Commencement of Diamond Drilling at Tundulu
Released
Released
Announcement PDF
AUKING MINING LIMITED ABN 29 070 859 522
Suite 34, Level 10, 320 Adelaide Street, Brisbane Queensland 4000
P 07 3535 1208 W www.aukingmining.com
ASX:AKN
Page 1 of 9
ASX ANNOUNCEMENT
31 July 2026
Tundulu Diamond Drilling Commences
Highlights
• Strong exploration momentum continues at the Tundulu Rare Earths Project in southern
Malawi, with the reverse circulation (RC) drilling phase now completed, comprising 4,300m
drilled across 31 holes.
• Carbonatite intersections have been confirmed in 28 of the 31 RC drill holes, further validating
the interpreted Tundulu geological model. The nature, grade and extent of any rare earth
mineralisation remain subject to laboratory assay results.
• Successful mobilisation of diamond drill rig to site, with the diamond drill program now
underway.
• Up to 10,000m of diamond drilling is planned for the remainder of the year, comprising a
combination of drillholes from surface and diamond tails extending selected RC drillholes. The
program is designed to test the depth continuity of the interpreted carbonatite system beneath
Nathace Hill, Tundulu East and Kamilala Hill.
• Five (5) export permits for a total of 2,992 RC drill samples have now been obtained, with
samples either at Intertek’s assay laboratory or in transit. A further 1,516 RC drill samples are
progressing through the export approval process. Assays from the first four drill holes are
anticipated in the near term.
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to confirm that the
maiden drilling program at the Tundulu rare Earth Project in southern Malawi has progressed to the
diamond drilling phase after making excellent progress with the RC phase of program.
AuKing’s Managing Director Paul Williams said: “AuKing’s exploration team has made an excellent
start to the proposed 15,000m maiden drilling program at Tundulu, with more than 4,000m of RC
drilling already completed across 31 holes and with the deeper diamond drilling about to
commence.”
“We have already established a striking feature from the early drilling at Tundulu in the form of the
interpreted carbonatite intersections across almost all of the drill holes to date, and not just those
holes in and around Nathace Hill (the subject of significant historical drilling), but also areas to the
west and north-east of that main area. We are now entering an exciting phase of the program that will
feature the publication of assay results from the RC drilling as well as commencing the diamond
drilling that will start to test the depth extents of the carbonatites at Tundulu.”
Page 2 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Completion of RC Drilling
AuKing’s drilling contractor, Thompson Resources, has now completed the RC component of the
initial Tundulu drilling program, having drilled 4,300m across 31 holes. Detailed geological logging
of all these RC drillholes has been completed, confirming widespread carbonatite lithologies
throughout the current drilling area. The first two holes drilled (26NH004 and 26NH005) were
deliberatelylocatedadjacenttohistoricaldrillholes tovalidate historicalgeologicalinterpretations
for future resource studies and establish internal lithological markers for ongoing logging, as no
historical RC chips or drill core have been retained by previous explorers. Geological logging of the
validation holes identified multiple oxidised ferruginous carbonatite intervals displaying abundant
dark carbonate-rich fragments and pervasive iron oxide/goethite alteration, interlayered with
highly magnetic mafic dolerite. The observed lithologies are consistent with those recorded in the
corresponding historical drillholes, with mafic dolerite intersections occurring within only a few
metres of previously reported depths, providing increased confidence in the geological continuity
of the principal intrusive units.
Figure 1 – Tundulu Project, highlighting the location of the main target area for drilling at Nathace
Hill with nearby Kamilala Hill to the north
Of particular interest is the interpretation of carbonatite material in drillholes situated well away
from the primary Nathace Hill target area, which has been the focus of previous exploration. As
illustrated in Figure 2 below, these step-out drillholes were specifically designed to test targets
generated from the recent airborne magnetic survey. Carbonatite lithologies were intersected in
each of these drillholes, providing geological support for the Company's exploration model.
Page 3 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Geological logging indicates that carbonatite has been intersected in 28 of the total 31 RC
drillholes completed (90%), with cumulative logged carbonatite exceeding 2,100m across the
program. Seven drillholes contain more than 100 m of logged carbonatite, demonstrating the
continuity and substantial scale of the intrusive complex beyond the historically drilled Nathace
Hill area. These observations will be integrated with laboratory assay results to refine the
geological model and optimise the planned diamond drilling program.
Figure 2 below illustrates the location and direction of each of the completed RC drillholes and the
table in Annexure A provides further particulars of those holes.
The widespread occurrence of carbonatite intersected during the current drilling program supports
the Company's geological interpretation of an extensive carbonatite intrusive complex. Geological
logging and laboratory assay results from the current drilling program will be integrated with
historical drilling data and recent airborne magnetic survey interpretations to refine the geological
model and guide subsequent diamond drilling.
Figure 2 – Tundulu Project drillhole collar locations and drillhole traces for the completed AKN RC
drilling program with historic drillhole collar locations depicted in yellow.
Diamond Drilling at Tundulu
Thompson Resources has now demobilised its RC rig at Tundulu and this is being replaced by the
diamond drilling rig at site either today or over the weekend. The diamond drilling is planned to be
Page 4 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
conducted in two shifts every 24-hour period, with the aim of averaging 80m of diamond drilling per
day. With limited breakdowns and other interruptions, this could allow AuKing to complete in the
order of 10,000m of diamond drilling at Tundulu before the end of the year.
The planned diamond drilling will comprise a mix of drillholes from surface and others undertaken
from the base of select completed RC holes that have already been drilled to around 150m depth.
The purpose of the diamond drilling will be to test the depth extent of the carbonatite system
particularly around Nathace Hill, with two planned drillholes in the order of 500m to be drilled.
Diamond core samples will also be utilised for the purposes of preliminary metallurgical and
mineralogical testwork, all of which is intended to form the basis for an initial mineral resource
estimate at Tundulu either at the end if this year or early 2027, during the local wet season at
Tundulu.
Tundulu Sample Export Approvals
AuKing’s exploration team has achieved success in now obtaining export approvals for a large
amount of the samples generated from RC drilling. Sample batches 1-4 comprising 2,360 samples
are now the subject of preparation and assay analysis with Intertek. Batch 5 (632 samples) has just
received export approval and will shortly be dispatched to Intertek’s Zambia facility for
preparation. The final two batches from the RC drilling (batches 6-8, 1,516 samples in total) have
export permit approval pending.
Based upon these sample numbers, a substantial amount of assay data and information will
become available to the Company (and reported to ASX) over the next 6-8 weeks. After that time,
the process of diamond drilling core samples being approved for export (and then assayed by
Intertek) will have already commenced. The continuous news flow from these activities is expected
to be extensive until towards the end of 2026.
Approved by the Board of AuKing Mining Limited.
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
Competent Persons’ Statement
The information in this report that relates to airborne survey results at the Tundulu Rare Earths
Project is based on information reviewed by Mr Ian Hodkinson who is a member of the Australian
Institute ofGeoscientists. MrHodkinsonis aconsultantto AuKingMiningLimited andhas sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which they are undertaking to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr Hodkinson consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Page 5 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
ANNEXURE A
Tundulu drillhole location details
HOLE TYPE EAST NORTH RL TOTAL
DEPTH
AZIMUTH DIP
26NH001 RC + DDH 800843 8280000 718 150 61 -55
26NH002 RC + DDH 800760 8280073 707 150 80 -65
26NH003 RC + DDH 800793 8280154 702 148 100 -65
26NH004 RC + DDH 801110 8279895 769 145 10 -55
26NH005 RC + DDH 801061 8279878 762 150 15 -60
26NH006 RC 801236 8280249 744 150 180 -55
26NH007 RC + DDH 800892 8280261 709 90 110 -65
26NH008 RC + DDH 800767 8279894 704 150 45 -55
26NH009 RC + DDH 800831 8279788 722 150 60 -65
26NH011 RC 800763 8280073 708 150 90 -65
26NH012 RC + DDH 800792 8280219 704 129 130 -65
26KH013 RC + DDH 801545 8280891 682 150 35 -65
26NH014 RC + DDH 800869 8279930 723 150 220 -70
26TH015 RC + DDH 802435 8280480 665 123 265 -55
26TH016 RC 802433 8280484 665 76 0 -90
26KH017 RC 801471 8281140 676 85 0 -90
26NH018 RC 801405 8280336 693 150 0 -90
26NH019 RC 801108 8279894 769 150 0 -90
26TH020 RC + DDH 802091 8280738 666 144 230 -65
26TH021 RC 801908 8280812 649 150 230 -65
26NH022 RC 800797 8280211 702 110 0 -90
26NH023 RC + DDH 801395 8280297 702 150 220 -55
26TH025 RC + DDH 801797 8280432 712 150 90 -65
26TH026 RC + DDH 801693 8280250 633 150 90 -65
26NH027 RC + DDH 801031 8280262 671 129 180 -55
26KH028 RC + DDH 801462 8281143 619 148 180 -65
26NH029 RC + DDH 801103 8279857 749 150 10 -55
26NH030 RC + DDH 800768 8279888 716 148 250 -75
26NH031 RC + DDH 800892 8280265 709 125 360 -55
26NH032 RC + DDH 801423 8280349 657 150 225 -55
26NH033 RC + DDH 801305 8280234 732 150 210 -55
[Note – references to DDH in the “TYPE” column indicate planned diamond drilling tails at
the base of the RC-drilled hole]
Page 6 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
JORC Code, 2012Edition – “Tundulu Diamond Drilling Commences”
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as
where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Reverse Circulation (RC) drilling was
completed using a face-sampling hammer.
• All drillholes were sampled on continuous 1 m
intervals irrespective of lithological
boundaries.
• Sample material was collected from the
cyclone into green mining bags before being
processed using a manual three-tier riffle
splitter to obtain representative calico
samples. Where wet or clay-rich conditions
prevented representative riffle splitting, a
documented spear sampling protocol was
used.
• Geological logging was completed on every
metre using representative RC chips retained
from each interval.
• Sampling procedures were undertaken in
accordance with Company Technical Work
Guideline TWG001.
• The massive nature of the mineralised host unit
is amenable to an industry standard RC
sampling methodology being applied.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Reverse Circulation drilling utilised a face-
sampling hammer with compressed air.
• Drillholes were completed at the planned
orientations using surveyed collar locations
and downhole surveys where appropriate.
• Representative drill chips were collected at 1 m
intervals for geological logging and sampling.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• The bulk weight of each 1 m RC sample was
recorded prior to sample splitting, providing a
quantitative record of sample recovery and
enabling identification of intervals with
anomalously low sample return.
• Bulk sample weights were recorded as a quality
control measure to monitor sample return.
Generally, the range of those weights were 35-
40kgs.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• Representative RC chip trays were prepared and
geologically logged in full at 1 m intervals for all
drillholes.
• Logging included lithology, weathering,
alteration, mineralisation, veining, carbonate
content, magnetic response, grain size, colour
and other relevant geological observations.
• Logging was mostly qualitative in nature and
completed to a level of detail considered
appropriate to support geological interpretation
and future Mineral Resource estimation.
• Geological observations were recorded
independently of any assay information in
accordance with Company logging procedures.
Sub-sampling
techniques
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• Representative primary samples were obtained
using a manual three-tier riffle splitter.
• Wet or clay-rich samples unsuitable for riffle
Page 7 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
and sample
preparation
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whethersample sizesare appropriate tothe grain
size of the material being sampled.
splitting were collected using a documented
multi-pass spear sampling methodology.
• Approximately 2–4 kg of sample was collected
into pre-numbered calico bags.
• Remaining reject material was retained in
labelled plastic bulker bags.
• Sample preparation procedures were designed
to minimise sample bias and maintain
representative sampling throughout the drilling
program.
Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
• No assay data is reported.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Geological logging was completed using
standardised electronic logging templates.
• All geological observations were recorded prior
to receipt of analytical results.
• Logging and sampling procedures were
undertaken by Company geologists following
documented Company procedures.
• Sample submissions, QAQC insertion and
laboratory dispatch were recorded using
Company sample management systems.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drillhole collar locations were determined
using a handheld GPS.
• Grid system is in WGS 84 UTM Zone 36 South
• Elevations were determined from previously
reported LiDAR drone survey.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drillhole spacing is irregular and dependant on
the target areas.
• It is considered that the spacing of samples
used is sufficient for the current stage of
exploration.
• No drill sample compositing has occurred.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
• Drillholes were oriented to test the interpreted
geometry of the Tundulu carbonatite intrusive
complex based on historical drilling, geological
mapping and airborne magnetic data.
• Step-out drillholes were designed to test
interpreted extensions of the carbonatite
system beyond historically drilled areas.
• The true orientation of individual carbonatite
phases has not yet been established; reported
intercepts are downhole lengths and true
Page 8 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
widths are currently unknown.
• No orientation-related sampling bias has been
identified.
Sample
security
• The measures taken to ensure sample security. • Samples remained under Company
supervision from collection through logging and
preparation.
• Calico samples were sealed within labelled
polyweave bags for transport in company truck
to warehouse facilities.
• Sample batches were documented using
Company sample submission registers prior to
dispatch to the preparation and analytical
laboratories.
• Remaining RC reject material was retained
onsite in labelled green mining bags where
appropriate.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• Sampling and logging procedures were
undertaken in accordance with Company
Technical Work Guideline TWG001.
• Internal reviews of geological logging, sampling
procedures and QAQC protocols are
undertaken throughout the drilling program.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• AuKing’s Tundulu REE project is located in
southeastern Malawi, approximately 90 km
east of Blantyre.
• The Tundulu Project lies within Exploration
Licence No. EL0731/24 which was granted on
27 May 2024.
• EL0731/24 covers an area of approximately
91.5 square kilometres.
• The Licence is currently 100% held in the name
of Malawian registered Green Exploration Ltd, a
subsidiary of Tusker Minerals Limited and, as
set out in the above release, is the subject of a
transfer approval with the Malawi MMRA.
• There are no known third-party interests
affecting the Licence.
• There are no known impediments to operating
in the project area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Drill hole
information
• A summary of all information material to the
under-standing of the explorationresultsincluding
a tabulation of the following information for all
Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Page 9 of 9
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Data have not been aggregated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
• Reported intersections are downhole lengths.
The true widths of any mineralised intervals are
not yet known.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• All relevant data is reported within the body of
this announcement.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• All relevant data is reported within the body of
this announcement.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
- size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• All relevant data is reported within the body of
this announcement.
Further work • The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large- scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Selective drill program to test the lateral
extents, vertical depths, widths, and
continuation of known mineralization and test
new targets under post-mineralization
sedimentary cover identified from the
outcomes of this survey.
Share your feedback
Discover