COB: Halls Creek Project Review Targets Major Uplift
Released
Released
Announcement PDF
Market
Update
Highlights
4 August 2025
Cobalt Blue Holdings Limited
ASX Code:
COB
Halls Creek Project Review
Targets Major Uplift
KEY POINTS
Directors & Management:
Robert Biancardi
Non-Exec Chairman
Joe Kaderavek
Deputy Chairman
Hugh Keller
Non-Exec Director
Dr Andrew Tong Chief Executive Officer
Kelvin Bramley
CFO & Company
Secretary
Cobalt Blue Holdings Limited (ASX: COB) (‘Cobalt Blue’ or ‘the Company’) is
pleased to provide an update on upside potential identified following a review of
value engineering opportunities and historical exploration data across the Halls
Creek Project (‘Halls Creek Project’ or the ‘Project’) tenement package.
Engineering Review Targets Margin Expansion
Multiple value engineering opportunities are being progressed to build on the
strong economics delivered in the June 2025 Scoping Study (the ‘Scoping
Study’):
Silver recovery presents a substantial opportunity to boost Stage 1
margins.
Cobalt at Sandiego occurs with high-grade copper-zinc zones—inclusion
of cobalt in future Mineral Resource estimates could provide a valuable byproduct credit, enhancing Stage 2 cost competitiveness.
A centralised processing hub is under review to integrate satellite
deposits into the development plan aiming to extend life-of-mine, increase
throughput, and lower unit capital intensity.
Sandiego North Emerges as a High-Impact Discovery Target
Defined by a 700 m copper-in-soil anomaly with multiple samples
exceeding 200 ppm Cu.
Drill hole ASWB01 intersected 5 m at 1.37% Cu and 2m at 1.71% Cu,
confirming copper mineralisation north of the existing resource.
Deep drilling at Sandiego shows mineralisation trending toward Sandiego
North, with high-grade results remaining open along strike.
Represents a priority target for near-term resource growth.
Broader tenement package under systematic review, targeting multideposit development potential.
Cobalt Blue Holdings Limited
ACN:
Address:
Ph:
Website:
Email:
Social:
614 466 607
Suite 12.01, Level 12, 213 Miller Street
North Sydney NSW 2060
(02) 8287 0660
www.cobaltblueholdings.com
info@cobaltblueholdings.com
Cobalt.Blue.Energy
cobalt-blue-holdings
Commenting on the future upside of the Halls Creek Project, Cobalt Blue's
CEO Dr Andrew Tong said "The upside opportunities presented in this
release, offer immense value-add to the core project outlined in the recent
Scoping Study. COB has the right team to unlock silver and cobalt credits,
potential driving major uplifts in cashflow and return on installed plant.
Resource growth, and associated project life could be realised through the
drill-ready exploration opportunities.”
1
Engineering Review Targets Major Uplift
Engineering Review Targets Margin Expansion - Multiple value engineering opportunities are being progressed to build
on the strong economics delivered in the June 2025 Scoping Study.
New Revenue Streams: Silver and Cobalt Upside Identified – The potential inclusion of silver at Onedin and cobalt at
Sandiego offer high-value revenue streams and align with Kwinana battery metals strategy.
Strategic Hub Concept to Expand Project Scale - Centralised hub model under review to integrate nearby deposits,
extend mine life, and boost production scale.
Exploration Pipeline Activated – Sandiego North confirmed as a high-impact near-mine target; regional pipeline also
advancing to drive long-term discovery.
The Company has identified multiple value engineering initiatives that have the potential to significantly enhance the already
robust economics outlined in the Halls Creek Project Scoping Study (see 'Halls Creek Project Scoping Study delivers a
near-term copper-zinc opportunity' released 6 June 2025), the Project is structured to deliver staged, near-term cash flow
from two sequential operations:
Stage 1 – Onedin Open Pit / Heap Leach:
A two-phase open-pit operation supplying oxide and transitional feed to a heap leach facility, producing copper metal
and zinc sulphate monohydrate through solvent extraction, electrowinning, and crystallisation.
Stage 2 – Sandiego Underground / Flotation Concentrator:
An underground mine targeting transitional and primary sulphide mineralisation, commencing after Stage 1. The
operation will utilise long-hole open stoping with cemented rock fill to maximise ore recovery and will produce separate
copper and zinc concentrates with silver credits via flotation.
The Scoping Study demonstrated strong base-case economics, with a Stage 1 C1 cash cost1 of US$1.33/lb of copper
and a Stage 2 C1 cash cost1 of US$1.11/lb of copper, both measured against a long-term copper price assumption of
US$4.55/lb. Importantly, these already robust margins exclude several upside opportunities that could significantly increase
project value outlined below.
Figure 1 - Stage 1 - Onedin and Stage 2 - Sandiego cash cost US/lb copper (net of zinc credits).
Onedin C1 Cu (net Zn byproducts) US$/lb
4.50
Sandiego C1 Cu (net Zn byproducts) US$/lb
4.50
0.24
4.00
0.00
1
1.00
0.50
Zn Credit
Royalties
1.60
-2.00
1.11
C1
0.50
2.00
1.50
1.33
1.16
2.50
Processing
1.00
1.69
-2.81
C1
1.50
0.35
3.00
Mining
2.00
3.50
US$/lb
Processing
2.50
Mining
US$/lb
3.00
Zn Credit
3.50
Royalties
4.00
2.20
0.00
Net of zinc credits.
2
Silver Recovery in Stage 1 – A High-Grade, Untapped Credit
Future metallurgical testwork for Stage 1 will target the recovery of silver from Onedin mineralisation. Shallow, high-grade
silver intersections include:
55.1 m at 3.5% Cu, 1.2% Pb, 0.8% Zn & 103 g/t Ag from 94 m (AORD004), including
16.6 m at 10.2% Cu, 0.5% Pb, 1.0% Zn & 316 g/t Ag from 130 m
118 m at 1.1% Cu, 1.6% Pb, 1.1% Zn & 52 g/t Ag from 14 m (AOWB03), including
21 m at 2.1% Cu & 66 g/t Ag from 93 m
Silver is currently excluded from the Stage 1 financial model, despite the production target delivering material at an average
grade of 37 g/t (1.2 oz/t) equating to 3.6 Moz contained silver. With silver trading at ~A$58/oz, any potential recovery could
deliver substantial additional revenue and, when considered alongside the current Stage 1 processing cost of A$52.12/t,
significantly lift project margins.
Cobalt Upside in Stage 2 – Strategic Fit with Kwinana Cobalt Refinery
The inclusion of cobalt in future Mineral Resource estimates at Sandiego presents a compelling upside for Stage 2. This
directly supports the proposed Kwinana Cobalt Refinery strategy, targeting battery-grade cobalt and nickel products —
potentailly adding a high-value, future-facing revenue stream to the Project.
Historical drilling demonstrates that cobalt occurs alongside high-grade copper-zinc mineralisation at Sandiego, with notable
intersections summarised in the table below.
Downhole
Interval
(m)
From (m)
Cu (%)
Zn (%)
Co (%)
Ag (g/t)
SRC060
8
112
2.0
4.2
0.28
133
SRC062
18
128
0.7
5.7
0.10
62
SRCD028A
37
267
3.9
0.3
0.10
28
SRCD030
12.4
208
4.8
12.1
0.13
129
and
18
274
7.3
0.3
0.14
42
Drill Hole
SRCD031
22
100
12.6
8.0
0.17
121
and
12.9
149.5
12.2
2.8
0.27
37
SRCD064
10.37
393.73
9.9
0.3
0.46
19
Incorporating cobalt into future Mineral Resource updates and feasibility studies has the potential to deliver a meaningful
by-product credit. This would further strengthen the already competitive cost profile of Stage 2 and broaden the Project’s
exposure to battery metals markets.
Opportunity for a Centralised Processing Hub to Exploit Satellite Deposits
Beyond the immediate development of the Onedin and Sandiego deposits, the Company has identified a strategic
opportunity to establish a centralised processing hub capable of accepting material from nearby satellite deposits. This
approach has the potential to maximise capital efficiency, extend the life-of-mine (LOM), and increase the overall scale of
operations without significant duplication of processing infrastructure.
Priority satellite deposits that could be considered for future integration include:
Mount Angelo North1: 1.72 Mt at 1.4% Cu, 1.4% Zn, 12.3 g/t Ag containing approximately 23 kt Cu, 25 kt Zn and 680 koz Ag.
Bommie Porphyry Copper1: 95.6 Mt at 0.27% Cu containing approximately 262 kt Cu.
Incorporating material from these deposits into a centralised operation presents an opportunity to incrementally increase
throughput and extend the Project’s LOM beyond the 10 years currently modelled in the Scoping Study. By leveraging
existing processing infrastructure, the Project could achieve higher metal production at a lower unit capital intensity,
enhancing overall project economics.
1
Owned by Cazaly Resources Limited (ASX: CAZ).
3
Figure 2 - Halls Creek Project regional deposits and prospects.
4
Targeting Growth Beyond Onedin and Sandiego
Following the successful Scoping Study in H1 2025, the Company has pivoted to a focused review of historical exploration
data across the broader Halls Creek tenement package. This work is driving the identification of new, high-potential targets
to be advanced alongside feasibility studies — supporting a dual-track strategy of project optimisation and resource growth.
An initial suite of priority targets has been defined, ranging from immediate extensions of Onedin and Sandiego to regional
prospects with the potential to deliver step-change scale.
Sandiego North Target
The most advanced of these targets is Sandiego North which remains open along strike to the north, presenting a
substantial opportunity for further resource growth. Extending beyond the known mineralisation, the Sandiego North target
represents a highly prospective but largely untested area defined by extensive surficial copper geochemical anomalism and
a significant intersection encountered during the drilling of a water bore (ASWB01).
In 2023, AuKing Mining Limited completed a detailed soil sampling program at Sandiego North to evaluate potential
continuity of mineralisation from the main Sandiego deposit. The survey, comprising 294 samples collected on a 50 m x 20
m grid, delineated a broad 700-metre northeast–southwest copper anomaly extending from the northern limits of Sandiego
through to ASWB01. Within this trend lies a prominent 150 m x 100 m geochemical zone, with several samples exceeding
200 ppm Cu, which remains completely untested by drilling. The soil sampling results provide a compelling vector for copper
mineralisation linking the main Sandiego system with Sandiego North.
Drill hole ASWB001, located more than 700 m north of the current Sandiego resource boundary, returned multiple intervals
of high-grade copper mineralisation including:
5 m at 1.4% Cu from 50 m (ASWB01), and
2 m at 1.7% Cu from 85 m.
Figure 3 - Sandiego - Sandiego North plan illustrating geochemical anomalism and drilling intersections.
5
Enhancing the significance of this target, several drill holes north of the deposit have variably tested the continuity of
mineralised lenses, which are interpreted to be dislocated by northwest–southeast trending faults. Several zones remain
open along strike to the north, including discrete shallow lenses and deeper extensions, with significant intersections
summarised in the table below.
Drill Hole
Downhole Interval (m)
From (m)
Cu (%)
SRC065
12
121
1.3
SRC18
3
103
3.3
SRC20
11
53
2.5
ASRD004
11
395
3.0
ASRD005
13.1
455
2.5
SRCD078
12.25
543.35
1.7
Figure 4 - Sandiego - Sandiego North long section illustrating significant cobalt and copper intersections. The
underground development design prepared for the Scoping Study is shown with areas of potential extension
identified.
These intersections confirm the continuity of high-grade copper mineralisation and highlight the significant untested
potential of the Sandiego North corridor. With the underground mine optimisation completed as part of the Scoping Study
demonstrating viable access to the area, the delineation of resources at Sandiego North is a priority opportunity for nearterm resource growth and has the potential to materially enhance the scale of the Halls Creek Project.
6
Building the Pipeline – Regional Targets
While Sandiego North stands out as the near-term resource growth opportunity, the Company is actively building a broader
pipeline of exploration targets across the Halls Creek tenement package. This strategy is underpinned by an integrated
review of geophysics, historical drilling, geochemistry, and mapping — laying the groundwork for sustained discovery
beyond the known deposits.
Examination of regional geophysical data reveals that both the Sandiego and Onedin deposits are associated with distinct
magnetic anomalies, attributed to magnetite alteration. These anomalies typically exhibit short strike lengths and are oriented
across stratigraphic trends, creating a signature that can be traced elsewhere within the Project area. Both deposits also lie
in proximity to induced polarisation (IP) and electromagnetic (EM) conductors, despite deep weathering profiles—indicating
that these geophysical methods remain effective tools for regional targeting.
A number of similar magnetic and EM anomalies have been identified along prospective stratigraphy, and these are being
evaluated in conjunction with:
surface mapping of gossans,
surficial geochemical anomalies, and
historical drilling data, which is being reviewed to assess the extent and effectiveness of past exploration efforts.
This regional targeting work is designed to systematically refine and prioritise targets for follow-up exploration, ensuring
a continuous pipeline of opportunities to complement near-mine development. These activities will inform future drill
campaigns and support the Company’s strategy to position the Halls Creek Project as a long-life, multi-deposit copper-zinc
operation.
Competent Person’s Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Heath Porteous,
a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Porteous is
employed by Xploremore Pty Ltd and engaged on a full-time basis by the Group as Exploration Manager. Mr Porteous has
had sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for the
Reporting of Exploration Results, Minerals Resources and Ore Reserves (2012 JORC Code). Mr Porteous consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
Cobalt Blue Background
Cobalt Blue is a minerals processing and mining company positioned for growth and cashflow:
Our growth strategy is focused on producing copper, zinc and silver that power Australia’s economy and support global
industrial growth, from the Halls Creek Project.
Our critical minerals strategy focuses on building mid-stream processing capabilities in Australia and diversifying supply
chains among like-minded countries. These include the Kwinana Cobalt Refinery and Broken Hill Technology Centre.
As announced on 18 February 2025, the Company intends to seek shareholder approval to change its name to Core Blue
Minerals Limited.
7
Compliance Statements
The information in this announcement related to the Sandiego and Onedin Mineral Resource estimates is extracted from
the ASX Announcement released on 18 February 2025 titled ‘COB Diversifies – Major Copper Project Earn in’. The
Company confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcement and, in the case of Mineral Resources, all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
The information in this announcement related to the Halls Creek Project, including the forecast financial information, is
extracted from the ASX Announcement released on 6 June 2025 titled ‘Halls Creek Project Scoping Study delivers a nearterm copper-zinc opportunity’. The Company confirms that it is not aware of any new information or data that materially
affects the production target information or the forecast financial information derived therefrom included in the original
announcement. The Company confirms that all the material assumptions underpinning those production targets or the
forecast financial information derived therefrom continue to apply and have not materially changed.
Forward Looking Statements
This announcement contains “forward-looking statements”. All statements other than those of historical facts included in
this announcement are forward-looking statements. Where the Company expresses or implies an expectation or belief as
to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis.
However, forward-looking statements are subject to risks, uncertainties, and other factors, which could cause actual results
to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks
include but are not limited to cobalt metal price volatility, timely completion of project milestones, funding availability, and
government and other third-party approvals. The Company is not obligated to release any revisions to any “forward-looking
statement” publicly. To the maximum extent permitted by law, COB and its respective advisers, affiliates, related bodies
corporate, directors, officers, partners and employees expressly exclude and disclaim all responsibility and liability, including,
without limitation, for negligence or in respect of any expenses, losses, damages or costs incurred by any person as a result
of their reliance on this ASX announcement and the information in this ASX announcement being inaccurate or incomplete in
any way for any reason, whether by way of negligence or otherwise.
This announcement was authorised for release to the ASX by the board of Cobalt Blue Holdings Limited.
For more information, please contact:
Joel Crane
Investor Relations/Commercial Manager
joel.crane@cobaltblueholdings.com
Scan the QR code to download a copy
of the Halls Creek Scoping Study.
8
JORC Code 2012 Edition — Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Sampling
techniques
Nature and quality of sampling (e.g.,
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes,
or handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’
work has been done this would
be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(e.g., submarine nodules) may warrant
disclosure of detailed information.
Commentary
Sandiego – Diamond Drilling
1995–1996
Diamond drilling was used to obtain core from which intervals
averaging 1 m in length were sawn to produce samples
(typically quarter (25%) core). These samples were crushed,
split and pulverised for analysis via atomic absorption
spectroscopy (‘AAS’) reporting a limited and variable
suite of elements (nominally Cu, Pb, Zn and Ag). Au was
variably analysed by fire assay. Details of sub-sampling, lab
preparation and digestion techniques are not recorded.
2006–2011
Diamond drilling was used to obtain core from which intervals
averaging 1 m in length were sawn to produce quarter
(25%) core or half (50%) core samples from HQ or NQ
core respectively. These samples were crushed, split and
pulverised to produce a sample for mixed-acid digestion and
analysis via Inductively Coupled Plasma – Mass Spectrometry
(‘ICP-MS’) or Inductively Coupled Plasma – Optical Emission
Spectroscopy (‘ICP-OES’) reporting a variable suite of
elements. Au was typically analysed by fire assay using a 40
- 50g charge with an AAS finish. Details of sub-sampling and
lab preparation techniques are not recorded.
The remaining core was retained for archival purposes.
2021
Diamond drilling was used to obtain core from which intervals
averaging 0.95 m in length were sawn to produce half (50%)
core samples. These samples were crushed passing -10 mm,
riffle split and pulverised to produce a sample for mixed-acid
digestion and analysis via ICP-OES for a suite of 39 elements.
Au was analysed by fire assay using a 30 g charge with an
AAS finish.
The remaining core was retained for archival purposes or
metallurgical testwork.
Sandiego – RC Drilling
1995–1996
RC drilling was used to obtain 1 m samples by means of
a riffle splitter which were composited into 4 m intervals
for analysis via AAS reporting a limited suite of elements
(nominally Cu, Pb, Zn and Ag). Au was variably analysed by
fire assay. Composite samples returning Cu, Pb or Zn >1%,
and or Au >1 g/t were typically re-assayed at 1 m intervals.
Details of sample compositing, sub-sampling and lab
preparation techniques are not recorded.
9
Criteria
Sampling
techniques
(continued)
JORC Code Explanation
Commentary
2006–2008
RC drilling was used to obtain 4 m composite samples by
means of a sample ‘spear’. These samples were crushed, split
and pulverised to produce a sample for mixed-acid digestion
and analysis via ICP-MS or ICP-OES reporting a variable suite
of elements. Au was typically analysed by fire assay using a
40-50 g charge with an AAS finish. Details of sub-sampling
and lab preparation techniques are not recorded.
2010–2011
RC drilling was used to obtain 1m samples by means of
a cone splitter. These samples were crushed, split and
pulverised to produce a sample for mixed-acid digestion and
analysis via ICP-OES reporting a variable suite of elements. Au
was typically analysed by fire assay using a 50 g charge with
an AAS finish. Details of sub-sampling and lab preparation
techniques are not recorded.
2021
RC drilling was used to obtain 1 m samples by means of
a cone splitter from which up to 3.5 kg was pulverised to
produce a sample for mixed-acid digestion and analysis via
ICP-OES for a suite of 39 elements. Au was analysed by fire
assay using a 30 g charge with an AAS finish.
Unmineralised zones were infrequently composited into 4m
intervals for analysis as described above.
Onedin – Diamond Drilling
1995–1996
Diamond drilling was used to obtain core from which intervals
averaging 1 m in length were sawn to produce samples
(typically quarter (25%) core). These samples were crushed,
split and pulverised for analysis via AAS reporting a limited and
variable suite of elements (nominally Cu, Pb, Zn and Ag). Au
was variably analysed by fire assay. Details of sub-sampling,
lab preparation and digestion techniques are not recorded.
2006–2008
Diamond drilling was used to obtain core from which intervals
averaging 1 m in length were sawn to produce quarter
(25%) core or half (50%) core samples from HQ or NQ
core respectively. These samples were crushed, split and
pulverised to produce a sample for mixed-acid digestion and
analysis via ICP-MS or ICP-OES reporting a variable suite of
elements. Au was typically analysed by fire assay using a 40
- 50 g charge with an AAS finish. Details of sub-sampling and
lab preparation techniques are not recorded.
The remaining core was retained for archival purposes.
2021
Diamond drilling was used to obtain core from which intervals
averaging 0.96 m in length were sawn to produce quarter
(25%) core or half (50%) core samples from PQ3 / HQ3 or HQ
core respectively. These samples were crushed passing -10
mm, riffle split and pulverised to produce a sample for mixedacid digestion and analysis via ICP-OES for a suite of 39
elements. Au was analysed by fire assay using a 30 g charge
with an AAS finish.
10
Criteria
JORC Code Explanation
Sampling
techniques
(continued)
Commentary
The remaining core was retained for archival purposes or
metallurgical testwork.
Onedin – RC Drilling
1995–1996
RC drilling was used to obtain 1m samples by means of a riffle
splitter which were composited into 4m intervals for analysis
via AAS reporting a limited suite of elements (nominally Cu, Pb,
Zn and Ag). Au was variably analysed by fire assay. Composite
samples returning Cu, Pb or Zn >1%, and or Au >1 g/t
were typically re-assayed at 1m intervals. Details of sample
compositing, sub-sampling and lab preparation techniques are
not recorded.
2006–2008
RC drilling was used to obtain 4 m composite samples by
means of a sample ‘spear’. These samples were crushed, split
and pulverised to produce a sample for mixed-acid digestion
and analysis via ICP-MS or ICP-OES reporting a variable
suite of elements. Au was analysed by fire assay using a
40–50 g charge. Details of sub-sampling and lab preparation
techniques are not recorded.
2021
RC drilling was used to obtain 1 m samples by means of
a cone splitter from which up to 3.5 kg was pulverised to
produce a sample for mixed-acid digestion and analysis via
ICP-OES for a suite of 39 elements. Au was analysed by fire
assay using a 30 g charge with an AAS finish.
Unmineralised zones were infrequently composited into 4 m
intervals for analysis as described above.
Sandiego North Soil Sampling
Drilling
techniques
Drill type (e.g., core, reverse
circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc)
and details (e.g., core diameter, triple
or standard tube, depth of diamond
tails, face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc).
Soil samples were collected from shallow depths (<20
cm from surface) using handheld equipment. Samples
were sieved in the field to pass a –2.8 mm mesh, with
approximately 250 g retained for multi-element analysis using
a microwave-assisted acid digest with an ICP-EOS/MS finish
Sandiego
The Sandiego drilling database comprises drill holes
completed from 1995 including 3 diamond drill holes, 53
RC drill holes and 42 diamond drill holes with RC pre-collars
(‘RCDD’) of varying depths. In addition, the database includes
35 drill holes (27 diamond drill holes and 8 RC drill holes) for
which no information regarding the date of drilling or details
related to drilling techniques is recorded.
Between 1995 and 1996, diamond drill holes generally utilised
RC pre-collars to an average depth of 141m. Diamond tails
were typically completed using HQ3 triple tube, reducing to
standard NQ2 on intersection of competent rock. RC drilling
utilised standard hole diameters (typically 4.75 – 5.625”)
though details of bit types were not recorded. Core orientation
was completed, where possible, using a Van-Ruth Orientation
device.
11
Criteria
JORC Code Explanation
Commentary
Drilling
techniques
(continued)
Between 2006 and 2011, diamond drill holes generally utilised
RC pre-collars to an average depth of 144 m. Diamond tails
were typically completed using standard HQ2. RC drilling
utilised standard hole diameters (typically 5.25”) though details
of bit types were not recorded. Core orientation surveys were
undertaken as frequently as possible (generally every 12
m) though were difficult to maintain in broken ground. Core
orientation methods were not recorded.
During 2021, diamond drill holes generally utilised RC precollars to an average depth of 120 m. Diamond tails were
typically completed using standard HQ2, reducing to NQ2 to
hole completion. RC drilling utilised standard hole diameters
(typically 5.5”) face-sampling bit. Core was orientated though
orientation methods were not recorded.
A summary of drill holes and drilling techniques is provided in
the following table.
No. Drill Holes
No. Metres
Drilling Diameters
Year
Diamond
RC
RCDD
Total
Diamond
RC
Total
Diamond
RC
1995
-
4
5
9
630.6
1,096.65
1,727.25
1996
-
6
8
14
1,427.6
1,928.1
3,355.7
NQ2-HQ3
4.75–5.625”
2006
-
-
4
4
912.65
520.75
1,433.4
2008
-
22
11
33
2,289.8
5,208.4
7,498.2
2010
2
11
10
23
1,220.1
3,193.9
4,414
NQ2-HQ2
5.25”
2011
-
3
-
3
-
648
648
2021
1
7
4
12
1,742.58
1,431.33
3,173.91
NQ2-HQ2
5.5”
Total
3
53
42
98
8,223.33
14,027.13
22,250.46
-
-
12
Criteria
JORC Code Explanation
Commentary
Onedin
Drilling
techniques
(continued)
The Onedin drilling database comprises drill holes completed
from 1995 including 8 diamond drill holes, 41 RC drill holes
and 21 diamond drill holes with RC pre-collars (‘RCDD’) of
varying depths. In addition, the database includes 21 diamond
drill holes for which no information regarding the date of drilling
or details related to drilling techniques is recorded.
Between 1995 and 1996, diamond drill holes generally utilised
RC pre-collars to an average depth of 154 m. Diamond tails
were typically completed using HQ3 triple tube, reducing to
standard NQ2 on intersection of competent rock. RC drilling
utilised standard hole diameters (typically 4.75 – 5.625”)
though details of bit types were not recorded. Core orientation
methods were not recorded.
Between 2006 and 2008, diamond drill holes generally utilised
RC pre-collars to an average dept
Share your feedback