ASX RELEASE
Final survey results confirm potential extensions of
carbonatite mineralisation at Myoff Creek Niobium/Rare
Earths Project, British Columbia
HIGHLIGHTS
• Airborne survey: A helicopter-borne high resolution aeromagnetic and radiometric
survey covering 70-line kms was recently flown across the Myoff Creek tenure area.
Preliminary survey results were announced to ASX on 23 September 2025. Final
survey data has now been received and assessed by AuKing.
• Carbonatite mineralization confirmed: Final survey results are consistent with
previously interpreted and drilled near-surface carbonatite mineralization in the
northern area of the project area which contained notable intercepts of niobium and
total rare earth oxides. (See ASX release by AuKing dated 22 July 2024).
• Potential carbonatite extension: The survey has also highlighted previously
untested anomalous areas of additional carbonatite mineralization in the central and
southern areas of the Myoff Creek project area, providing potential extensions of
carbonatite mineralisation and creating fresh exploration targets for follow-up.
• Cloncurry Gold Project acquisition progressing: As per AuKing’s 18 September
2025 ASX announcement, the Company has entered into a binding agreement to
acquire 100% of Orion Resources. This transaction will deliver full ownership of the
Cloncurry Gold Project, removing previous joint venture complexity.
AuKing’s Managing Director, Mr Paul Williams, said “The strong levels of market interest
in the exploration and development of rare earth elements (REEs) in North America provide
a solid backdrop for the Company releasing final survey results from the recently-completed
aeromagnetic and radiometric survey at Myoff Creek in south-eastern British Columbia. The
survey results are consistent with historical drilling that outlined a 1.4km by 0.4km near-
surface Nb-REE bearing carbonatite zone, while also highlighting the potential for significant
extensions of mineralisation across the broader tenure. AuKing will now assess the extent of
future exploration activities based on these potentially exciting results”.
2
Myoff Creek Project
Strategically located in south-eastern British Columbia, Canada, the Myoff Creek project is
situated in the South Central Mining Region, well known for mineral extraction and
processing. This region is host to some major mining operations including; Teck Resources
Limited’s Highland Valley Copper Mine, and Hudbay Minerals Inc’s Copper Mountain Mine.
The nearest township of Seymour Arm, which is accessible by road from the claims, has
accommodation and logistical support. Kamloops (population 108,000), the major
commercial centre for the region, has numerous resources such as equipment and
professional services for mining and exploration activities.
Figure 1 – Myoff Creek Project location
Airborne Survey Results
On 23 September 2025, AuKing announced preliminary survey results at Myoff Creek
derived from the conduct of a helicopter-borne high resolution aeromagnetic and
radiometric survey. Precision GeoSurveys Inc. provided these survey services.
The survey comprised 70-line kms flown in a systematic low-level grid pattern across the
entire Myoff Creek tenure area. With that survey having been completed, AuKing has now
received the final results that are set out below.
3
The presence of uranium and thorium is often associated with carbonatite-hosted rare earth
mineralization. Figure 2 on the left below illustrates the surveyed uranium-equivalent
mineralisation across the Myoff Creek project area and the location of historic drilling holes
where the Nb-REE mineralisation was detected (See AuKing release to ASX on 24 July
2024). It should be noted that the drill holes appear to be situated on a contact zone where
the previously-interpreted carbonatite mineralisation had been identified. Figure 3 on the
right below, illustrates the surveyed thorium-equivalent mineralisation across the Myoff
Creek project area. There are surveyed areas of anomalous uranium and thorium that have
not been previously identified in historical exploration and provide significant potential for
extensions of the historically-interpreted carbonatite mineralisation to the north.
Figure 2 – Uranium equivalent
concentration across the Myoff Creek
project showing correlation of historic drill
holes with radiometric survey
Figure 3 – Thorium equivalent
concentration across the Myoff Creek
project showing correlation of historic drill
holes with radiometric survey
Next steps
The high-resolution airborne radiometric survey has provided critical data for identifying and
prioritising drill targets across the Myoff project area, with a specific focus on features
associated with rare earth mineralisation.
By analyzing the patterns and ratios from the radiometric survey, AuKing can begin to
delineate the geometry and strike extension of the key rare earth-hosted carbonatite unit.
This integrated approach allows AuKing to focus its initial proposed drill program with
4
maximum precision, testing the strongest radiometric anomalies that represent the highest
potential for significant rare earth discovery and expansion of the known mineralisation.
Cautionary note re historical exploration results
In relation to the historical exploration results mentioned in this release, AuKing notes the
following:
• Historical results have not been reported in accordance with the JORC Code 2012;
• A Competent Person has not done sufficient work to disclose the exploration results
in accordance with the JORC Code 2012;
• It is possible that following further evaluation and/or exploration work that the
confidence in the prior reported exploration results may be reduced when reported
under the JORC Code 2012;
• Nothing has come to the attention of AuKing that causes it to question the accuracy
or reliability of the former owners’ exploration results; and
• AuKing has not independently validated the former owners’ exploration results and
therefore is not to be regarded as reporting, adopting or endorsing those results.
For more information, please contact:
Paul Williams
Managing Director
Mobile +61 419 762 487
p.williams@aukingmining.com
About AuKing Mining
AuKing Mining Limited (ASX: AKN) is an Australian resource company focused on the
exploration and development of gold and critical minerals projects. The Company’s portfolio
includes the Cloncurry Gold Project in north-west Queensland, anchored by the Lorena
processing plant and cornerstone deposits at Mt Freda and Golden Mile, and the Myoff
Creek niobium-REE Project in British Columbia, Canada. AuKing’s strategy is to create
shareholder value through advancing near-term development opportunities while
systematically exploring for longer-term discovery upside.
Competent Person’s Statement
The information in this Report that relates to the preliminary airborne survey and historical
exploration results at the Myoff Creek Project is based on information reviewed by Mr Chris
Bittar who is a member of the Australasian Institute of Mining and Metallurgy. Mr Bittar is an
employee of AuKing Mining Limited and has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which they
are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves.’ Mr Bittar consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
5
JORC Code, 2012 Edition – Final survey results show potential carbonatite
mineralisation extension at Myoff Creek Niobium/Rare Earths Project,
British Columbia, Canada
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• Not applicable
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Not applicable
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
• Not applicable
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• Not applicable
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Not applicable
6
Criteria JORC Code explanation Commentary
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
• No sampling data reported
• Final Radiometric maps have been provided.
• Radiometric data have been corrected for
effective height, aircraft, cosmic, radon,
stripped ratios, and attenuations and then
converted to apparent radiometric
concentrations.
• The survey was flown using an Airbus AS350
survey helicopter.
• Scintrex CS-3 cesium vapor airborne
magnetometer sensor; sensitivity better than
0.01 nT and sampling rate of 20 Hz providing
sample spacings of 1-2 meters, in a nose-
mounted stinger configuration with 3-axis
real-time compensation.
• 12.6 litres of self-calibrating NaI(Tl) gamma
radiation detection crystals with 512 channel
output at 1 Hz sampling rate.
• Line spacing (090°/270°) of 150 m at 40 m
height (40 Lines).
• Tie line (000°/180°) 1500 m spacing at 40 m
height.
Verification
of sampling
and assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Not applicable
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Not applicable
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• Not applicable
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Not applicable
7
Criteria JORC Code explanation Commentary
Sample
security
• The measures taken to ensure sample
security.
• Not applicable
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• Not applicable
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a license to operate in the area.
• The Myoff Creek project is located in British
Columbia, Canada on eight (8) Minerals
Claims numbered 1048172, 1048173,
1048179, 1048187, 1052092, 1089285,
1098734 and 1100756 and all of the
tenements are in good standing.
• There are no known third-party interests
affecting these Mineral Claims.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration
by other parties. • Cross Lake Minerals Ltd conducted a 346m
trenching program in 2001;
• International Bethlehem Mining Corp carried
out an 8 hole 1,134m drilling program in
2011; and
• MXG Minerals Inc, carried out a 14 hole
1,249m in 2018.
Geology • Deposit type, geological setting and style of
mineralisation. • Myoff Creek lies within the Proterozoic
(Aphebian) age metamorphic carbonatite
belt of the Shuswap Metamorphic Complex,
a belt of high-grade and intensely deformed
metamorphic and intrusive rocks in the core
of the Columbian Orogen in south-eastern
British Columbia. This is a known area for
Nb-REE-P-Ti bearing carbonatites. The
Shuswap Complex, along its eastern margin,
is characterized by a series of fault-bounded
domal culminations that expose mixed
paragneiss, granitic gneiss and migmatite of
Paleoproterozoic age.
• There are two types of carbonatite
recognized in the area. Type I, the intrusive
phase (the REN carbonatite) and Type II, the
extrusive phase (the Mount Grace
carbonatite – MGC). These carbonatites are
generally rich in rare earths and other critical
minerals with low impurities, while remaining
close to the surface. Myoff Creek is a
Nephelinitic and ultramafic carbonatite-
hosted deposit type up to 200m thick. This is
similar to the Aley and Wicheeda
carbonatites – both situated in northern
British Columbia.
Drill hole
information
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
• Not applicable
8
Criteria JORC Code explanation Commentary
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Not applicable
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
• Not applicable
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be included
for any significant discovery being reported.
These should include, but not be limited to a
plan view of drill hole collar locations and
appropriate sectional views.
• Diagrams have been included within the
main body of text and are considered
preliminary only. Final corrections and
processing are still to be completed.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Not applicable
Other
substantive
exploration
data
• Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples - size and method
of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• As per body of the release.
Further work • The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large- scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
• Further work is expected to include mapping
and sampling over the target areas identified
in the radiometric surveys.
9
Share your feedback
Discover