies that were listed (at the time) on the ASX;
• Copies of the historical resource estimates and drilling results can be obtained from
the ASX announcements platform;
• The historical mineral resource estimate and drilling results at Mt Scheelite were
reported under the requirements of the JORC Code 2012;
• AuKing’s Competent Person believes that it is reasonable to rely on the resource
estimate and drilling results in the manner presented in this release;
• AuKing intends (from now on) to report its own exploration results after the conduct
of planned activities in accordance with the JORC Code 2012, utilizing historical data
as a general background rather than the basis for future reporting;
• Details of the proposed future activities and funding of those activities are set out
elsewhere in this release;
• A statement by Mr Chris Bittar, Competent Person is set out below;
• A cautionary statement in relation to the historical exploration results included in this
release is set out above; and
• AuKing has no other reason to suspect that the historical mineral resource estimate
as reported in this release are misleading.
This announcement has been authorised by Paul Williams, Managing Director, AuKing
Mining Limited.
For more information, please contact:
Paul Williams
Managing Director
Mobile +61 419 762 487
p.williams@aukingmining.com
Competent Persons’ Statement
The information in this report that relates to historical mineral resource estimate at the Mt
Freda Project and initial drilling results at the Mt Scheelite prospect is based on information
reviewed by Mr Chris Bittar who is a member of the Australasian Institute of Mining and
Metallurgy. Mr Bittar is an employee of AuKing Mining Limited and has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which they are undertaking to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Bittar consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
6
Share your feedback