StepOut Drilling Expands Carbonatite Footprint at Tundulu
Released
Released
Announcement PDF
AUKING MINING LIMITED ABN 29 070 859 522
Suite 34, Level 10, 320 Adelaide Street, Brisbane Queensland 4000
P 07 3535 1208 W www.aukingmining.com
ASX:AKN
Page 1 of 10
15 July 2026
ASX ANNOUNCEMENT
New Step-Out Drilling Expands Carbonatite Footprint at
Tundulu
800m east ofNathace Hill, confirming carbonatite intersections in everydrill hole across Kamilala
Hill and TunduluHill,highlightingthe continuityand scale ofthe carbonatite system
Highlights
• Excellent progress continues at Tundulu, with more than 3,850m of reverse circulation (RC)
drilling now completed across 27 holes of the proposed upsized 15,000m combined
RC/diamond drilling program, following a successful >95% carbonatite drillhole hit rate to
date.
• Ofparticularsignificance, multiple carbonatiteintrusions were intersectedonboth the western
and eastern sectors of Tundulu Hill, located ~800m east of Nathace Hill, reinforcing confidence
in the recent airborne magnetic survey interpretation and overall geological model.
• Geological logging has now confirmed carbonatite intersections in every drillhole completed
across the latest drilling at Kamilala Hill and Tundulu Hill. Drill samples are currently being
prepared for laboratory analysis to determine the nature and extent of anyassociatedrare earth
mineralisation.
• Drilling to date has now delineated extensive carbonatite geology across Nathace Hill, Kamilala
Hill and Tundulu Hill, demonstrating a large-scale carbonatite presence across three of the
six interpreted carbonatite complexes within the broader Tundulu Project area,
significantly enhancing confidence in the Project’s district-scale potential.
• With the remaining complexes at Makhanga Hill, Namuka Hill and Chigwakwalu Hill yet to be
drill-tested for rare earth mineralization, the overall scale potential of the Tundulu system
remains highly compelling.
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to provide a further
update on its drilling activities at the Tundulu Rare Earth Project in southern Malawi, after having
made excellent progress at this stage of the program.
Page 2 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Geological Logging of Initial Drillholes
Detailed geological logging of the first 27 RC drillholes has been completed, confirming
widespread carbonatite lithologies throughout the current drilling area. AuKing recently reported
that initial drillholes were deliberately located adjacent to historical drillholes to validate historical
geological interpretations for future resource studies and establish internal lithological markers
for ongoing logging, as no historical RC chips or drill core have been retained by previous explorers.
Geological logging of these validation holes identified multiple oxidised ferruginous carbonatite
intervals displaying abundant dark carbonate-rich fragments and pervasive iron oxide/goethite
alteration, interlayered withhighly magnetic mafic dolerite. The observed lithologies are consistent
with those recorded in the corresponding historical drillholes, with mafic dolerite intersections
occurring within only a few metres of previously reported depths, providing increased confidence
in the geological continuity of the principal intrusive units. Laboratory assays are pending.
What continues to be of particular interest is the interpretation of carbonatite material in drillholes
situated well away from the primary Nathace Hill target area, which has been the focus of previous
exploration. As illustrated in Figure 2 below, these step-out drillholes around Kamilala Hill and
more recently the surrounding sectors of Tundulu Hill, were specifically designed to test targets
generated from the recent airborne magnetic survey. Carbonatite lithologies were intersected in
each of these drillholes, providing geological support for the Company's exploration model.
Geological logging to date indicates that carbonatite has been intersected in 26 of the first 27 RC
drillholes completed (96%), with cumulative logged carbonatite exceeding 2,000 m across the
program. Nine drillholes contain more than 100m of logged carbonatite, demonstrating the
continuity and substantial scale of the intrusive complex potentially well beyond the historically
drilled Nathace Hill area. These observations will be integrated with laboratory assay results to
refine the geological model and optimise the planned diamond drilling program.
AuKing’s Managing Director Paul Williams said: “AuKing’s exploration team continues to make
excellent progress with the proposed 10,000m drilling program at Tundulu, having now completed
more than 3,850m of drilling across 27 holes and with the deeper diamond drilling scheduled to
commence later in July.”
“We reported recently that one of the striking features from the early drilling at Tundulu is the
interpreted carbonatite intersections across almost all of the drill holes to date, and not just those
holes in and around Nathace Hill (the subject of significant historical drilling), but also areas to the
west and north-east of that main area. This interpreted carbonatite continues over to the east of
Tundulu Hill, all of which significantly increases the potential carbonatite footprint beyond our initial
expectations. Of course, we await the assay results from this drilling before drawing any formal
conclusions, but Tundulu clearly has the potential to be a much larger system than was first thought.”
Page 3 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 1 – Tundulu Project, highlighting the location of the main target area for drilling at Nathace
Hill with nearby Kamilala Hill to the north and Tundulu Hill to the east
Strong ProgressAcrossTundulu RC Drilling
AuKing has completed 2,693m of RC drilling in and around the primary target area of Nathace Hill
over 19 holes, and 298m of RC drilling over 2 holes at the Kamilala Hill target area, to a maximum
depth of 150m. An additional 692m has been completed to the west and east Tundulu Hill target
areas. Thompson Resources, the drilling contractor, expects to mobilise the diamond rig to the
Tundulu project site in late July – thereby providing sufficient time to complete the intended RC
drilling component of the program before the diamond rig arrives. A further three RC holes
comprising approximately 450m of drilling are planned, bringing the RC component of the program
to approximately 4,130m across 28 drillholes.
The diamond drilling component of the program will comprise a combination of holes drilled from
surface and diamond tails extending selected RC drillholes, with final hole selection based on
geological logging, geophysical targets and laboratory assay results as they become available.
Figure 2 above illustrates the location and direction of each of the completed RC drillholes and the
table in Annexure A provides further particulars of those holes. Planned RC drillholes are also
illustrated with historical drillhole collar locations.
Page 4 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 2 – Tundulu Project drillhole collar locations and drillhole traces for AKN completed and
planned RC – DDH drilling program with historic drillhole collar locations depicted in yellow.
The widespread occurrence of carbonatite intersected to date continues to strengthen the
Company’s interpretation of a district-scale carbonatite intrusive complex at the Tundulu Project.
Geological logging and laboratory assay results will be integrated with historical drilling data and
recent airborne magnetic survey interpretations to refine the geological model, assess the full
extent of the carbonatite footprint and guide subsequent diamond drilling.
By Authority of the Board
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
Page 5 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Competent Persons’ Statement
The information in this report that relates to the initial observed results from drilling at the Tundulu
Rare Earths Project is based on information reviewed by Mr Ian Hodkinson who is a member of the
Australian Institute of Geoscientists. Mr Hodkinson is a consultant to AuKing Mining Limited and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Hodkinson consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
ANNEXURE A
Tundulu drillhole location details
*Indicates hole is still being drilled to depth
[Note – references to + DDH in the “TYPE” column indicate planned diamond drilling tails at the
base of the RC-drilled hole]
Page 6 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
JORC Code, 2012Edition – “Step-Out Drilling Continues to Expand Carbonatite
Footprint at Tundulu”
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as
where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Reverse Circulation (RC) drilling was
completed using a face-sampling hammer.
• All drillholes were sampled on continuous 1 m
intervals irrespective of lithological
boundaries.
• Sample material was collected from the
cyclone into green mining bags before being
processed using a manual three-tier riffle
splitter to obtain representative calico
samples. Where wet or clay-rich conditions
prevented representative riffle splitting, a
documented spear sampling protocol was
used.
• Geological logging was completed on every
metre using representative RC chips retained
from each interval.
• Sampling procedures were undertaken in
accordance with Company Technical Work
Guideline TWG001.
• The massive nature of the mineralised host unit
is amenable to an industry standard RC
sampling methodology being applied.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Reverse Circulation drilling utilised a face-
sampling hammer with compressed air.
• Drillholes were completed at the planned
orientations using surveyed collar locations
and downhole surveys where appropriate.
• Representative drill chips were collected at 1 m
intervals for geological logging and sampling.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• The bulk weight of each 1 m RC sample was
recorded prior to sample splitting, providing a
quantitative record of sample recovery and
enabling identification of intervals with
anomalously low sample return.
• Bulk sample weights were recorded as a quality
control measure to monitor sample return.
Generally, the range of those weights were 35-
40kgs.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• Representative RC chip trays were prepared and
geologically logged in full at 1 m intervals for all
drillholes.
• Logging included lithology, weathering,
alteration, mineralisation, veining, carbonate
content, magnetic response, grain size, colour
and other relevant geological observations.
• Logging was mostly qualitative in nature and
completed to a level of detail considered
appropriate to support geological interpretation
and future Mineral Resource estimation.
• Geological observations were recorded
independently of any assay information in
accordance with Company logging procedures.
Page 7 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whethersamplesizesare appropriatetothe grain
size of the material being sampled.
• Representative primary samples were obtained
using a manual three-tier riffle splitter.
• Wet or clay-rich samples unsuitable for riffle
splitting were collected using a documented
multi-pass spear sampling methodology.
• Approximately 2–4 kg of sample was collected
into pre-numbered calico bags.
• Remaining reject material was retained in
labelled plastic bulker bags.
• Sample preparation procedures were designed
to minimise sample bias and maintain
representative sampling throughout the drilling
program.
Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
• No assay data is reported.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Geological logging was completed using
standardised electronic logging templates.
• All geological observations were recorded prior
to receipt of analytical results.
• Logging and sampling procedures were
undertaken by Company geologists following
documented Company procedures.
• Sample submissions, QAQC insertion and
laboratory dispatch were recorded using
Company sample management systems.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drillhole collar locations were determined
using a handheld GPS.
• Grid system is in WGS 84 UTM Zone 36 South
• Elevations were determined from previously
reported LiDAR drone survey.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drillhole spacing is irregular and dependant on
the target areas.
• It is considered that the spacing of samples
used is sufficient for the current stage of
exploration.
• No drill sample compositing has occurred.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
• Drillholes were oriented to test the interpreted
geometry of the Tundulu carbonatite intrusive
complex based on historical drilling, geological
mapping and airborne magnetic data.
• Step-out drillholes were designed to test
interpreted extensions of the carbonatite
system beyond historically drilled areas.
Page 8 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
this should be assessed and reported if material. • The true orientation of individual carbonatite
phases has not yet been established; reported
intercepts are downhole lengths and true
widths are currently unknown.
• No orientation-related sampling bias has been
identified.
Sample
security
• The measures taken to ensure sample security. • Samples remained under Company
supervision from collection through logging and
preparation.
• Calico samples were sealed within labelled
polyweave bags for transport in company truck
to warehouse facilities.
• Sample batches were documented using
Company sample submission registers prior to
dispatch to the preparation and analytical
laboratories.
• Remaining RC reject material was retained
onsite in labelled green mining bags where
appropriate.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• Sampling and logging procedures were
undertaken in accordance with Company
Technical Work Guideline TWG001.
• Internal reviews of geological logging, sampling
procedures and QAQC protocols are
undertaken throughout the drilling program.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• AuKing’s Tundulu REE project is located in
southeastern Malawi, approximately 90 km
east of Blantyre.
• The Tundulu Project lies within Exploration
Licence No. EL0731/24 which was granted on
27 May 2024.
• EL0731/24 covers an area of approximately
91.5 square kilometres.
• The Licence is currently 100% held in the name
of Malawian registered Green Exploration Ltd, a
subsidiary of Tusker Minerals Limited and, as
set out in the above release, is the subject of a
transfer approval with the Malawi MMRA.
• There are no known third-party interests
affecting the Licence.
• There are no known impediments to operating
in the project area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Drill hole
information
• A summary of all information material to the
under-standing of theexplorationresultsincluding
a tabulation of the following information for all
Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Page 9 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Data have not been aggregated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
• Reported intersections are downhole lengths.
The true widths of any mineralised intervals are
not yet known.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• All relevant data is reported within the body of
this announcement.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• All relevant data is reported within the body of
this announcement.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
- size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• All relevant data is reported within the body of
this announcement.
Further work • The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large- scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Selective drill program to test the lateral
extents, vertical depths, widths, and
continuation of known mineralization and test
new targets under post-mineralization
sedimentary cover identified from the
outcomes of this survey.
Page 10 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Share your feedback
Discover