1 June 2023
ASX RELEASE
Koongie Park copper mine development to progress after
positive Scoping Study results
AuKing Mining Limited (ASX: AKN) will progress its Koongie Park copper/zinc Project
in Western Australia’s Hall’s Creek region to more advanced development studies
after a Scoping Study completed this month confirmed the potential for a financially
robust, globally competitive operation.
The Study showed the mine would source mineralisation from four open pit mines
and an underground mine for an estimated total production of 110kt Cu, 38kt Zn and
355koz Ag over an 11 year mine life.
CAUTIONARY STATEMENTS
The Scoping Study referred to in this announcement is a preliminary technical and
economic study of the potential viability of developing the Koongie Park Copper/Zinc
Project by establishing a mine at Sandiego and constructing a processing facility onsite.
The proposed development includes the nearby Onedin deposit together with the Mt
Angelo North and Bommie deposits owned by Cazaly Resources Ltd (ASX:CAZ). The
Scoping Study referred to in this announcement is based on low-level technical and
preliminary economic assessments and is insufficient to support estimation of Ore
Reserves or to provide assurance of an economic development case at this stage, or
certainty that the conclusions of the Scoping Study will be realised.
The Study is based on the material assumptions outlined below. These include
assumptions about the availability of funding. While AKN considers all of the material
assumptions to be based on reasonable grounds, there is no certainty that they will prove
to be correct or the range of outcomes indicated by the Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, development funding
in the order of A$135M will likely be required. Investors should note that there is no
certainty that the Company will be able to raise that amount of funding when needed. It is
also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of AKN’s existing shares.
1
It is also possible that AKN could pursue other “value realization” strategies such as a
sale, partial sale or joint venture of the project. If it does, this could materially reduce the
Company’s proportionate ownership of the project. Given the uncertainties involved,
investors should not make any investment decision based solely on the results of the
Scoping Study.
For the first 8 years of production (from the Sandiego, Mt Angelo North and Onedin
deposits) 89%, 100% and 58% respectively is in the Indicated Mineral Resource category
and the balance is in the Inferred Mineral Resource Category across the different
deposits. The Company has therefore concluded it has reasonable grounds for disclosing
a Production Target, given that the Scoping Study assumes that in the first 8 years of
operation, an average of 86% of the production is from the Indicated Resource category.
The inferred mineral resource is not considered to be a determining factor in determining
the viability of the Koongie Park Project.
There is a low level of geological confidence associated with Inferred Mineral Resources
and there is no certainty that further exploration work will result in the determination of
further Measured or Indicated Mineral Resources or that the Production Target or
preliminary economic assessment will be realised.
For full details of the Mineral Resource Estimates for the Sandiego and Onedin
Resources, including JORC Table 1, please refer to AuKing ASX Release – on 7 April
2022. For full details of the Mineral Resource Estimates for the Mt Angelo North and
Bommie Resources, including JORC Table 1, please refer to Cazaly ASX Releases on 31
January 2022 and 2 December 2022 respectively. AuKing confirms that it is not aware of
any new information or data that materially affects the information included in those
releases. All material assumptions and technical parameters underpinning the estimates
in those announcements continue to apply and have not materially changed.
This announcement contains forward-looking statements. AuKing has concluded that it
has a reasonable basis for providing these forward-looking statements and believes it has
a reasonable basis to expect it will be able to fund development of the Koongie Park
Project. However, several factors could cause actual results or expectations to differ
materially from the results expressed or implied in the forward-looking statements. Given
the uncertainties involved, investors should not make any investment decisions based
solely on the results of this study. The Study has been completed to a level of accuracy of
+/-30% in line with industry standard accuracy for this stage of development. All dollar
figures are presented in Australian dollars (AUD) except where specifically otherwise
indicated.
2
Koongie Park copper mine development to progress after
positive Scoping Study results
Key Highlights
Scoping Study confirms the potential for a financially robust, globally competitive
copper/zinc project in north-east Western Australia, including nearby deposits
owned by Cazaly Resources Ltd (ASX:CAZ).
• Mineralisation to be sourced from four open pit mines (Sandiego, Mt Angelo North,
Onedin and a later-staged operation at the low-grade Bommie) and an underground mine
at Sandiego – all to be processed from a central facility at Sandiego
• Total Mineral Resource Estimates (MRE) across the deposits are:
Sandiego – 4.1Mt @ 1.38% Cu, 4.28% Zn, 25g/t Ag
Onedin – 4.8Mt @ 0.7% Cu, 3.2% Zn, 0.3g/t Au and 38g/t Ag
Mt Angelo North – 1.72Mt @ 1.4% Cu, 1.4% Zn and 12.3g/t Ag
of which 86% is in the Indicated category across these three deposits, and
Bommie – 95.6Mt @ 0.27% Cu
of which 17% is in the Indicated category
• Life-of-Mine (LOM) of 11 years with an estimated total production of 110kt Cu, 38kt Zn
and 355koz Ag
• Processing nameplate capacity is 750ktpa of run-of-mine (ROM) ore
Strong project economics and financial returns
• Pre-production Capex of A$134M, with an estimated 2.45 years payback period
• Robust pre-tax NPV8% of approximately A$176.9M and 39.7% IRR
• Life of Mine EBITDA of A$443.8M with an average operating cashflow of A$40.3M per
annum.
Board approval to proceed with further study work
• AKN is currently finalising its forward work plan for next stage studies. The Company has
sufficient funds to commence further study work and to fund ongoing exploration.
3
AuKing Mining Limited CEO, Paul Williams commented, “The results of the Scoping Study
show the potential to establish a significant copper/zinc mining operation near Halls Creek
in north-east Western Australia. The exploration team worked extremely hard throughout
late 2021 and 2022 to provide a solid foundation for the Scoping Study. The proposed
contribution of the nearby deposits of Cazaly Resources also makes a significant
contribution to the project economics.
“The AuKing Board is delighted with the robustness of the Project and its resilience to
multiple factors that the resource industry is experiencing in Western Australia with
increasing cost escalation and market conditions. The development team will now diligently
progress all the necessary technical components and engineering work streams to ensure
the Project is sufficiently de-risked allowing the Company to progress further development
studies and possibly a final investment decision late next year. The Board has approved
the commencement of further studies at the Project due to the compelling economics and
the continuing strong copper market fundamentals.”
Figure 1 – Koongie Park Project deposit locations
4
Key Project Metrics
Key metrics below for the Koongie Park Scoping Study are set out below.
Key Metrics
Unit
Value
LOM Ore Mined & Processed
tonnes, Mt
8,087,891
LOM Copper Production
tonnes, t
109,893
LOM Zinc Production
tonnes, t
38,405
LOM
Years
11.45
LOM Average Product Grade – Copper
%
1.72
LOM Average Product Grade – Zinc
%
1.06
NPV (8%) (Pre-Tax)
AUD M
176.9
IRR (Pre-Tax)
%
39.7
Payback (start of production)
# Years
2.45
Initial Capex
AUD M
134.6
C1 Costs1
AUD/t
Concentrate
7,197
Average Copper Price
USD/lb
3.90
Average Zinc Price
USD/lb
1.33
Average Annual Revenue
AUD M
143.6
Average Annual OPEX
AUD M
103.3
Average Annual EBITDA
AUD M
40.3
Table 1 – Koongie Park Project Key Metrics
1. Cash operating costs include all mining, processing, transport, freight to port, port costs and site
administration. Excludes sustaining capital and WA Royalties.
The Scoping Study has been completed with the assistance of highly experienced and
reputable independent consultants based in Western Australia, overseen by Wave
International as Project Manager. Wave International is a resource development consultant
with more than twenty years of global experience in engineering, project
delivery, project, and asset management.
5
The Scoping Study was completed to an overall estimating accuracy of +/-30% (Class 5
estimate) and has a basis date for Q2 CY23. The Project is based on a 750ktpa mining and
processing operation with the Study demonstrating strong financial metrics. The
preliminary economic evaluation indicates the Koongie Park Project will generate
significant net cash flows over an initial 11 year life-of-mine (LOM) with a capital payback of
2.4 years following first production.
Capital Costs
Capital costs are derived from various sources including the engineering database of Wave
International and estimates based on recent actual pricing from similar WA mining
operations. They include all pre-production site, processing plant, tailings dam and mining
development and also sustaining capital post-production target start-up, as illustrated
below:
Pre-Production Capital
Value
($M)
Site Infrastructure
11.7
Processing Facilities
60
Water Management
3.6
Underground Development
0
Open Pit Development
2.2
Total Pre-Production
77.5
Sustaining Capital – Life of Mine
59
Indirect Costs
34
20% Contingency
23
Total
134.5
Table 2 – Koongie Park Project Capital Cost Requirement
Operating Costs
Operating costs are derived from a number of sources including quotations supplied by
vendors, the engineering database of Wave International and estimates based on similar
WA mining operations.
6
Operating Costs
$M
$/t milled
$/t payable
Mining
649
80
4,375
Processing1
421
52
2,838
C1 Cash Cost
1,070
132
7,222
Royalty
79
9
532
Sustaining Capital
59
7
397
1,208
148
8,143
All-in Sustaining Cost (AISC)2
Table 3 – Koongie Park Project Operating Costs Breakdown
1. Processing costs include all site G&A, transportation and treatment charges. Excludes
sustaining capital and WA Royalties.
2. All-In Sustaining Cost (AISC) includes C1 cash cost, royalties and sustaining capital. It does not
include corporate cost, exploration cost and non-sustaining capital.
Other Considerations
Funding
In order to achieve the range of outcomes indicated in the Scoping Study, funding in the
order of $135M will likely be required to commence production. AuKing has formed the
view that there is a reasonable basis to believe that requisite funding for development of
the Project will be available when required. The grounds on which this reasonable basis is
established include:
The Project has strong technical and economic fundamentals which provides an
attractive return on capital investment and generates robust cashflows at
conservative copper price assumptions. This provides a solid platform to source
debt and equity funding.
The Project presents an opportunity for the establishment of a significant
copper/zinc/silver operation in a Tier One mining jurisdiction, with an estimated
mine life of almost 12 years. In the current market where there is an expanding
trend towards electrification and green energy, the Project appears ideally placed to
attract investor and other funding support as development progresses.
In a relatively short period of time, AuKing has established a track record of
securing funding for the conduct of development activities at Koongie Park as and
when funding has been required.
It is AuKing’s intention to appoint a corporate finance advisor in the near term to
7
assist with the sourcing of debt and equity funding as and when it is required over
the next few years.
There is, however, no certainty that AuKing will be able to source funding as and when
required. Typical project development financing would involve a combination of debt and
equity. It is possible that such funding may only be available on terms that are dilutive to or
otherwise affect the value of AuKing’s existing shares.
Status of government agreements and approvals critical to Project viability
All of the working areas in the Scoping Study (with the exception of Bommie) are on
approved mining licences with no current issues or outstanding requirements with DMIRS.
There are no third party unresolved matters that are likely to impact upon approvals. In the
case of the Bommie deposit, mining activities are not intended until year 8 of the mining
schedule by which time it is expected that any unresolved statutory or commercial issues
have been settled.
Onedin and the AmmLeach® Process
AuKing has conducted a series of small-scale tests on the oxide and transitional ores at the
Onedin deposit to assess the potential application of the AmmLeach® ammonia-leaching
process. This testwork program, which has been registered with the Commonwealth
Government’s R&D Incentive program is seeking to assess the potential to establish an
alternative processing methodology for these Onedin ores that produces high recoveries.
A significant amount of further testwork is planned here, based around a proposed prefeasibility study to be managed by Perth-based Simulus Group.
In the meantime, with the addition of a sulphidisation plant into the proposed Scoping
Study metallurgical process (especially for the semi-weathered or oxide materials), a basecase processing methodology has been established and is considered appropriate for this
Study. It remains to be seen whether the recoveries at Onedin utilising the AmmLeach®
process can be demonstrated to exceed those expected to be achieved utilising the
flotation method.
Emull Deposit
On 1 December 2022 AuKing announced to ASX details of a maiden resource estimate for
its Emull Deposit comprising 12.2Mt @ 0.27% Cu, 0.38% Zn, 0.09% Pb and 4.9g/t Ag. As
can be seen in Figure 1 above Emull is located within a close proximity to the proposed
developments around the Sandiego deposit. AuKing has plans for additional drilling at
Emull which is aimed at significantly increasing the existing resource estimates and these
could support a future mining operation at Emull. However, at this stage, no provision for
mining at Emull has been included in the Scoping Study.
8
Reasonable Basis for Forward-Looking Statements
No Ore Reserve has been declared in the Study. This ASX release has been prepared in
compliance with the JORC Code (2012) and the ASX Listing Rules. All material
assumptions on which the Study production target and project financial information are
based have been included in this release. Consideration of Modifying Factors in the format
specified by JORC Code (2012) Table 1, Section 4 is attached to this release.
This announcement has been authorised by Paul Williams, CEO, AuKing Mining
Limited.
For more information, please contact:
Paul Williams
Chief Executive Officer
Mobile +61 419 762 487
p.williams@aukingmining.com
Gareth Quinn
Investor Relations
Mobile + 61 417 711 108
gareth@republicpr.com.au
About AuKing Mining
AuKing Mining (ASX:AKN) is a mining exploration company focused on uranium, copper and zinc
projects in both Tanzania and Australia.
For further information
www.aukingmining.com
9
KOONGIE PARK COPPER ZINC PROJECT
5943
AUKING MINING
May 2023
PROJECT BRIEF
Project Number
5943
Project Title
KOONGIE PARK COPPER ZINC PROJECT
Client
AUKING MINING
Client Contact
Paul Williams
Client Address
Suite 27, Level 7, Christie Centre, 320 Adelaide Street, Brisbane QLD 4000
DOCUMENT STATUS
Rev
A
Date
Description
By
Reviewed
Approved
29 May 2023
Scoping Report
MR
SW
MR
DISCLAIMER
This document has been produced on behalf of, and for the exclusive use of the nominated recipient, and is issued for the
purposes of the proposed works only. Wave International accepts no responsibility or liability whatsoever in respect to use of
this document by any third party.
The information contained within the document is confidential and subject to copyright.
This document shall not be copied, transmitted or divulged to other parties without the prior written consent of Wave
International’s duly authorised representative.
i
KOONGIE PARK COPPER ZINC PROJECT_
TABLE OF CONTENTS
1
INTRODUCTION ....................................................................................................... 1
1.1
SUMMARY .................................................................................................................................................................. 1
1.2
GLOSSARY ................................................................................................................................................................... 3
2
SCOPE ...................................................................................................................... 4
3
STUDY CONTRIBUTORS ............................................................................................ 5
4
LOCATION, OWNERSHIP AND TENURE ..................................................................... 6
5
4.1
LOCATION AND ACCESS .............................................................................................................................................. 6
4.2
TOPOGRAPHY AND CLIMATE ...................................................................................................................................... 6
4.3
TENURE ....................................................................................................................................................................... 7
4.4
NATIVE TITLE............................................................................................................................................................... 8
GEOLOGY AND RESOURCE ....................................................................................... 9
5.1
6
REGIONAL GEOLOGY KOONGIE PARK ......................................................................................................................... 9
5.1.1
Koongie Park Formation ............................................................................................................................... 9
5.1.2
Coolibah Tuff Member ................................................................................................................................. 9
5.1.3
Mimosa Sub-Member ................................................................................................................................. 10
5.1.4
Camp Shale Member .................................................................................................................................. 10
5.1.5
Weldon’s Creek Lava Member ................................................................................................................... 10
5.2
REGIONAL GEOLOGY MT ANGELO NORTH ............................................................................................................... 10
5.3
MINERAL RESOURCE ESTIMATE................................................................................................................................ 11
5.3.1
GENERAL ..................................................................................................................................................... 11
5.3.2
SANDIEGO ................................................................................................................................................... 11
5.3.3
ONEDIN ....................................................................................................................................................... 11
5.3.4
MT ANGELO NORTH ................................................................................................................................... 12
5.3.5
BOMMIE ..................................................................................................................................................... 13
MINING ................................................................................................................. 14
6.1
6.2
OPEN PIT MINING ..................................................................................................................................................... 14
6.1.1
GENERAL ..................................................................................................................................................... 14
6.1.2
SANDIEGO ................................................................................................................................................... 14
6.1.3
ONEDIN ....................................................................................................................................................... 17
6.1.4
MT ANGELO NORTH ................................................................................................................................... 19
6.1.5
BOMMIE ..................................................................................................................................................... 20
6.1.6
OPEN CUT MINING COSTS .......................................................................................................................... 21
UNDERGROUND MINING.......................................................................................................................................... 22
ii
KOONGIE PARK COPPER ZINC PROJECT_
7
9
CUT OFF GRADE .......................................................................................................................................... 23
6.2.2
STOPE OPTIMIZATION ................................................................................................................................ 23
6.2.3
MINE DESIGN .............................................................................................................................................. 25
6.2.4
PRODUCTION RATE..................................................................................................................................... 27
6.2.5
UNDERGROUND SCHEDULE........................................................................................................................ 28
METALLURGICAL TESTWORK.................................................................................. 29
7.1
HISTORICAL TESTWORK ............................................................................................................................................ 29
7.2
TESTWORK PROGRAMS ............................................................................................................................................ 29
7.3
8
6.2.1
7.2.1
STAGE 1 BENCHSCALE TESTWORK PROGRAM............................................................................................ 29
7.2.2
ADDITIONAL BENCHSCALE TESTWORK PROGRAM ..................................................................................... 29
CONCLUSIONS .......................................................................................................................................................... 30
MINERALS PROCESSING ......................................................................................... 31
8.1
GENERAL ................................................................................................................................................................... 31
8.2
DESIGN CRITERIA ...................................................................................................................................................... 31
8.3
PROCESS DESCRIPTION ............................................................................................................................................. 32
8.3.1
COMMINUTION .......................................................................................................................................... 33
8.3.2
FLOTATION ................................................................................................................................................. 33
8.3.3
PRODUCT HANDLING.................................................................................................................................. 34
8.3.4
REAGENTS ................................................................................................................................................... 34
8.3.5
TAILINGS DISPOSAL AND WASTE HANDLING ............................................................................................. 35
INFRASTRUCTURE AND LOGISTICS ......................................................................... 37
9.1
SITE LAYOUT ............................................................................................................................................................. 37
9.2
POWER SUPPLY ......................................................................................................................................................... 38
9.3
WATER SUPPLY ......................................................................................................................................................... 38
9.4
WATER TREATMENT ................................................................................................................................................. 38
9.5
ROADS ....................................................................................................................................................................... 38
9.6
SUPPLY CHAIN AND PRODUCT TRANSPORT ............................................................................................................. 39
9.7
NON-PROCESS BUILDINGS AND FACILITIES .............................................................................................................. 39
9.8
CAMP ACCOMMODATION ........................................................................................................................................ 39
9.9
TAILINGS ................................................................................................................................................................... 40
9.10
COMMUNICATION SYSTEMS .................................................................................................................................... 40
10 ENVIRONMENT, SOCIAL, COMMUNITY AND PERMITTING...................................... 41
10.1
EPA AND DAWE ASSESSMENT .................................................................................................................................. 41
10.2
KEY ENVIROMENTAL FACTORS ................................................................................................................................. 41
10.3
STAKEHOLDERS ......................................................................................................................................................... 42
10.4
NATIVE TITLE AND ABORIGINAL HERITAGE .............................................................................................................. 43
iii
KOONGIE PARK COPPER ZINC PROJECT_
11 IMPLEMENTATION ................................................................................................. 44
11.1
INTRODUCTION ........................................................................................................................................................ 44
11.2
KEY OBJECTIVES ........................................................................................................................................................ 44
11.3
DEVELOPMENT STRATEGY ........................................................................................................................................ 44
11.4
PROJECT IMPLEMENTATION SCHEDULE ................................................................................................................... 45
11.5
PROJECT DELIVERY STRUCTURE AND CONTRACTING STRATEGY ............................................................................. 46
11.6
OPERATIONAL READINESS ........................................................................................................................................ 48
11.6.1
RESPONSIBILITY .......................................................................................................................................... 48
11.6.2
OVERVIEW .................................................................................................................................................. 48
11.7
ASSET REGISTER ........................................................................................................................................................ 49
11.8
ORGANISATION CHART ............................................................................................................................................. 50
12 CAPITAL COST ESTIMATE ....................................................................................... 51
12.1
ESTIMATE
Share your feedback
Discover