Tundulu Drilling Unlocks Compelling Carbonatite Extensions
Released
Released
Announcement PDF
AUKING MINING LIMITED ABN 29 070 859 522
Suite 34, Level 10, 320 Adelaide Street, Brisbane Queensland 4000
P 07 3535 1208 W www.aukingmining.com
ASX:AKN
Page 1 of 10
ASX ANNOUNCEMENT
2 July 2026
Tundulu Drilling Unlocks Compelling Carbonatite Extensions
Highlights
• Excellent progress being made at Tundulu, with more than 3000m of reverse circulation (RC)
drilling already completed across 21 holes of the planned 10,000m combined RC/diamond
drilling program.
• Geological logging has confirmed carbonatite intersections in 20 of the first 21 RC drillholes
completed, with the nature and extent of any rare earth mineralisation to be determined by
laboratory assays.
• Multiple RC drillholes concluded in carbonatite lithologies at end-of-hole, indicating the
intrusive system extends beyond the current depth of RC drilling and supporting the planned
diamond drilling program.
• Of special interest is the intersection of carbonatite intrusions at the untested Kamilala Hill
target, located approximately500mnorthofNathace Hill, providingearlygeologicalverification
of the recent airborne magnetic survey interpretation.
• The diamond drilling rig is scheduled to mobilise to site in the third week of July to test targets
from surface and extend selected RC drillholes to further define the continuity and geometry of
the carbonatite system.
• Export permits for the RC drilling samples are being finalised, with sample preparation and
dispatch to Intertek Laboratories Perth to commence shortly for comprehensive assay. First
assay results are expected in late July.
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to provide an update
on its drilling activities at the Tundulu Rare Earth Project in southern Malawi, after having made
excellent progress at this early stage of the program.
AuKing’s Managing Director Paul Williams said: “AuKing’s exploration team has made an excellent
start to the proposed 10,000m drilling program at Tundulu, with more than 3,000m of drilling already
completed across 21 holes and with the deeper diamond drilling scheduled to commence later in
July.”
“One of the striking features from the early drilling at Tundulu is the interpreted carbonatite
intersections across almost all of the drill holes to date, and not just those holes in and around
Nathace Hill (the subject of significant historical drilling), but also areas to the west and north-east of
that main area. Of course, we await the assay results from this drilling before drawing any formal
conclusions, but Tundulu clearly has the potential to be a much larger system than what was first
thought.”
Page 2 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Geological Logging of Initial Drillholes
Detailed geological logging of the first 21 RC drillholes has been completed, confirming
widespread carbonatite lithologies throughout the current drilling area. The first two holes drilled
(26NH004 and 26NH005) were deliberately located adjacent to historical drillholes to validate
historical geological interpretations for future resource studies and establish internal lithological
markers for ongoing logging, as no historical RC chips or drill core have been retained by previous
explorers. Geological logging of these validation holes identified multiple oxidised ferruginous
carbonatite intervals displaying abundant dark carbonate-rich fragments and pervasive iron
oxide/goethite alteration, interlayered with highly magnetic mafic dolerite. The observed
lithologies are consistent with those recorded in the corresponding historical drillholes, with mafic
dolerite intersections occurring within only a few metres of previously reported depths, providing
increasedconfidence inthe geologicalcontinuityof the principalintrusive units. Laboratory assays
are pending.
Of particular interest is the interpretation of carbonatite material in drillholes situated well away
from the primary Nathace Hill target area, which has been the focus of previous exploration. As
illustrated in Figure 2 below, these step-out drillholes were specifically designed to test targets
generated from the recent airborne magnetic survey. Carbonatite lithologies were intersected in
each of these drillholes, providing geological support for the Company's exploration model.
Figure 1 – Tundulu Project, highlighting the location of the main target area for drilling at Nathace
Hill with nearby Kamilala Hill to the north
Page 3 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Geological logging indicates that carbonatite has been intersected in 20 of the first 21 RC drillholes
completed (95%), with cumulative logged carbonatite exceeding 1,500 m across the program.
Seven drillholes contain more than 100 m of logged carbonatite, demonstrating the continuity and
substantial scale of the intrusive complex beyond the historically drilled Nathace Hill area. These
observations will be integrated with laboratory assay results to refine the geological model and
optimise the planned diamond drilling program.
RC Drilling at Tundulu
AuKing has completed 2,693m of RC drilling in and around the primary target area of Nathace Hill
over 19 holes, to a maximum depth of 150m. An additional 298m of RC drilling over 2 holes has
been completed at the Kamilala Hill target area. Thompson Resources, the drilling contractor,
expects to mobilise the diamond rig to the Tundulu project site around the third week of July –
thereby providing sufficient time to complete the intended RC drilling component of the program
before the new rig arrives. A further seven RC holes comprising approximately 1,050m of drilling
are planned, bringing the RC component of the program to approximately 4,040m across 28
drillholes.
Figure 2 – Tundulu Project drillhole collar locations and drillhole traces for AKN completed and
planned RC – DDH drilling program with historic drillhole collar locations depicted in yellow.
Page 4 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
The diamond drilling component of the program will comprise a combination of holes drilled from
surface and diamond tails extending selected RC drillholes, with final hole selection based on
geological logging, geophysical targets and laboratory assay results as they become available.
Figure 2 above illustrates the location and direction of each of the completed RC drillholes and the
table in Annexure A provides further particulars of those holes. Planned RC drillholes are also
illustrated with historical drillhole collar locations.
The widespread occurrence of carbonatite intersected during the current drilling program supports
the Company's geological interpretation of an extensive carbonatite intrusive complex. Geological
logging and laboratory assay results from the current drilling program will be integrated with
historical drilling data and recent airborne magnetic survey interpretations to refine the geological
model and guide subsequent diamond drilling.
Tundulu Licence Transfer
On 5 June 2026, Auking advised that all documentation relating to the proposed transfer of the
Tundulu exploration licence (EL 0731/24) to AuKing’s Malawi subsidiary (Tundulu Rare Earths
Limited) had been finalised and lodged with the Malawi Mining and Minerals Regulatory Authority
(MMRA) in accordance with the Malawi Mines and Minerals Act 2023 and remains under review. A
new Minister for Mining, The Honourable Mr Thoko Tembo MP, has been appointed and the
Company continues to work closely with Ministry Officials.
Also, as previously advised, AuKing continues with its exploration activities at Tundulu pursuant to
an earn-in agreement with Tusker Minerals Limited (ASX:TSK) (and its Malawi subsidiary, Green
Exploration Limited). This agreement provides an alternative pathway for AuKing to acquire 100%
of the Tundulu exploration licence and a contractual authorisation for AuKing to carry out
exploration activities on the licence pending final transfer approvals from the MMRA.
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
Competent Persons’ Statement
The information in this report that relates to airborne survey results at the Tundulu Rare Earths
Project is based on information reviewed by Mr Ian Hodkinson who is a member of the Australian
Institute ofGeoscientists. MrHodkinsonis aconsultantto AuKingMiningLimited andhas sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which they are undertaking to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr Hodkinson consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Page 5 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
ANNEXURE A
Tundulu drillhole location details
HOLE TYPE EAST NORTH RL TOTAL
DEPTH
AZIMUTH DIP
26NH001 RC + DDH 800847.4 8280005 707.7 150 61 -55
26NH002 RC + DDH 800759.4 8280064 693.9 150 80 -65
26NH003 RC + DDH 800791.8 8280156 690.6 148 100 -65
26NH004 RC + DDH 801109.6 8279899 763.4 146 15 -55
26NH005 RC + DDH 801065.8 8279881 747.1 150 15 -60
26NH006 RC + DDH 801232.2 8280253 732.6 150 220 -55
26NH007 RC + DDH 800893.2 8280262 693.9 87 110 -65
26NH008 RC + DDH 800860.4 8279776 713.4 120 45 -55
26NH009 RC + DDH 800769.9 8279920 699 150 60 -65
26NH011 RC 800759.7 8280067 693.8 150 270 -55
26NH012 RC 800801.4 8280209 687.9 129 310 -55
26KH013 RC 801527 8280916 667.3 150 35 -65
26NH014 RC 800867.9 8279929 714.4 150 220 -70
26NH023 RC + DDH 801376 8280303 690.1 150 220 -55
26NH027 RC 801012.5 8280259 714.2 129 180 -55
26KH028 RC 801476.2 8281135 658.4 148 180 -65
26NH029 RC 801111.1 8279858 743.9 150 10 -55
26NH030 RC 800770 8279919 699.2 148 250 -75
26NH031 RC 800889.2 8280262 693.9 135 360 -55
26NH032 RC + DDH 801423.4 8280349 679.3 150 225 -55
26NH033 RC 801286.1 8280237 736.1 150 210 -55
[Note – references to DDH in the “TYPE” column indicate planned diamond drilling tails at
the base of the RC-drilled hole]
Page 6 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
JORC Code, 2012Edition – “Tundulu Drilling Unlocks Compelling Carbonatite
Extensions”
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as
where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Reverse Circulation (RC) drilling was
completed using a face-sampling hammer.
• All drillholes were sampled on continuous 1 m
intervals irrespective of lithological
boundaries.
• Sample material was collected from the
cyclone into green mining bags before being
processed using a manual three-tier riffle
splitter to obtain representative calico
samples. Where wet or clay-rich conditions
prevented representative riffle splitting, a
documented spear sampling protocol was
used.
• Geological logging was completed on every
metre using representative RC chips retained
from each interval.
• Sampling procedures were undertaken in
accordance with Company Technical Work
Guideline TWG001.
• The massive nature of the mineralised host unit
is amenable to an industry standard RC
sampling methodology being applied.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Reverse Circulation drilling utilised a face-
sampling hammer with compressed air.
• Drillholes were completed at the planned
orientations using surveyed collar locations
and downhole surveys where appropriate.
• Representative drill chips were collected at 1 m
intervals for geological logging and sampling.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• The bulk weight of each 1 m RC sample was
recorded prior to sample splitting, providing a
quantitative record of sample recovery and
enabling identification of intervals with
anomalously low sample return.
• Bulk sample weights were recorded as a quality
control measure to monitor sample return.
Generally, the range of those weights were 35-
40kgs.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• Representative RC chip trays were prepared and
geologically logged in full at 1 m intervals for all
drillholes.
• Logging included lithology, weathering,
alteration, mineralisation, veining, carbonate
content, magnetic response, grain size, colour
and other relevant geological observations.
• Logging was mostly qualitative in nature and
completed to a level of detail considered
appropriate to support geological interpretation
and future Mineral Resource estimation.
• Geological observations were recorded
independently of any assay information in
accordance with Company logging procedures.
Page 7 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whethersample sizesare appropriate tothe grain
size of the material being sampled.
• Representative primary samples were obtained
using a manual three-tier riffle splitter.
• Wet or clay-rich samples unsuitable for riffle
splitting were collected using a documented
multi-pass spear sampling methodology.
• Approximately 2–4 kg of sample was collected
into pre-numbered calico bags.
• Remaining reject material was retained in
labelled plastic bulker bags.
• Sample preparation procedures were designed
to minimise sample bias and maintain
representative sampling throughout the drilling
program.
Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
• No assay data is reported.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Geological logging was completed using
standardised electronic logging templates.
• All geological observations were recorded prior
to receipt of analytical results.
• Logging and sampling procedures were
undertaken by Company geologists following
documented Company procedures.
• Sample submissions, QAQC insertion and
laboratory dispatch were recorded using
Company sample management systems.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drillhole collar locations were determined
using a handheld GPS.
• Grid system is in WGS 84 UTM Zone 36 South
• Elevations were determined from previously
reported LiDAR drone survey.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drillhole spacing is irregular and dependant on
the target areas.
• It is considered that the spacing of samples
used is sufficient for the current stage of
exploration.
• No drill sample compositing has occurred.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
• Drillholes were oriented to test the interpreted
geometry of the Tundulu carbonatite intrusive
complex based on historical drilling, geological
mapping and airborne magnetic data.
• Step-out drillholes were designed to test
interpreted extensions of the carbonatite
system beyond historically drilled areas.
Page 8 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
this should be assessed and reported if material. • The true orientation of individual carbonatite
phases has not yet been established; reported
intercepts are downhole lengths and true
widths are currently unknown.
• No orientation-related sampling bias has been
identified.
Sample
security
• The measures taken to ensure sample security. • Samples remained under Company
supervision from collection through logging and
preparation.
• Calico samples were sealed within labelled
polyweave bags for transport in company truck
to warehouse facilities.
• Sample batches were documented using
Company sample submission registers prior to
dispatch to the preparation and analytical
laboratories.
• Remaining RC reject material was retained
onsite in labelled green mining bags where
appropriate.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• Sampling and logging procedures were
undertaken in accordance with Company
Technical Work Guideline TWG001.
• Internal reviews of geological logging, sampling
procedures and QAQC protocols are
undertaken throughout the drilling program.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• AuKing’s Tundulu REE project is located in
southeastern Malawi, approximately 90 km
east of Blantyre.
• The Tundulu Project lies within Exploration
Licence No. EL0731/24 which was granted on
27 May 2024.
• EL0731/24 covers an area of approximately
91.5 square kilometres.
• The Licence is currently 100% held in the name
of Malawian registered Green Exploration Ltd, a
subsidiary of Tusker Minerals Limited and, as
set out in the above release, is the subject of a
transfer approval with the Malawi MMRA.
• There are no known third-party interests
affecting the Licence.
• There are no known impediments to operating
in the project area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Drill hole
information
• A summary of all information material to the
under-standing of the explorationresultsincluding
a tabulation of the following information for all
Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Page 9 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Data have not been aggregated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
• Reported intersections are downhole lengths.
The true widths of any mineralised intervals are
not yet known.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• All relevant data is reported within the body of
this announcement.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• All relevant data is reported within the body of
this announcement.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
- size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• All relevant data is reported within the body of
this announcement.
Further work • The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large- scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Selective drill program to test the lateral
extents, vertical depths, widths, and
continuation of known mineralization and test
new targets under post-mineralization
sedimentary cover identified from the
outcomes of this survey.