AKN to Acquire High Grade Greenland Niobium Project
Released
Released
Announcement PDF
AUKING MINING LIMITED ABN 29 070 859 522
Suite 34, Level 10, 320 Adelaide Street, Brisbane Queensland 4000
P 07 3535 1208 W www.aukingmining.com
ASX:AKN
Page 1 of 26
ASX ANNOUNCEMENT
13 October 2026
Binding Term Sheet to Acquire High Grade Greenland
Niobium Project
Advanced exploration opportunity into adistrict-scale, highgrade, drilled niobium and rare
earth opportunity in strategically important WestGreenland, mineralised from surface
Highlights
• AuKing to acquire up to 75% interest in the Qeqertaasaq Project, comprising exploration licence
encompassing a substantial 3 x 5km carbonatite complex, establishing AuKing in West Greenland’s
strategically important niobium and rare earths province, with no upfront cost.
• Historical exploration has returned high-grade assay results, including surface samples of up to 11.8%
Nb2O5 (sample ID 199876)1
and 12.3% TREO (sample ID 195831)1
.
• Exceptional niobium results from historical shallow scout holes in 1975 (average depth <10m), include2
> 17636 — 15.9m @ 0.80% Nb2O5 from 3.6m
> Including — 12.69m @ 1.04% Nb2O5 from 3.6m
> 17629 — 10.4m @ 1.29% Nb2O5 from 1.9m
> 17590 — 9.04m @ 0.51% Nb2O5 from 2.65m
> 17584 — 5.22m @ 2.73% Nb2O5 from 4.15m
> 17622 — 9.67m @ 0.50% Nb2O5 from 4.78m
> Including — 5.26m @ 0.80% Nb2O5 from 6.57m
• Subsequent historical deeper drilling completed in 1976 also returned outstanding results.
Mineralisation remains open in all directions, in multiple areas. Results include2
:
> Qa-11 — 84.37m @ 0.51% Nb2O5 from 13.35m
> Including — 43.96m @ 0.81% Nb2O5 from 32.94m
> Including — 32.43m @ 1.06% Nb2O5 from 44.47m
> Qa-25 — 53.23m @ 0.51% Nb2O5 from 35m
> Including — 26.18m @ 0.83% Nb2O5 from 57.3m
> Including — 15.93m @ 1.11% Nb2O5 from 72.3m
> 17593 — 41m @ 0.75% Nb2O5 from 7.2m
> Including — 37.51m @ 0.81% Nb2O5 from 9.66m
> Including — 24.99m @ 1.05% Nb2O5 from 18.52m
1
NunaMinerals A/S announcement 25 October 2010 and Joint NunaMinerals and Korea Resources Corporation document titled “Qeqertaasaq 2014 field program and
budget dated January 2014”, page 17
2
Gothenborg, J., Keto, L. & Pedersen, J.L. (1976), Exploration of the Qaqârssuk Carbonatite Complex 1976, Kryolitselskabet Øresund A/S, Prospektering, including
Appendices 2 and 3.
Page 2 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
• Historical shallow trenching in 2010 in a separate zone conducted by NunaMinerals returned peak REE
assay value of 13.23% TREO, trenching highlights include:
> T04 — 5.14% TREO over 3.19m
(Total trench length 3.19m — mineralised for the whole interval)
> T01 — 4.18% TREO over 2.12m
(Total trench length 2.12m — mineralised for the whole interval)
> T03 — 4.16% TREO over 2.34m
(Total trench length 2.34m — mineralised for the whole interval)
Cautionary Note - The historical results presented above have not been previously reported in accordance with the JORC Code 2012, and a
Competent Person has not been provided sufficient detail to disclose the results in accordance with the Code. It is possible that following
further evaluation and/or exploration work that confidence in the results may be reduced when reported under the JORC Code 2012. The
Company confirms that nothing has come to its attention that causes it to question the accuracy or reliability of the results, but the company
has not independently validated the results and therefore is not to be regarded as reporting, adopting or endorsing those results.
• Historical exploration identified shallow, pyrochlore-bearing niobium mineralisation across
multiple areas of the Qeqertaasaq complex, with mineralisation remaining open in all directions.
• Qeqertaasaq’s shallow historical niobium grades compare favourably with those mined at
Canada’s established underground Niobec operation, responsible for approximately 7–8% of global
niobium consumption and hosts mineralised envelopes averaging 0.37-0.42% Nb₂O₅3
, highlighting the
potential for a significant near-surface niobium system to be evaluated through modern exploration
and development studies.
• Rare earth mineralisation has been identified in multiple steeply dipping veins and broader mineralised
envelopes, with the principal ‘Discovery Vein’ historically reported over more than 750 metres of strike
and at least 200 metres down dip, remaining open along strike and at depth.
• Preliminary metallurgical test work conducted by NunaMinerals A/S in conjunction with US-based
IntelliMET LLC4
in 2011 reported rapid leaching and greater than 80% TREO recovery from coarsely
crushed Qeqertaasaq REE mineralisation under relatively mild hydrochloric acid conditions at
approximately 50 degrees Celcius, without requiring fine grinding or pre-concentration.
• This strategic transaction comes amid heightened international focus on Greenland following the
recently announced agreement between the United States, Greenland and Denmark, which
expressly recognised Greenland’s critical-mineral endowment and its importance to Western security
and supply chains.
• The Project benefits from exceptional year-round logistics, remaining ice- and snow-free with no
material seasonal access constraints with 20-minute helicopter access year-round from major airports.
• The transaction structure provides AuKing with a low-entry cost, risk-managed approach into an
extensively explored critical-minerals project with no upfront cost, allowing investment to be
progressively increased as historical results are validated and the geological and development potential
is further demonstrated.
• AuKing is well funded to support the Qeqertaasaq transaction while continuing its ongoing diamond
drilling program at the Tundulu Rare Earths Project in Malawi.
3
IAMGOLD NI 43-101 Technical Report, Update on Niobec Expansion, December 2013
4
IntelliMET LLC Report 18 July 2011
Page 3 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
• AuKing will approach ASX to confirm that full ASX quotation re-compliance will not be required under
Chapter 11 of the ASX Listing Rules in relation to the proposed Qeqertaasaq transaction, and
commencement of the earn-in acquisition is conditional upon ASX providing this confirmation.
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to advise that AuKing has
entered into a binding Term Sheet to earn-in up to a 75% interest in the Qeqertaasaq niobium rare earth
project in western Greenland.
Qeqertaasaq Project Overview
The Qeqertaasaq REE-Nb project is situated in West Greenland, approximately 125 km NNE of the
Greenlandic capital, Nuuk, and 55 km east of the town of Maniitsoq (Pop ~ 2,500). A location only 18 km
from the coast at the head of the Kangia Fjord, would allow for ice-free deep-water access for the majority
of the year.
An exclusive 64 km² exploration licence (MEL 2026-41) covers the entire Qeqertaasaq phoscorite—
carbonatite complex (PhCC), and the surrounding fenitised envelope. AuKing’s earn-in rights relate to the
conduct of exploration activities on this exploration licence.
Geological Setting
The Qeqertaasaq Carbonatite Complex intruded Archean gneisses in West Greenland 173 Ma ago. It is a
complex ring dyke system with several intrusive centres and covers an area of 5 x 3 km. The first intrusive
phase comprised ultramafic olivine-titanomagnetite followed by several generations of carbonatite
magmas. The later intrusive phases were associated with intensive sodium alteration (fenitisation). During
the most advanced stage of alteration niobium, uranium, tantalum, phosphorus and rare earth elements
were precipitated.
AuKing’s Managing Director Paul Williams said “We are very pleased to have secured earn-in
rights to explore for rare earths and niobium at the Qeqertaasaq project in western Greenland over
the next few years. The recent treaty agreement signed by the US, Denmark and Greenland
governments has expressly recognised the potential significance of the Greenland critical minerals
sector.
“One of the key reasons for securing Qeqertaasaq is the significant data base of historical
exploration, including more than 10,000m of drilling since the mid-1970’s. A key early activity will
be a thorough review of all available historical exploration data, prior to formulating the next phase
of exploration activities.”
Page 4 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 1 – Location diagram of the Qeqertaasaq projectin south-western Greenland, including proximity to Sarfartoq
REE project.
Qeqertaasaq Mineralisation — Niobium, Rare Earth & Tantalum
The Qeqertaasaq deposit contains pyrochlore-bearing niobium mineralisation historically explored by KØ
in the 1970’s. Surface sampling has yielded grades up to 11.8 % Nb₂O₅, 20.6% P₂O₅ and 1.9% Zr. This
mineralisation remains open, and the potential for additional tonnage is significant. Historical
exploration identified an additional style of niobium-tantalum mineralisation at Qeqertaasaq. This style of
mineralisation has never previous been evaluated, however historical float samples corresponding to this
style of mineralisation have yielded exceptional grades up to 1% Ta₂O₅, hence represent a potential
tantalum exploration target in their own right. A number of untested radiogenic anomalies exist within the
complex, several of them associated with significant Nb and Ta soil anomalies.
The historic exploration indicates that REE mineralisation at Qeqertaasaq appears to be largely
concentrated within the south-eastern core of the complex. The mineralisation consists of steeply dipping
Page 5 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
carbo-hydrothermal REE veins dominated by ancylite-(Ce) prominently hosted within glimmerites
(intensively fenitised phlogopite-rich rocks). The REE veins have yielded up to 12.3 % TREO during surface
sampling & trenching (average grade ~ 4 % TREO).
In 2010, NunaMinerals excavated 9 trenches across two REE-bearing dykes. Trench samples averaged
2.65% TREO and returned exceptional grades up to 13.23% TREO.5
Subsequent drilling by NunaMinerals has demonstrated that the REE veins carries up to 4.5% TREO over
4.7 metres (the ‘Discovery Vein’), with strike continuity in excess of 750 metres (open in both directions),
and down dip continuity of minimum 200 metres6
. Several such veins are known to exist. The REE veins
are enveloped by a shell of lower grade mineralisation over tens of metres. The Critical Rare Earth Oxides
(CREO) of the TREO amounts to 14.5% (neodymium dominated) of the Discovery Vein based upon 4
intersects. Soil sampling in 2012 by NM indicates the presence of further concealed and untested REE and
Nb mineralisation within the immediate vicinity of the Discovery Vein.
Figure 2 – Qeqertaasaq panorama, looking west from Fosslik Hill, with approximate outline of the carbonatite
complex shown. Increased vegetation occurs in the area due to the phosphorous-rich soils, which have developed
above the carbonatite bedrock. (Note – Ma denotes million years and Ga denotes billion years)
Exploration History
The Qeqertaasaq prospect, historically referred to as Qaqarssuk, was discovered by by Kryolitselskabet
Øresund A/S (KØ”) during the systematic exploration of West Greenland. KØ was a pioneering Danish
mining and exploration company and an early adopter of modern exploration methods in Greenland. They
also maintained a close and collaborative relationship with the Geological Survey of Greenland (“GGU”),
including the sharing of geological and exploration data. Historical work includes the following:
5
‘Rare earth element exploration in licence 2007/5’1 report (2010) by Nuna Minerals
6
See NunaMinerals release “NunaMinerals and Partner Kores Complete Drilling on the Qeqertaasaq Project, West Greenland, 1
October 2014
Page 6 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
KryolitselskabetØresund (1969-1976)
• In the period 1969 – 1973, (KØ) undertook a range of ground-based surveys comprising reconnaissance
mapping, sampling and radiometric and magnetic surveys. Ten short cored holes, comprising 826.3m
(Qa 1-10) were also drilled in the period 1970 -1971 targeting radiometric anomalies.
• Further drilling was undertaken in 1973 and 1975 for Nb mineralisation, the latter on a 50m x 50m grid
and comprising 222 holes for a total length of 2299.5 m.
• In 1976, pyrochlore anomaly areas 2 and 3 were tested by deep drilling, comprising 16 cored holes (QA
11 to 26) totalling 2,658.7 m.
NunaMinerals(2007-2014)
• NunaMinerals (NM) conducted REE exploration at the Qeqertaasaq PHCC complex between 2007 and
2014, comprising geophysical surveys, surface sampling and nine trenches completed across
prospective REE-bearing carbonatite dykes, which collectively demonstrated the REE potential of the
complex’s core and identified high-grade mineralisation. Several drill targets were subsequently
defined and, in 2011, NM drilled 2,593 metres across 17 BTW sized holes (DDH-11-001 to 017),
intersecting high grade REE veins in every hole, with widths up to 6 metres.
• Under a JV with South Korean Gov. KORES, additional drilling was completed by NM in 2014 for a total
of 2,007 metres (13 holes) that extended the mineralisation.
Figure 3: Plan view of the Qeqertaasaq Project, highlighting location of reported drill holes by Kryolitselskabet
Øresund (1975-76) and NunaMinerals (2011-12), including KØ’s notable high-grade Nb2O5 intersections.
Page 7 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 4 – Qeqertaasaq assay map showing historical 2010 trench-assay results wtihin the REE trenched/target zone,
reported as average grades across the respective sampled trench lengths. Results outside the trenched/target zone
represent individual surface spot assays.
Figure 5 – Historical trench excavated in 2010 across an REE-bearing carbonatite dyke at Qeqertaasaq. The trench
measured ~2.34m long by ~0.5m wide, was oriented along an azimuth of 300°, and was located at approximately
65.38°N, 51.65°W (WGS84 datum).
Page 8 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Metallurgical Testwork
Metallurgical test work conducted by NM in conjunction with US-based IntelliMET7
in 2011, demonstrated
the REE ore from Qeqertaasaq may be relatively easy to process, with both samples leaching rapidly in
hydrochloric acid solutions.
The high-grade nature and the carbonate-dominated mineralogy allowed coarsely crushed (2-3 cm) ore to
be directly leached using mild hydrochloric acid heated to 50°C, with recoveries >80% of the TREO content.
A tentative flow sheet developed by NM involves process optimization and purification of the resultant
leachate (removal of impurities), to produce a purified mixed REE carbonate solid. Subject to continued
successful metallurgical testing and purification, further metallurgical work could include selective
extraction of the individual rare earth elements.
Figure 6 – Historical preliminary metallurgical testwork reported by NunaMinerals demonstrating TREO recoveries of up to
82% from coarsely crushed Qeqertaasaq mineralisation
Figure 7 – Conceptual Rare Earth processing flowsheet for Qeqertaasaq mineralisation, prioritising physical beneficiation to
produce an REE concentrate, with further processing subject to metallurgical testwork.
7
IntelliMET LLC Report 18 July 2011
Page 9 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 8 – Conceptual niobium processing flowsheet for Qeqertaasaq mineralisation, incorporating physical
upgrading and flotation to produce a pyrochlore-bearing niobium concentrate.
US/Denmark/Greenland Agreement
On 22 September 2026,at the UN in New York, Donald Trump, Danish PM Mette Frederiksen,and Greenland
PM Jens-Frederik Nielsen signed a treaty that amends and supplements the 1951 US–Denmark Defense of
Greenland Agreement (Treaty). Greenland is a co-signatory this time, which is new. The Treaty has no expiry
date.
Under the Treaty, the US may modernise and expand Pituffik Space Base (the only active US base today)
and establish “defense areas” at Narsarsuaq (south; old Cold War airfield) and Mestersvig (east). Further
sites, including unmanned/drone installations, can be added by mutual agreement, with accelerated
Greenlandic/Danish review. Provision is also made for broad US overflight, landing, and undersea access
in Greenland and its territorial waters, with contracts for bases to go to Greenlandic suppliers “to the
maximum extent possible.” No non-NATO state may put manned or unmanned installations, or a persistent
force, in Greenland unless the three parties agree.
The important feature of the Treaty from AuKing’s perspective is that investors from states that are not NATO
members, NATO partners, or EU members may not take control, significant influence, or sensitive
information access in “particularly sensitive sectors” (explicitly including critical infrastructure and
resource extraction) unless all three parties agree it is not a national-security threat. Greenland leads
screening with Denmark; the US now has a formal say. Relevantly, Australia is a NATO partner.
Page 10 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Transaction Structure
AuKing has entered into a staged earn-in agreement with well-known and experienced Xploration Services
Greenland A/S (unrelated to AuKing) providing for exploration at Qeqertaasaq over a maximum period of six
years. The earn-in comprises the following staged financial arrangements:
ExclusivityPayment
A non-refundable €15,000 cash payment (already paid) to secure a 30-day exclusivity period (expiring 24
October 2026), during which time AuKing aims to complete satisfactory legal and technical due diligence.
OnCommencementoftheEarn-in
There are no acquisition payments to be made upon commencement of the Earn-in. AuKing has the right
(but not obligation) to earn up to a 75% interest in the Qeqertaasaq exploration licence by sole funding
exploration funding totalling €10,000,000 over the next 6 years in three stages as follows:
• Stage 1 - €3,000,000 in exploration funding by 30 September 2028 to earn an initial 30% project interest;
• Stage 2 - €3,000,000 in exploration funding by 30 September 2030 to earn a further 21% project interest;
and
• Stage 3 - €4,000,000 in exploration funding by 30 September 2032 to the final 24% project interest.
During the conduct of exploration activities under the Earn-in Agreement, AuKing is obliged to contribute a
minimum annual expenditure towards the project activities to keep the licence in good standing – for 2027
this is roughly A$69,000 and for 2028 — $215,000.
Project activities will be overseen by a joint Management Committee with field works and related logistics
to be managed by Xploration Services Greenland A/S, with over 20 years’ experience in mineral exploration,
logistics and administration in Greenland.
At the completion of AuKing’s earn-in rights, a joint venture will be formed between the project holders and
in accordance with normal terms that would apply for such a joint venture. Also at completion of the 75%
earn-in by AuKing, an introduction fee amounting to 10% of the project equity will be allocated to unrelated
third parties who provided the introduction of the Qeqertaasaq opportunity to AuKing.
Next Steps
Several technical, environmental and regional exploration activities are recognised as suitable next steps
for Qeqertaasaq project.
• Compilation of historic data to inform the next stage drilling campaign and metallurgical test work.
• Resource Definition Drilling (approx. 3,000-5,000 m) to establish an Inferred MRE.
• Bench-scale metallurgical sampling and test work in support of the proposed MRE, including
verification of historic results and design of a suitable beneficiation flow sheet.
Page 11 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Cautionary Statement Regarding Historical Exploration Results
The historical results presented in this release have not been previously reported in accordance with the
JORC Code 2012, and a Competent Person has not been provided sufficient detail to disclose the results in
accordance with the Code. It is possible that with further evaluation and/or exploration work confidence in
the results may be reduced when reported under the JORC Code 2012. The Company confirms that nothing
has come to its attention that causes it to question the accuracy or reliability of the results, but the
Company has not independently validated the results and therefore is not to be regarded as reporting,
adopting or endorsing those results.
Note – Proximate Statements
This announcement contains references to REE Projects derived by other parties either nearby or proximate
to or in similar geological settings to the Qeqertaasaq Project, including Greenland Mines’ Sarfartoq project
that was recently acquired for US$35M.It is important to notethat suchdiscoveriesorgeologicalsimilarities
do not in any way guarantee that the Company will have any success or similar successes in delineating a
JORC compliant Mineral Resource on the Qeqertaasaq Project, if at all.
AuKing’sDiversified Exploration Portfolio
The proposed earn-in agreement is consistent with AuKing’s strategy of building a portfolio of high-quality
exploration projects focused on critical and other commodities. Upon commencement of the Qeqertaasaq
earn-in, the Company’s portfolio will include:
• Tundulu Rare Earths Project, southern Malawi (which continues to be AuKing’s primary focus);
• Machinga and Salambidwe Rare Earths Projects, southern Malawi;
• Koongie Park Copper-Zinc-Silver Project, Western Australia (49% joint venture with Cobalt Blue
Holdings Ltd);
• Mkuju Uranium Project, southern Tanzania; and
• Big Wilson Tin-Tungsten Project, north-western Tasmania.
AuKing intends to continue advancing exploration activities across its portfolio, with the 15,000m drilling
program well underway at Tundulu, while evaluating resource mineral potential across the rest of its
portfolio.
ASX Disclosure Regarding Historical Exploration Results
This ASX release contains information derived from public disclosures of former owners and explorers of
the Qeqertaasaq project area. In accordance with ASX disclosure requirements the following additional
matters need to be noted:
• The historical exploration results reported in this release were made by companies other than AuKing,
including NunaMinerals A/S(NM), which was listed on Nasdaq Copenhagen and the public Danish
company Kryolitselskabet Øresund A/S;
• Copies of the historical exploration results are available as publicly available reports including:
> Exploration history and exploration data for the Qeqertaasaq (formerly Qaqarssuk) Carbonatite
Complex, West Greenland. Prepared for Nuna Minerals A/S, Nuuk, Greenland by Mountain
Page 12 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Resources Aps, 2011.
> Qeqertaasaq Rare Earth Element – Niobium Project, REE, Niobium & Tantalum Critical-
Minerals Opportunity, South Greenland. 2026 Introductory Project Summary, C. Østergaard.
> Grice, J.D., Gault, R.A., Rowe, R. and Johnson, O. (2006) QaqarssukitE-(Ce), A New Barium–
Cerium Fluorcarbonate Mineral Species from Qaqarssuk, Greenland. The Canadian
Mineralogist (2006) 44 (5): 1137–1146. https://doi.org/10.2113/gscanmin.44.5.1137
> Knudsen, C. (1991) Petrology, geochemistry and economic geology of the Qeqertaasaq
complex, southern West Greenland. 114 pp.,78 figs and 18 tables. Monograph Series on
Mineral Deposits. Gebrüder Bornträger, Berlin - Stuttgart.
> Report on Exploration Work Conducted in 2018 on Mineral Exploration Licence 2018/21, North
American Nickel Inc., Maniitsoq Area, Southwest Greenland , Work Period from May 19 to
September 17, 2018. Report for North American Nickel by J. Sparling, P. Geo., G. Katchen,
P.Geo., S. Taylor, P.Geo., J. Pattison, P.Geo., P. Lightfoot, P.Geo., March 31, 2019
• A statement by Mr Mark Mitchell, Competent Person is set out below;
• A cautionary statement in relation to the historical exploration results included in this release is set out
above; and
• AuKing has no other reason to suspect that the historical exploration results as reported in this release
are misleading.
Approved by the Board of AuKing Mining Limited.
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
Abbreviations
• TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7,
Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3 (Pm2O3 excluded by tradition)
• Nb2O5 = Niobium pentoxide
CompetentPersons’Statement
The information in this report that relates to historical exploration results at the Qeqertaasaq Niobium and Rare Earths
Project is based on information reviewed by Mr Mark Mitchell who is a member of the Australian Institute of
Geoscientists. Mr Mitchell is an independent consultant to AuKing Mining Limited (and not an employee) and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Mitchell consents to the inclusion
in the report of the matters based on his information in the form and context in which it appears. Mr Mitchell also
confirms that the information in this report is an accurate representation of the available data and studies for the
Qeqertaasaq Project.
Page 13 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
APPENDIX A
REPORTED HISTORICAL TRENCHING RESULTS BY NunaMinerals (2010)
Page 14 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
APPENDIX B
REPORTED HISTORIC DRILL RESULTS BY Kryolitselskabet Øresund (1975)
*Note Azimuth, Dip and Drill collar locations are unavailable, however these shallow holes were utilised as indicators for drilling in 1976 (per Appendix C)
Page 15 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
APPENDIX C
REPORTED HISTORIC DRILL RESULTS BY Kryolitselskabet Øresund (1976)
Page 16 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Page 17 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
APPENDIX D
REPORTED DRILL RESULTS (2010) & RE-ASSAYS OF 1976 HISTORIC DRILLING BY NunaMinerals
Page 18 of 26
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
JORC Code, 2012 Edition – Binding Term Sheet to Acquire High Grade Niobium Project in Greenland
[Note –The contents ofthis Tablearebasedonmaterialsthat AuKing’sCompetent Personhasbeenable to
accesscomprisingthefollowingreports:
• Explorationhistory andexploration datafor the Qeqertaasaq(formerly Qaqarssuk) Carbonatite Complex,
WestGreenland.Prepared forNunaMinerals A/S,Nuuk,GreenlandbyMountainResourcesAps, 2011.
• QeqertaasaqRare Earth Element–Niobium Project,REE, Niobium& TantalumCritical-Minerals
Opportunity, SouthGreenland.2026Introductory ProjectSummarybyC.Østergaard
• Grice, J.D.,Gault,R.A.,Rowe,R.and Johnson, O.(2006)QaqarssukitE-(Ce), ANewBarium–Cerium
FluorcarbonateMineral Speciesfrom Qaqarssuk,Greenland.The CanadianMineralogist(2006) 44 (5):
1137–1146.https://doi.org/10.2113/gscanmin.44.5.1137
• Knudsen,C.(1991) Petrology,geochemistry andeconomicgeologyof the Qeqertaasaqcomplex,
southernWest Greenland. 114 pp.,78figsand 18 tables.Monograph SeriesonMineralDeposits.
GebrüderBornträger, Berlin -Stuttgart.
• ReportonExplorationWork Conducted in2018onMineralExplorationLicence2018/21,North American
NickelInc.,Maniitsoq Area, SouthwestGreenland, WorkPeriodfromMay 19 toSeptember17, 2018.
ReportforNorth American Nickelby J.Sparling, P.Geo., G.Katchen, P.Geo., S.Taylor, P.Geo., J.Pattison,
P.Geo., P.Lightfoot, P.Geo.,March31, 2019].
Section 1 Sampling Techniquesand Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• Kryolitselskabet Øresund A/S (KØ) undertook
surface and core sampling at Qaqarssuk.
Surface sampling comprised hand specimens,
powder and soil samples, with locations
principally selected from geological,
radiometric and magnetic anomalies. Powder
samples were collected at nominal 0.5 m
intervals where exposure permitted.
Historical core drilling totalled approximately
5,600 m in 246 holes between 1970 and 1976.
In some early drilling, core was surveyed by
scintillometer and intervals selected for assay
based on radioactivity; consequently, sampling
was not necessarily continuous and potential
selection bias should be recognised.
• Available historical records do not adequately
document core subsampling, sample masses,
equipment calibration, sample preparation or
QA/QC procedures; these aspects cannot
presently be verified.
• NunaMinerals A/S undertook reconnaissance
rock sampling in 2009 and similar
Share your feedback
Discover