17 August 2026
First Tundulu Diamond Hole Intersects Carbonatites to End of
Hole (510m)
Highlights
• Excellent progress continues at Tundulu, with diamond drilling advancing strongly.
• First diamond hole depth significantly extended to 510.62m after geological logging
identified multiple extended carbonatite intersections beyond the initially planned 300m
depth.
• In addition to the multiple carbonatite intrusions intersected well beyond the primary Nathace
Hill target area (as previously reported), the first Tundulu diamond drill hole has confirmed
extensive carbonatite lithology to depths approaching 510.6m – establishing confidence
that the overall geological model is now much broader and deeper than first anticipated.
• End-of-hole logging indicates the carbonatite geology remains open at depth. With other deep
diamond drillholes planned, the current drilling program remains focused on maximising
geological data around Nathace Hill to support a potential maiden Mineral Resource Estimate
later this year.
• Seven export permit approvals have now been secured for samples from prior Tundulu RC
drilling. Newly approved samples are either at Intertek’s Zambia preparation facility or
currently in transit.
• The first two batches of Tundulu RC drilling samples, comprising 1,270 total samples, are now
at the Intertek laboratory in Perth, with every effort being made for assay completion and
reporting.
AuKing’s Managing Director Paul Williams said: “AuKing’s exploration team continues to make
excellent progress now that diamond drilling has commenced at Tundulu. Importantly, the
observations from the initially-planned 300m first hole compelled the drilling to continue well beyond
that depth, to 510m. Carbonatite geology has been confirmed throughout this now much deeper
hole.”
“We also share investors’ frustrations with the delays in assay reporting of the early Tundulu drilling.
Every effort has been taken to expedite the process of export permitting, transportation from Malawi
to Zambia, sample preparation and then export to the lab in Perth. We still believe that AuKing’s
logistics process has been undertaken much quicker than has generally been the experience of
other companies in the region. With the samples now in the Intertek facility in Perth, we can expect a
timely turnaround of the much-anticipated first assay results.”
Page 2 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to provide a further
progress report on its drilling activities at the Tundulu Rare Earth Project in southern Malawi, having
now commenced the large diamond drilling phase of the program.
Commencement of Diamond Drilling at Tundulu
On 31 July 2026 AuKing confirmed that it had completed the reverse circulation (RC) component of
the initial Tundulu drilling program, having drilled 4,300m across 31 holes. Detailed geological
logging of all these RC drillholes has been completed, confirming widespread carbonatite
lithologies throughout the current drilling area. Of particular interest is the interpretation of
carbonatite material in drillholes situated well away from the primary Nathace Hill target area,
which has been the focus of previous exploration.
Figure 1 – Tundulu Project, highlighting the location of the main target area for drilling at Nathace
Hill with nearby Kamilala Hill to the north and Tundulu Hill to the east
Diamond drilling commenced at Tundulu at drill hole 26NH032, a hole that had already been RC
drilled to 150m. The plan for this hole was to drill a diamond tail for a further 150m taking the total
hole depth to 300m. However, due to the ongoing logging of carbonatite intrusions as drilling
continued, the decision was taken to extend drilling beyond the initial 300m target. Drill hole
26NH032 was eventually completed at 510.6m depth having identified extensive carbonatite
geology throughout the extended drill hole. The logging at end of hole does not suggest the
carbonatite geology has ended (Figure 3). There was no need to drill the hole any deeper at this
stage of the diamond drilling program – there are other deeper holes planned and the focus
Page 3 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
remains gathering as much data as possible around Nathace Hill to hopefully proceed with a
maiden mineral resource estimate later in the year.
The widespread occurrence of carbonatite intersected to date not just around Nathace Hill but at
targets several hundreds of metres away initially strengthened the Company’s interpretation of a
district-scale carbonatite intrusive complex at the Tundulu Project. However, the extension of
carbonatite geology to substantial depths indicates the complex may be significantly larger than
previously interpreted and provides important geological information for the planned maiden
Tundulu Mineral Resource estimate.
Figure 2 – Tundulu Project drillhole update for 26NH032. The red trace shows the approximate
downhole trajectory.
Figure 3 - Diamond drill core from approximately 505.2–510.6m downhole in 26NH032, showing
variably altered carbonatite and carbonatite breccias continuing to the end of hole.
Page 4 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 4 - Carbonatite drill core from approximately 449m downhole in 26NH032, showing
textural variation and locally developed red-orange mineral/alteration phases. Mineral
identification remains subject to detailed logging and analytical confirmation.
Cautionary Statement – Visual Observations
Visual observations and geological interpretations of drill core referred to in this announcement
are based on preliminary geologically logging. Such observations should not be considered a proxy
or substitute for laboratory analysis, which is required to determine the presence and grade of any
rare earth element mineralisation. Assay results are currently pending and will be reported when
received.
Progress with Drill Sample Assays
AuKing’s exploration team has now secured seven Malawi export approvals for the samples
generated from RC drilling (comprising a total 4,165 samples), with one export permit (comprising
357 samples) still being processed by the MMRA expected later in the week. The seven approved
batches are now either in Intertek’s Zambia sample preparation facility or in transit there.
The first two batches of samples (comprising a total 1,270 samples) derived from the initial drilling
at Tundulu are at Intertek’s Perth laboratory being assayed. AuKing has requested the samples
from the initial four drillholes be processed as a matter of priority to enable timely reporting of the
results by AuKing as soon as they are received.
Based upon these overall sample numbers, together with the substantial volume of diamond drill
core now being generated for subsequent sampling and analysis, a substantial amount of assay
data and geological information will become available to the Company over the coming weeks.
Dependingon the results from those assays, AuKingintends to commence preparationofa maiden
resource estimate from Tundulu aimed at release before the end of the year. Further reports on
that activity will be made as the assays results are reported.
By Authority of the Board
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
Page 5 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Competent Persons’ Statement
The information in this report that relates to the initial observed results from drilling at the Tundulu
Rare Earths Project is based on information reviewed by Mr Ian Hodkinson who is a member of the
Australian Institute of Geoscientists. Mr Hodkinson is a consultant to AuKing Mining Limited and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Hodkinson consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
ANNEXURE A
Tundulu drillhole location details
HOLE TYPE EAST NORTH RL TOTAL
DEPTH
AZIMUTH DIP
26NH032 RC + DDH 801423.4 8280349 679.3 510.6 225 -55
[Note – references to + DDH in the “TYPE” column indicate diamond drilling tails at the
base of the RC-drilled hole]
Page 6 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
JORC Code, 2012Edition – “First Tundulu Diamond Hole Intersects Carbonatites to
End of Hole (510m)”
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as
where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Reverse Circulation (RC) drilling was
completed using a face-sampling hammer.
• All RC drillholes were sampled on continuous 1
m intervals irrespective of lithological
boundaries.
• Sample material was collected from the
cyclone into green mining bags before being
processed using a manual three-tier riffle
splitter to obtain representative calico
samples. Where wet or clay-rich conditions
prevented representative riffle splitting, a
documented spear sampling protocol was
used.
• Geological logging was completed on every
metre using representative RC chips retained
from each interval.
• Sampling procedures were undertaken in
accordance with Company Technical Work
Guideline TWG001.
• The massive nature of the mineralised host unit
is amenable to an industry standard RC
sampling methodology being applied.
• No diamond core assay results are reported in
this announcement. Diamond core sampling
has commenced.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Reverse Circulation drilling utilised a face-
sampling hammer with compressed air.
• Drillholes were completed at the planned
orientations using surveyed collar locations
and downhole surveys where appropriate.
• Representative drill chips were collected at 1 m
intervals for geological logging and sampling.
• Diamond drilling is currently being undertaken
by Thompson Drilling in Malawi using NQ-
diameter diamond core drilling.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• The bulk weight of each 1 m RC sample was
recorded prior to sample splitting, providing a
quantitative record of sample recovery and
enabling identification of intervals with
anomalously low sample return.
• Bulk sample weights were recorded as a quality
control measure to monitor sample return.
Generally, the range of those weights were 35-
40kgs.
• Diamond core recovery is measured for each
drill run by comparing the measured length of
core recovered with the drilled length of the
corresponding core run and is recorded as a
percentage. Core recovery is verified by the site
geologist and recorded in the drillhole logging
database. Core loss and cavities, where
present, are identified and recorded using
appropriately marked core blocks.
• Core recovery is monitored during drilling.
Where poor recovery is encountered, the drilling
contractor and site geologist assess drilling
Page 7 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
conditions and appropriate measures may be
implemented, including adjustment of drill run
lengths and drilling fluid parameters.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• Representative RC chip trays were prepared and
geologically logged in full at 1 m intervals for all
drillholes.
• Logging included lithology, weathering,
alteration, mineralisation, veining, carbonate
content, magnetic response, grain size, colour
and other relevant geological observations.
• Logging was mostly qualitative in nature and
completed to a level of detail considered
appropriate to support geological interpretation
and future Mineral Resource estimation.
• Geological observations were recorded
independently of any assay information in
accordance with Company logging procedures.
• Diamond core is geologically and geotechnically
logged and photographed. Logging includes
lithology, alteration, mineralisation, veining,
structure and other relevant geological
observations.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whethersample sizesare appropriate tothe grain
size of the material being sampled.
• Representative primary samples were obtained
using a manual three-tier riffle splitter.
• Wet or clay-rich samples unsuitable for riffle
splitting were collected using a documented
multi-pass spear sampling methodology.
• Approximately 2–4 kg of sample was collected
into pre-numbered calico bags.
• Remaining reject material was retained in
labelled plastic bulker bags.
• Sample preparation procedures were designed
to minimise sample bias and maintain
representative sampling throughout the drilling
program.
• Diamond core has not yet been sampled for
assay. Following completion of geological and
geotechnical logging and photography,
selected intervals will be marked for sampling
and recorded on a cut sheet. Core selected for
assay will be cut longitudinally using a diamond
core saw, with half-core to be submitted for
analysis and the remaining half retained in
labelled core trays. Sampling is planned on
nominal 1 m intervals, with individual samples
ranging from 0.5 m to 1.5 m to honour
geological and mineralisation boundaries.
Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
• No assay data is reported.
Page 8 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Geological logging was completed using
standardised electronic logging templates.
• All geological observations were recorded prior
to receipt of analytical results.
• Logging and sampling procedures were
undertaken by Company geologists following
documented Company procedures.
• Sample submissions, QAQC insertion and
laboratory dispatch were recorded using
Company sample management systems.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drillhole collar locations were determined
using a handheld GPS.
• Grid system is in WGS 84 UTM Zone 36 South
• Elevations were determined from previously
reported LiDAR drone survey.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drillhole spacing is irregular and dependant on
the target areas.
• It is considered that the spacing of samples
used is sufficient for the current stage of
exploration.
• No drill sample compositing has occurred.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
• Drillholes were oriented to test the interpreted
geometry of the Tundulu carbonatite intrusive
complex based on historical drilling, geological
mapping and airborne magnetic data.
• Step-out drillholes were designed to test
interpreted extensions of the carbonatite
system beyond historically drilled areas.
• The true orientation of individual carbonatite
phases has not yet been established; reported
intercepts are downhole lengths and true
widths are currently unknown.
• No orientation-related sampling bias has been
identified.
Sample
security
• The measures taken to ensure sample security. • Samples remained under Company
supervision from collection through logging and
preparation.
• Calico samples were sealed within labelled
polyweave bags for transport in company truck
to warehouse facilities.
• Sample batches were documented using
Company sample submission registers prior to
dispatch to the preparation and analytical
laboratories.
• Remaining RC reject material was retained
onsite in labelled green mining bags where
appropriate.
• Diamond core remains under Company
supervision during transport from the drill site
to the Company's Zomba core processing and
storage facility, where logging, photography,
cutting and sampling are undertaken.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• Sampling and logging procedures were
undertaken in accordance with Company
Technical Work Guideline TWG001.
• Internal reviews of geological logging, sampling
procedures and QAQC protocols are
undertaken throughout the drilling program.
Page 9 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• AuKing’s Tundulu REE project is located in
southeastern Malawi, approximately 90 km
east of Blantyre.
• The Tundulu Project lies within Exploration
Licence No. EL0731/24 which was granted on
27 May 2024.
• EL0731/24 covers an area of approximately
91.5 square kilometres.
• The Licence is currently 100% held in the name
of Malawian registered Green Exploration Ltd, a
subsidiary of Tusker Minerals Limited and, as
set out in the above release, is the subject of a
transfer approval with the Malawi MMRA.
• There are no known third-party interests
affecting the Licence.
• There are no known impediments to operating
in the project area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Drill hole
information
• A summary of all information material to the
under-standing of the explorationresultsincluding
a tabulation of the following information for all
Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Data have not been aggregated.
Relationship
between
mineralisation
widths and
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• Reported intersections are downhole lengths.
The true widths of any mineralised intervals are
not yet known.
Page 10 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
intercept
lengths
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• All relevant data is reported within the body of
this announcement.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• All relevant data is reported within the body of
this announcement.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
- size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• All relevant data is reported within the body of
this announcement.
Further work • The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large- scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Selective drill program to test the lateral
extents, vertical depths, widths, and
continuation of known mineralization and test
new targets under post-mineralization
sedimentary cover identified from the
outcomes of this survey.
Share your feedback
Discover