Half Yearly Report and Accounts
Released
Released
Announcement PDF
Page 1 of 31
ASX: AKN | ABN: 29 070 859 522
For the period ended
30 June 2026
Interim Financial
Report
AuKing Mining Limited
Interim Financial Report – June 2026
Page 2 of 31
DIRECTORS' REPORT
Your Directors present their report on the Consolidated Entity consisting of AuKing Mining Limited (“AKN” or
“Company”) and the entities it controlled (together referred to as the “Consolidated Entity” or “Group”) at the end of, or
during, the half-year ended 30 June 2026.
DIRECTORS
The following persons were directors of AuKing Mining Limited during the whole of the period and up to the date of this
report, unless otherwise stated:
Name Position Period of Directorship
Mr Peter Tighe Non-Executive Chairman Appointed 9 June 2021
Mr Paul Williams Managing Director Appointed 3 June 2024
Mr Lincoln Ho Non-Executive Director Appointed 14 April 2025
REVIEW OF OPERATIONS
For the half-year ended 30 June 2026 the Consolidated Entity incurred a loss of $14,113,588 (30 June 2025: loss of
$1,597,049).
Tundulu Rare Earths Project, Malawi
On 17 April 2026, AuKing announced the acquisition of the Tundulu Rare Earths Project in south-eastern Malawi.
Tundulu is a district-scale intrusive carbonatite complex ranking among the largest and most under-explored rare earth
systems in the country.
Tundulu is an established carbonatite-hosted rare earths system supported by historical high-grade drilling results. A
total of 24 historical drill holes completed across the project area ended in mineralisation, including eight drill holes
that ended in greater than 2% TREO.
Drilling at Nathace Hill has confirmed carbonatite geology and represents one of five topographic highs across the
Tundulu Project. The remaining targets at Makhanga Hill, Namuka Hill, Ichigwakalu Hill and Tundulu Hill are considered
highly prospective for additional carbonatite-hosted mineralisation.
The consideration for the acquisition comprised:
• $1,000,000 cash;
• 83,333,333 fully paid ordinary AKN shares;
• $1,100,000 cash payment to TSK within 6 months of completion;
• $1,100,000 payable within 12 months of completion;
• $1,000,000 in performance shares, subject to milestone-based consideration. A total of 57,142,857
performance shares convertible into fully paid ordinary shares upon the reporting of a JORC-compliant Mineral
Resource of at least 25Mt at 1.25% TREO at the Tundulu Project. The performance shares shall be satisfied by
AKN issuing that number of ordinary shares at the 90- day VWAP as at the date of satisfaction of the Performance
Hurdle subject to a maximum of 1 ordinary share for each performance share.
Completion of the Proposed Acquisition is subject to approval for the transfer of the Tundulu licence to AKN’s subsidiary
Tundulu Rare Earths Limited by the Mining and Minerals Regulatory Authority (MMRA) in accordance with the Malawi
Mines and Minerals Act 2023.
The performance shares shall be satisfied by AKN issuing that number of ordinary shares at the 90-day VWAP as at the
date of satisfaction of the Performance Hurdle subject to a maximum of 1 ordinary share for each performance share.
In other words, each performance share will convert based on the formula $0.0175 / (90-day VWAP) subject to a
maximum conversion rate of 1 ordinary share for each performance share.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 3 of 31
Airborne Survey
In early June 2026, AuKing announced completion of its initial airborne (drone-based) magnetics and LiDAR survey
across a significant area of the Tundulu project area. This marked the first on-site activity since announcement of the
proposed acquisition and represents a key preparatory step ahead of the planned drilling program at Tundulu. The
airborne survey was completed using high-resolution UAV-based magnetic and LiDAR systems flown at 50 metre line
spacing and approximately 35 metre terrain clearance, the survey provides the first modern airborne geophysical
dataset completed across the Tundulu Project area.
The survey demonstrated that historical drilling has tested only a limited portion of the broader Tundulu intrusive
complex, with significant portions of the interpreted system extending beneath shallow, post-mineral, sedimentary
cover that has seen little to no historical exploration.
TunduluLicenceTransferApprovalProcess
Auking’s legal advisors in Malawi have indicated that all documentation relating to the proposed transfer of the Tundulu
exploration licence (EL 0731/24) to TREL has been finalised and lodged with the Malawi MMRA in accordance with the
Malawi Mines and Minerals Act 2023 and remains under review. While the Company continues to work closely with all
relevant stakeholders, the timing of any approval remains at the discretion of the MMRA and Ministry.
New Project Earn-in Agreed
In addition, on 5 June 2026, AuKing advised that it had entered into an earn-in agreement with Tusker Minerals Limited
(ASX:TSK) (and its Malawi subsidiary, Green Exploration Limited), providing an alternative pathway for AuKing to acquire
100% of the Tundulu exploration licence and a contractual authorisation for AuKing to carry out exploration activities on
the licence pending final transfer approvals from the MMRA. The earn-in payments mirror the completion obligations of
AuKing under the sale agreement as detailed in ASX release dated 17 April 2026. The earn-in structure has been
implemented to facilitate continued exploration activities while the MMRA transfer process remains ongoing.
Tundulu Drilling Commenced
On 9 June 2026, AuKing announced the commencement of its maiden drilling program at Tundulu.
Well-known southern African drilling contractor, Thompson Resources was engaged to undertake a planned 15,000m
program of combined reverse circulation (RC) and diamond drilling at Tundulu across approximately 50 drill hole
targets. To date the Company has completed more than 4,300m of RC drilling and the Thompson Resources diamond
rig has been mobilised to site for the next phase of the drilling program. The first diamond drillhole was extended well
beyond the planned 300m depth to around 510m, with AuKing reporting evidence of carbonatite material being
intersected all the way to the end of hole.
The drilling program has been designed to test extensions, structural controls, and depth continuity of rare earth
element (REE) mineralisation across the Tundulu Project. The program followed completion of the Company’s airborne
magnetics and LiDAR survey, which confirmed that historical drilling has tested only a limited portion of a much larger
carbonatite intrusive complex andidentifiedmultiple new drill-ready targets. RC pre-collaranddiamondtail holes(~300
m) have been designed to optimally intersect interpreted structures, complemented by a deep diamond hole (~500 m)
to test the vertical extent and core architecture of the system. Assay results from the drilling program are expected to
start being released by the Company from late August 2026.
Tasmania Tin and Silver Project
On 29 January 2026, AuKing entered into an agreement with Goldtrace Exploration Pty Ltd to acquire a 100% interest in
the EL 22/2025 and EL 23/2025 exploration licence applications in north-western Tasmania, strategically located near
the world class Renison Bell tin mine.
The licence application area covers approximately 203km² and has been the subject of historical mining activity and
limited exploration using modern methods, highlighting strong district-scale exploration potential.
As consideration for the acquisition, AuKing issued 142,857,143 AKN shares to the existing Goldtrace shareholders and
their nominees. Completion of the acquisition occurred shortly after shareholder approval was obtained at the
Company’s Extraordinary General Meeting held on 10 March 2026.
AuKing intends to design and implement a detailed exploration program during the course of the year following the grant
of the exploration licences by Mineral Resources Tasmania.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 4 of 31
Tanzanian Projects
Mkuju Uranium
No exploration activities were undertaken at the Mkuju Project during the first six months of 2026, reflecting the normal
wet season period in southern Tanzania. Initial planning and preparation have commenced for a further detailed
exploration program at Mkuju later in the year, with details to be announced once finalised.
Manyoni Uranium
On 17 March 2026, the Company announced completion of an agreement with Moab Minerals Limited (ASX: MOM),
under which AuKing transferred certain non-core prospecting licences to a Tanzanian subsidiary of Moab in
consideration for the issue by MOM 62,500,000 MOM shares to AuKing, subject to shareholder approval being obtained
by MOM.
Koongie Park Copper/Zinc (Western Australia)
No activities were undertaken by the Company at Koongie Park in north-eastern Western Australia during the first six
months of 2026, as Cobalt Blue Holdings Limited (ASX:COB) continues to sole-fund project activities pursuant to the
joint venture announced on 18 February 2025.
Canada – Myoff Creek
No activities were conducted at the Myoff Creek project during the first six months of 2026. Discussions are underway
regarding the possible disposal of the Myoff Creek claims, as these interests are no longer consistent with the
Company’s strategic objectives.
Canada – Grand Codroy
The Company surrendered this mining claim in January 2026.
EVENTS AFTER BALANCE SHEET DATE
The following events since 30 June 2026 that impact upon the financial report are as follows:
Share Placement
On 22 July 2026, the Company completed:
• a placement to professional and sophisticated investors of 200,000,000 ordinary shares at an issue price of $0.025
per share raising $5,000,000 before costs;
• the issue of 2,311,190 AKN in lieu of road maintenance service fees at Tundulu project in Malawi; and
• the issued 35,000,000 December 2026 $0.006 options (AKNO) as part of the fee payable to the managers of the
placement.
Options Exercised
A further 34,684,710 options were exercised since 30 June 2026, raising an additional $208,108.
Green Exploration Limited Acquisition
During August 2026 the Company entered into an agreement to acquire 100% of Malawi company, Green Exploration
Limited (GEL), the 100% holder of several licence interests in Malawi, including the Machinga Heavy Rare Earths Project,
the Salambidwe Rare Earths Project and the Ngala Hill Copper/Platinum Group Project, all in southern Malawi. GEL is
also the owner of the Karonga Copper licence that is situated in northern Malawi.
Completion of the Proposed Acquisition will occur after satisfaction of the following conditions:
• Both AuKing and TSK receiving confirmation from ASX that full ASX quotation re-compliance will not be required
under Chapter 11 of the ASX Listing Rules in relation to the proposed GEL acquisition; and
• All other regulatory approvals (if any) that may relate to the Proposed Acquisition have been obtained.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 5 of 31
Consideration for the acquisition is:
Initial Consideration
• $800,000 cash;
• 40,000,000 fully paid ordinary AKN shares issued, subject to voluntary escrow for a 12-month period; and
Deferred Consideration
• $50,000 cash on or before 3 months after completion; and
• $1,250,000 cash on or before 12 months after completion.
Contingent Consideration
• 50,000,000 performance shares subject to the Machinga milestone-based consideration set out below; and
• 20,000,000 performance shares, subject to the Ngala Hill milestone-based consideration set out below.
The Machinga performance shares will convert into fully paid ordinary shares upon satisfaction of a defined
performance milestone, being the reporting of a JORC-compliant Inferred Mineral Resource of at least 10Mt at 0.65%
TREO at the Machinga Project (applying a 0.5% TREO cut-off grade) within three years from the issue of the performance
shares.
The Ngala Hill performance shares will convert into fully paid ordinary shares upon satisfaction of a defined
performance milestone (Performance Hurdle), being the announcement by AuKing of any two drill intercepts at the
Ngala Hill Project exceeding one of the following thresholds:
• 20 metres @ ≥1.5 g/t Pd+Pt+Au (3E); or
• 15 metres @ ≥2.0 g/t Pd+Pt+Au (3E); or
• 10 metres @ ≥2.5 g/t Pd+Pt+Au (3E); or
• any intercept containing ≥1.0 g/t Pd+Pt+Au together with ≥0.5% Cu over at least 20 metres,
within three years from the issue of the performance shares.
The Machinga and Ngala Hill performance shares shall be satisfied by AuKing issuing that number of ordinary shares at
the 90-day VWAP as at the date of satisfaction of the Performance Hurdle subject to a maximum of 1 ordinary share for
each performance share.
Option Underwriting Agreement
On 5 August 2026, the Company entered into an agreement with GBA Capital Pty Ltd to fully underwrite the exercise of
304,734,034 (AKNAO) options which have an exercise price of $0.03 and an expiry date of 30 April 2027. The underwriter
will receive:
• a management fee of 2% ($182,840, paid in August) of the underwritten amount;
• 10,000,000 AKNO options (issued in August 2026); and
• A cash underwriting fee of an amount equal to 4% of the total amount underwritten monies paid the Company.
The underwriting agreement includes various termination events upon the occurrence of which the underwriter may
elect to terminate the underwriting agreement, including the following:
• The S&P/ASX 200 Index as published by ASX is at any time for two consecutive business days after the date of the
underwriting agreement at a level that is 5% or more below its respective level as at market close on the date of
the underwriting agreement;
• AKN shares are, at any time after the date of the underwriting agreement and prior to the issue date, quoted on ASX
at a price which is 10% or more below the price at which the shares were quoted on ASX at the close of trading two
business days earlier;
• The price of Neodymium-Praseodymium (NdPr) oxide (or such other rare earth reference price or basket as the
underwriter reasonably nominates having regard to the Company’s principal commodity exposure), as published
by Asian Metal / Shanghai Metals Market (or any successor publisher), is at any time after the date of the
underwriting agreement and prior to the issue date at a level that is 10% or more below the level of that price as at
the date of the Underwriting Agreement;
AuKing Mining Limited
Interim Financial Report – June 2026
Page 6 of 31
• AKN Shares are suspended from official quotation on the ASX after the date of the underwriting agreement for five
consecutive trading days or more.
AUDITOR’S INDEPENDENCE DECLARATION
The auditor’s independence declaration under section 307C of the Corporations Act 2001 is set out on page 6 and forms
part of the Director’s report for the half-year ended 30 June 2025.
Signed in accordance with a resolution of the directors.
Paul Williams
Managing Director
28 August 2026
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of BDO International
Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms. Liability limited by a
scheme approved under Professional Standards Legislation.
DECLARATION OF INDEPENDENCE BY R J LIDDELL TO THE DIRECTORS OF AUKING MINING LIMITED
As lead auditor for the review of AuKing Mining Limited for the half-year ended 30 June 2026, I declare
that, to the best of my knowledge and belief, there have been:
1. No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2. No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of AuKing Mining Limited and the entities it controlled during the period.
R J Liddell
Director
BDO Audit Pty Ltd
Brisbane, 28 August 2026
Level 18, 360 Queen Street
Brisbane QLD 4000
GPO Box 457 Brisbane QLD 4001
Australia
Tel: +61 7 3237 5999
Fax: +61 7 3221 9227
www.bdo.com.au
AuKing Mining Limited
Interim Financial Report – June 2026
Auditor’s Independence Declaration under Section 307C of the Corporations Act 2001
Page 7 of 31
AuKing Mining Limited
Interim Financial Report – June 2026
Page 8 of 31
Consolidated Statement of Comprehensive Income
For the half-year ended 30 June 2026
Note 6 months ended
June 2026
6 months ended
June 2025
$ $
Interest income 1,057 -
Employment and consultancy expenses (1,926,943) (359,641)
Exploration expenditure – Tanzania 3 (83,230) (16,127)
Exploration expenditure – Canada - (554)
Exploration expenditure – Malawi 3 (5,851,772) -
Tasmania project acquisition 3 (1,714,286) -
Orion project expenditure 3 - (357,120)
Project generation expenses (317,482) -
Corporate compliance and insurance expenses (221,406) (246,343)
Administration expenses (219,193) (186,233)
Investor relation and capital market advisory expenses (1,585,373) (83,635)
Investor promotion expenses 8 (1,309,624) -
Telecom and IT expenses (44,615) (11,513)
Fair value movement on convertible notes derivative 5 (694,720) -
Fair value gain on financial assets - 8,333
Finance costs (138,462) (331,321)
Depreciation expense (7,539) (12,895)
Loss before income tax (14,113,588) (1,597,049)
Income tax expense - -
Loss for the period (14,113,588) (1,597,049)
Other comprehensive income/(loss)
Foreign currency translation differences for foreign
operations
15,407 13,171
Income tax - -
Other comprehensive income for the period, net of tax 15,407 13,171
Total comprehensive loss (14,098,181) (1,583,878)
Cents Cents
Earnings per share
Basic and diluted loss per share (0.88) (0.29)
The Consolidated Statement of Comprehensive Income should be read in conjunction with the Notes to the Consolidated Financial Statements.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 9 of 31
Consolidated Balance Sheet
As at 30 June 2026
Note
June
2026
December
2025
$ $
CURRENT ASSETS
Cash and cash equivalents 1,330,324 113,688
Trade and other receivables 48,697 23,686
Other assets 64,099 -
TOTAL CURRENT ASSETS 1,443,120 137,374
NON-CURRENT ASSETS
Other receivables 3,185 3,185
Exploration and evaluation assets 3 7,943,162 7,943,162
Plant and equipment 29,772 26,112
TOTAL NON-CURRENT ASSETS 7,976,119 7,972,459
TOTAL ASSETS 9,419,239 8,109,833
CURRENT LIABILITIES
Trade and other payables 4 572,747 555,047
Employee benefit provisions 196,313 175,508
Borrowings 5 - 900,953
Other liabilities – deferred consideration Tundulu 3 2,200,000 -
Other financial liabilities 5 - 180,954
TOTAL CURRENT LIABILITIES 2,969,060 1,812,462
TOTAL LIABILITIES 2,969,060 1,812,462
NET ASSETS 6,450,179 6,297,371
EQUITY
Share capital 6 37,316,788 27,748,923
Reserves 7 5,980,237 1,281,706
Accumulated losses (36,846,846) (22,733,258)
TOTAL EQUITY 6,450,179 6,297,371
The Consolidated Balance Sheet should be read in conjunction with the Notes to the Consolidated Financial Statements.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 10 of 31
Consolidated Statement in Changes in Equity
For the half-year ended 30 June 2026
Consolidated Entity
Share
Capital Reserves
Accumulated
Losses
Total
Equity
$ $ $ $
Balance at 1 January 2025 25,326,935 3,064,080 (22,116,739) 6,274,276
Transactions with owners in their capacity as
owners
Issue of share capital 990,000 - - 990,000
Share issue costs (46,530) - - (46,530)
Share based payments - 17,348 - 17,348
Transfer of expired options - (277,330) 277,330 -
943,470 (259,982) 277,330 960,818
Comprehensive income
Loss after income tax - - (1,597,049) (1,597,049)
Other comprehensive income - 13,171 - 13,171
- 13,171 (1,597,049) (1,583,878)
Balance at 30 June 2025 26,270,405 2,817,269 (23,436,458) 5,651,216
Balance at 1 January 2026 27,748,923 1,281,706 (22,733,258) 6,297,371
Transactions with owners in their capacity as
owners
Issue of share capital 10,437,180 - - 10,437,180
Share issue costs (1,439,909) 1,020,364 - (419,545)
Share based payments - 4,233,354 - 4,233,354
Transfer to share capital 570,594 (570,594) - -
9,567,865 4,683,124 - 14,250,989
Comprehensive income
Loss after income tax - - (14,113,588) (14,113,588)
Other comprehensive income - 15,407 - 15,407
- 15,407 (14,113,588) (14,098,181)
Balance at 30 June 2026 37,316,788 5,980,237 (36,846,846) 6,450,179
The Consolidated Statement of Changes in Equity should be read in conjunction with the Notes to the Consolidated Financial Statements.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 11 of 31
Consolidated Cash Flow Statement
For the half-year ended 30 June 2026
6 months ended
June 2026
6 months ended
June 2025
Note $ $
CASH FLOWS FROM OPERATING ACTIVITIES
Payments to suppliers and employees (1,774,697) (885,061)
Payments for Orion project expenditure - (119,600)
Payments for exploration & evaluation – Tanzania (83,230) (16,127)
Payments for exploration & evaluation – Malawi (1,466,858) -
Payments for exploration & evaluation – Canada - (554)
Finance costs (24,696) (85,429)
Interest received 1,057 -
Net cash used in operating activities (3,348,424) (1,106,771)
CASH FLOWS FROM INVESTING ACTIVITIES
Proceeds/(payments) - plant and equipment (11,200) -
Payments for exploration & evaluation assets – Koongie Park - (35,383)
Net cash provided used in investing activities (11,200) (35,383)
CASH FLOWS FROM FINANCING ACTIVITIES
Proceeds from issue of shares 6 5,663,367 834,004
Cost associated with the issue of shares 6 (432,450) (5,219)
Share application funds (options not yet converted) 3,900 -
Proceeds from loans 5 - 351,200
Repayment of loans 5 (662,615) (35,728)
Net cash provided by financing activities 4,572,202 1,144,257
Net increase in cash and cash equivalents 1,212,578 2,103
Cash and cash equivalents at the beginning of the period 113,688 33,864
Net foreign exchange differences 4,058 322
Cash and cash equivalents at the end of the period 1,330,324 36,289
The Consolidated Cash Flow Statement should be read in conjunction with the Notes to the Consolidated Financial Statements.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 12 of 31
NOTE 1 SUMMARY OF MATERIAL ACCOUNTING POLICIES
(a) Reporting Entity
AuKing Mining Limited (the “Company”) is a company domiciled in Australia. The consolidated interim financial report
of the Company as at and for the six months ended 30 June 2026 comprises the Company and its controlled entities
(together referred to as the “Consolidated Entity”).
(b) Statement of Compliance
The consolidated interim financial report is a general purpose financial report which has been prepared in accordance
with AASB 134 Interim Financial Reporting and the Corporations Act 2001. The Company is a for-profit entity for the
purpose of preparing the interim financial report. The consolidated interim financial report does not include all of the
information required for a full annual financial report, and should be read in conjunction with the consolidated annual
financial report of the Consolidated Entity as at and for the year ended 31 December 2025 and any public
announcements made by the Company during the interim reporting period in accordance with the continuous
disclosure requirements of the Corporations Act 2001.
New and revised standards have been issued by the AASB and are effective for the half-year; however there are no
material changes to the policies that affect the recognition or measurement of the results or financial position of the
Consolidated Entity.
(c) Accounting Policies
The accounting policies and methods of computation applied by the Consolidated Entity in the consolidated interim
financial report are the same as those applied by the Consolidated Entity in its consolidated financial report as at and
for the year ended 31 December 2025.
(d) New Standards and Interpretations Not Yet Adopted
Certain new accounting standards and interpretations have been published that are not mandatory for 30 June 2026
reporting period. The Consolidated Entity has decided against early adoption of these standards. Other than AASB 18
Presentation and Disclosure in Financial Statements for which the Consolidated Entity is assessing the impact, the
Consolidated Entity has assessed the impact of these new standards that are not yet effective and determined that they
are not expected to have a material impact on the Consolidated Entity in the current or future reporting periods and on
foreseeable future transactions.
(e) Going Concern
As at 30 June 2026 the Consolidated Entity had cash reserves of $1,330,324 and net current liabilities of
$1,525,940. For the half-year ended 30 June 2026 the Consolidated Entity incurred a loss of $14,113,588. The
Consolidated Entity also incurred operating cash outflows of $3,348,434 and had investing cash outflows of $11,200.
The Consolidated Entity’s ability to continue as a going concern is dependent upon one or more of the following:
• the ability of the Consolidated Entity to raise sufficient additional capital in the future;
• the successful exploration and subsequent exploitation of the Consolidated Entity’s tenements.
These conditions give rise to a material uncertainty that may cast significant doubt about the Consolidated Entity’s
ability to continue as a going concern.
The going concern basis of accounting remains appropriate due to the following factors:
• Subsequent to half-year end the Consolidated Entity raised an additional $5,208,108 through a share placement
raising $5,000,000 and $208,108 received from the exercise of options; and
• The directors believe there is sufficient cash available for the Consolidated Entity to continue operating based
on the cash flow forecast.
Should the Consolidated Entity be unable to continue as a going concern, it may be required to realise its assets and
extinguish its liabilities other than in the ordinary course of business, and at amounts that differ from those stated in the
financial statements. This financial report does not include any adjustments relating to the recoverability and
classification of recorded asset amounts or the amounts or classification of liabilities and appropriate disclosures that
may be necessary should the Consolidated Entity be unable to continue as a going concern.
AuKing Mining Limited
Interim Financial Report – June 2026
Page 13 of 31
NOTE 2 SEGMENT REPORTING
Reportable Segments
The Consolidated Entity has identified its operating segment based on internal reports that are reviewed and used by
the executive teamin assessingperformance anddeterminingthe allocation of resources.The ConsolidatedEntity does
not yet have any products or services from which it derives an income. Management currently identifies the
Consolidated Entity as having three reportable segments, being:
• Exploration for minerals in Australia at the Koongie Park project;
• Exploration for minerals in Malawi; and
• Exploration for minerals in Tanzania.
The following is an analysis of the Consolidated Entity’s results by reportable operating segment for the period.
Tanzania Malawi Australia Unallocated Consolidated
Half-Year Ended 30 June 2026 $ $ $ $ $
Interest Income - - - 1,057 1,057
Expenses:
Malawi project expenditure - (5,851,772) - - (5,851,772)
Tasmania project acquisition costs - - (1,714,286) - (1,714,286)
Tanzania exploration expenses (83,230) - - - (83,230)
Net finance costs - - - (138,462) (138,462)
Other operating expenses (30,507) - (1,931) (5,599,737) (5,632,175)
(13,418,868)
Fair value loss on financial liabilities - - - (694,720) (694,720)
Segment result (113,737) (5,851,772) (1,716,217) (6,431,862) (14,113,588)
Income tax - - - - -
Net Loss (14,113,588)
Assets:
Segment assets 76,886 - 7,948,747 1,393,606 9,419,239
Liabilities:
Segment liabilities 28,114 2,579,726 25,000 336,220 2,969,060
AuKing Mining Limited
Interim Financial Report – June 2026
Page 14 of 31
NOTE 2 SEGMENT REPORTING (continued)
Tanzania Canada Australia Unallocated Consolidated
Half-Year Ended 30 June 2025 $ $ $ $ $
Expenses:
Orion project expenditure - - (357,120) - (357,120)
Canada exploration expenses - (554) - (554)
Tanzania exploration expenses (16,127) - - (16,127)
Finance costs - - - (331,321) (331,321)
Other operating expenses (98,878) - (90,977) (710,405) (900,260)
(1,605,382)
Fair value gain on financial assets - - - 8,333 8,333
Segment result (115,005) (554) (448,097) (1,033,393) (1,597,049)
Income tax - - - - -
Net Loss (1,597,049)
Tanzania Canada Australia Unallocated Consolidated
Year Ended 31 December 2025 $ $ $ $ $
Assets:
Segment assets 3,025 - 7,943,162 163,646 8,109,833
Liabilities:
Segment liabilities 101,853 - 25,166 1,685,443 1,812,462
June
2026
December
2025
$ $
NOTE 3 EXPLORATION AND EVALUATION ASSETS
Koongie Park Project
Amounts recognised in the Consolidated Balance Sheet
Opening balance 7,943,162 8,042,128
Exploration expenditure during the period - 37,145
Transfer of interest – Cobalt Blue Holdings - (136,111)
7,943,162 7,943,162
During the prior year, AKN entered into an earn in agreement with Cobalt Blue Holdings Limited (COB) for the Koongie
Park project. The key terms under the agreement are:
Stage 1
• COB will acquire a 51% beneficial interest in the Project by issuing AKN with 2,777,778 COB shares which will be
subject to escrow for a period of six months from the date of the Agreement.
• To retain the 51% beneficial interest COB must meet a minimum expenditure of A$500,000 by 30 June 2027
Stage 2
COB will then have the right (but not the obligation) to earn up to a 75% interest (an additional 24%) in the Project by
incurring an additional A$1.5 million of expenditure on the tenements by 30 June 2028.
• Should AKN’s interest dilute below 10% the interest shall revert to a 1% Net Smelter Royalty (‘NSR’).
AuKing Mining Limited
Interim Financial Report – June 2026
Page 15 of 31
NOTE 3 EXPLORATION AND EVALUATION ASSETS (continued)
Accounting Polic