ASX ANNOUNCEMENT
11 November 2026
Updated Halls Creek Scoping Study outlines Copper-Zinc-
Silver Development in WA
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to provide a significant
update from its joint venture partner Cobalt Blue Holdings Limited (ASX: COB) (“CBH”) which has
announced the results of an updated Scoping Study (Study) for the Halls Creek Project in Western
Australia (Project).
Important Cautionary Statement
The CBH announcement includes a Cautionary Statement in relation to the Study results. Refer to
pages 2 and 3 of CBH’s ASX announcement dated 10 November 2026 titled “Updated Halls Creek
Scoping Study Outlines Copper-Zinc-Silver Development”.
CBH’s Study updates the Scoping Study announced on 6 June 2025, outlining staged development
of the Onedin and Sandiego deposits, using a common processing plant at Onedin to produce
copper cathode, zinc oxide and silver doré, with initial cash flow from processing Onedin material
to fund the subsequent development of Sandiego. Key Study highlights include the following:
• Project value: Pre-tax NPV₁₀ of approximately A$317 million and a pre-tax IRR of approximately
47% on a 100% project basis, generating approximately A$681 million in life-of-mine free cash
flow (pre-tax).
• Silver value unlocked: The Scoping Study update incorporates silver recovery for the first time,
establishing a significant third revenue stream from metal contained within both Onedin and
Sandiego.
• Capital and payback: Initial capital is estimated at A$75m and payback of approximately 3
years from first production.
• Production: Average annual production of approximately 4,000 t copper cathode, 13,000 t
contained zinc as zinc oxide and 130,000 oz silver doré over an estimated 11 years of
production.
• Capitalefficiency:One plantproducingthree saleable metals. A commonprocessingpathway
for Onedin and Sandiego replaces the previously proposed Sandiego flotation concentrator,
providing shared infrastructure for the recovery of three saleable metals.
• District-scale growth potential: The common plant provides a platform to incorporate
additional regional feedstock, potentially supporting increased production, longer mine life
and stronger Project economics.
Page 2 of 2
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
• Next steps: Advance the Project through a Pre-Feasibility Study, targeting completion in H1
2028. CBH has exercised its right to increase its interest (currently 51% - with AuKing holding
the other 49%) to 75% by sole funding a further A$1.5 million on the Halls Creek tenements by
30 June 2028.
For full details of CBH’s 10 November announcement, please refer to CBH’s ASX platform or
website www.cobaltblueholdings.com.
Note:
The technical and economic metrics for the Halls Creek Project outlined in this announcement are
sourced from the updated Scoping Study released to the ASX by our joint venture partner CBH, on
10 November 2026 titled “Updated Halls Creek Scoping Study Outlines Copper-Zinc-Silver
Development”.
AuKing confirms that it is not aware of any new information or data that materially affects the
information included in that market announcement, and that all material assumptions and
technicalparameters underpinningthe estimates inthat announcementcontinue toapply and have
not materially changed.
Approved by the Board of AuKing Mining Limited.
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
AuKing’s Managing Director Paul Williams said “Work by our JV partner Cobalt Blue
Holdings has significantly improved the development potential of the Halls Creek copper-
zinc-silver project (also previously known as “Koongie Park”). With a clear shortage of new
copper supply projected over the coming years, the economics of this project are likely to
improve as the study work continues. It is also very encouraging to see the inclusion of a
separate silver doré as a potentially viable third product from this project.
“While our focus is on rare earths and niobium exploration in Malawi and Greenland, we
maintain exposure to base and precious metal commodities through our interest in this
project, with CBH set to invest further in it. We will eagerly await further results from CBH as
its JV work proceeds.”
Share your feedback
Discover