Carbonatites Extend to End of 2nd Diamond Hole at 400m
Released
Released
Announcement PDF
AUKING MINING LIMITED ABN 29 070 859 522
Suite 34, Level 10, 320 Adelaide Street, Brisbane Queensland 4000
P 07 3535 1208 W www.aukingmining.com
ASX:AKN
Page 1 of 10
ASX ANNOUNCEMENT
1 September 2026
Carbonatite Lithology Extends to End of Second Diamond Hole
at Tundulu (400m)
Highlights
• Diamond drilling continues at pace at Tundulu, with the diamond drill program progressing
strongly across key target areas.
• Second diamond hole depth extended to 400.42m after geological logging identified multiple
extended carbonatite intersections beyond the initially planned 300m depth. End-of-hole
logging indicates the carbonatite geology remains open at depth.
• Building on previously reported observations from RC and diamond drilling, the second
Tundulu diamond hole has confirmed extensive carbonatite lithology, further strengthening
confidence that the overall geological model is substantially broader and deeper than initially
anticipated.
• With other deep diamond drillholes planned, the current drilling program remains focused on
maximising geological data around Nathace Hill to support a potential maiden Mineral
Resource Estimate later this year.
AuKing Mining Limited (ASX: AKN) (“AuKing” or “the Company”) is pleased to provide a further
progress report on its drilling activities at the Tundulu Rare Earth Project in southern Malawi, having
now commenced the large diamond drilling phase of the program.
Commencement of Diamond Drilling at Tundulu
On 31 July 2026 AuKing confirmed that it had completed the reverse circulation (RC) component of
the initial Tundulu drilling program, having drilled 4,300m across 31 holes. Detailed geological
logging of all these RC drillholes has been completed, confirming widespread carbonatite
lithologies throughout the current drilling area. Of particular interest is the interpretation of
carbonatite material in drillholes situated well away from the primary Nathace Hill target area,
which has been the focus of previous exploration.
Page 2 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 1 – Tundulu Project, highlighting the location of the main target area for drilling at Nathace
Hill with nearby Kamilala Hill to the north and Tundulu Hill to the east
As reported on 17th August 2026, initial diamond drilling commenced at Tundulu at drill hole
26NH032, which had previously been RC drilled to 150m. The plan was to extend the hole with a
150m diamond tail to a total depth of 300m. However, as carbonatite intrusions continued to be
logged, drilling was extended beyond the planned depth, the hole ultimately completed at 510.6m.
Extensive carbonatite geology was identified throughout the extended hole, with end-of-hole
indicating that the carbonatite lithology remained open at the final depth of 510.6m.
The second Tundulu diamond hole was also initially planned to a total depth of 300m (with a 150m
diamond tail). However, as drilling progressed and extensive carbonatite lithology continued to be
logged beyond the planned depth, the hole was extended to 400.42m. Carbonatite geology also
continued through to the end of hole, providing further confidence in the emerging geological
interpretation.
Decision was made to conclude both of these holes and progress drilling to other areas of Nathace
Hill to continue building the broader geological dataset.
The widespread occurrence of carbonatite intersected to date not just around Nathace Hill but at
targets several hundreds of metres away initially strengthened the Company’s interpretation of a
district-scale carbonatite intrusive complex at the Tundulu Project. However, the extension of
carbonatite geology to substantial depths indicates the complex may be significantly larger than
previously interpreted and provides important geological information for the planned maiden
Page 3 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Tundulu Mineral Resource estimate.
Figure 2 – Tundulu Project drillhole update at Nathace Hill for the completion of hole 26NH023.
The red trace shows the approximate downhole trajectory of diamond drilling.
Figure 3 – 26NH023 ~368m to 370.5m depth apatite-rich calcite carbonatite interval bound on
either side by clast supported carbonatite breccias.
Page 4 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Figure 4 – Apatite Calcite Carbonatite drill core from approximately 381m downhole in 26NH023,
showing textural variations and locally developed red-orange mineral/alteration phases and
spotty sulphides. Mineral identification remains subject to detailed logging and analytical
confirmation.
CautionaryStatement –Visual Observations
Visual observations and geological interpretations of drillcore referred to inthis announcement are
based on preliminary geologicallylogging. Suchobservations should not beconsidered aproxy or
substitute forlaboratoryanalysis, whichis requiredtodetermine the presence and grade ofany rare
earthelement mineralisation. Assay results arecurrently pendingandwill be reportedwhen received.
By Authority of the Board
For more information:
Paul Williams Kristin Rowe
Managing Director NWR Communications
M +61 419 762 487 M +61 404 88 98 96
E p.williams@aukingmining.com E kristin@nwrcommunications.com.au
Competent Persons’ Statement
The information in this report that relates to the initial observed results from drilling at the Tundulu
Rare Earths Project is based on information reviewed by Mr Ian Hodkinson who is a member of the
Australian Institute of Geoscientists. Mr Hodkinson is a consultant to AuKing Mining Limited and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Hodkinson consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
Page 5 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
ANNEXURE A
Tundulu drillhole location details
HOLE TYPE EAST NORTH RL TOTAL
DEPTH
AZIMUTH DIP
26NH032 RC + DDH 801423.4 8280349 679.3 510.6 225 -55
26NH023 RC + DDH 801386.0 8280303 701.0 400.42 220 -55
26NH024 DDH 801295 8279909 742.7 * 355 -55
Notes:
1. References to + DDH in the “TYPE” column indicate diamond drilling tails at the base of
the RC-drilled hole; and
2. * denotes incomplete drill hole (currently being drilled).
Page 6 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
JORC Code, 2012Edition – “Carbonatite Lithology Extends to End of Second
Diamond Hole at Tundulu (400m)”
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as
where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
• Reverse Circulation (RC) drilling was
completed using a face-sampling hammer.
• All RC drillholes were sampled on continuous 1
m intervals irrespective of lithological
boundaries.
• Sample material was collected from the
cyclone into green mining bags before being
processed using a manual three-tier riffle
splitter to obtain representative calico
samples. Where wet or clay-rich conditions
prevented representative riffle splitting, a
documented spear sampling protocol was
used.
• Geological logging was completed on every
metre using representative RC chips retained
from each interval.
• Sampling procedures were undertaken in
accordance with Company Technical Work
Guideline TWG001.
• The massive nature of the mineralised host unit
is amenable to an industry standard RC
sampling methodology being applied.
• No diamond core assay results are reported in
this announcement. Diamond core sampling
has not yet been undertaken.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Reverse Circulation drilling utilised a face-
sampling hammer with compressed air.
• Drillholes were completed at the planned
orientations using surveyed collar locations
and downhole surveys where appropriate.
• Representative drill chips were collected at 1 m
intervals for geological logging and sampling.
• Diamond drilling is currently being undertaken
by Thompson Drilling in Malawi using NQ-
diameter diamond core drilling.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• The bulk weight of each 1 m RC sample was
recorded prior to sample splitting, providing a
quantitative record of sample recovery and
enabling identification of intervals with
anomalously low sample return.
• Bulk sample weights were recorded as a quality
control measure to monitor sample return.
Generally, the range of those weights were 35-
40kgs.
• Diamond core recovery is measured for each
drill run by comparing the measured length of
core recovered with the drilled length of the
corresponding core run and is recorded as a
percentage. Core recovery is verified by the site
Page 7 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
geologist and recorded in the drillhole logging
database. Core loss and cavities, where
present, are identified and recorded using
appropriately marked core blocks.
• Core recovery is monitored during drilling.
Where poor recovery is encountered, the drilling
contractor and site geologist assess drilling
conditions and appropriate measures may be
implemented, including adjustment of drill run
lengths and drilling fluid parameters.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• Representative RC chip trays were prepared and
geologically logged in full at 1 m intervals for all
drillholes.
• Logging included lithology, weathering,
alteration, mineralisation, veining, carbonate
content, magnetic response, grain size, colour
and other relevant geological observations.
• Logging was mostly qualitative in nature and
completed to a level of detail considered
appropriate to support geological interpretation
and future Mineral Resource estimation.
• Geological observations were recorded
independently of any assay information in
accordance with Company logging procedures.
• Diamond core is geologically and geotechnically
logged and photographed. Logging includes
lithology, alteration, mineralisation, veining,
structure and other relevant geological
observations.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whethersample sizesare appropriate tothe grain
size of the material being sampled.
• Representative primary samples were obtained
using a manual three-tier riffle splitter.
• Wet or clay-rich samples unsuitable for riffle
splitting were collected using a documented
multi-pass spear sampling methodology.
• Approximately 2–4 kg of sample was collected
into pre-numbered calico bags.
• Remaining reject material was retained in
labelled plastic bulker bags.
• Sample preparation procedures were designed
to minimise sample bias and maintain
representative sampling throughout the drilling
program.
• Diamond core has not yet been sampled for
assay. Following completion of geological and
geotechnical logging and photography,
selected intervals will be marked for sampling
and recorded on a cut sheet. Core selected for
assay will be cut longitudinally using a diamond
core saw, with half-core to be submitted for
analysis and the remaining half retained in
labelled core trays. Sampling is planned on
nominal 1 m intervals, with individual samples
ranging from 0.5 m to 1.5 m to honour
geological and mineralisation boundaries.
Quality of
assay data and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
• No assay data is reported.
Page 8 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Geological logging was completed using
standardised electronic logging templates.
• All geological observations were recorded prior
to receipt of analytical results.
• Logging and sampling procedures were
undertaken by Company geologists following
documented Company procedures.
• Sample submissions, QAQC insertion and
laboratory dispatch were recorded using
Company sample management systems.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drillhole collar locations were determined
using a handheld GPS.
• Grid system is in WGS 84 UTM Zone 36 South
• Elevations were determined from previously
reported LiDAR drone survey.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drillhole spacing is irregular and dependant on
the target areas.
• It is considered that the spacing of samples
used is sufficient for the current stage of
exploration.
• No drill sample compositing has occurred.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
• Drillholes were oriented to test the interpreted
geometry of the Tundulu carbonatite intrusive
complex based on historical drilling, geological
mapping and airborne magnetic data.
• Step-out drillholes were designed to test
interpreted extensions of the carbonatite
system beyond historically drilled areas.
• The true orientation of individual carbonatite
phases has not yet been established; reported
intercepts are downhole lengths and true
widths are currently unknown.
• No orientation-related sampling bias has been
identified.
Sample
security
• The measures taken to ensure sample security. • Samples remained under Company
supervision from collection through logging and
preparation.
• Calico samples were sealed within labelled
polyweave bags for transport in company truck
to warehouse facilities.
• Sample batches were documented using
Company sample submission registers prior to
dispatch to the preparation and analytical
laboratories.
• Remaining RC reject material was retained
onsite in labelled green mining bags where
appropriate.
• Diamond core remains under Company
supervision during transport from the drill site
to the Company's Zomba core processing and
storage facility, where logging, photography,
cutting and sampling are undertaken.
Page 9 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• Sampling and logging procedures were
undertaken in accordance with Company
Technical Work Guideline TWG001.
• Internal reviews of geological logging, sampling
procedures and QAQC protocols are
undertaken throughout the drilling program.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
• AuKing’s Tundulu REE project is located in
southeastern Malawi, approximately 90 km
east of Blantyre.
• The Tundulu Project lies within Exploration
Licence No. EL0731/24 which was granted on
27 May 2024.
• EL0731/24 covers an area of approximately
91.5 square kilometres.
• The Licence is currently 100% held in the name
of Malawian registered Green Exploration Ltd, a
subsidiary of Tusker Minerals Limited and, as
set out in the above release, is the subject of a
transfer approval with the Malawi MMRA.
• There are no known third-party interests
affecting the Licence.
• There are no known impediments to operating
in the project area.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Drill hole
information
• A summary of all information material to the
under-standing of the explorationresultsincluding
a tabulation of the following information for all
Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
• The Company confirms that it is not aware of
any new information or data that materially
affects the information included in the original
announcement dated 17/04/2026.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
• Data have not been aggregated.
Page 10 of 10
AuKingMining Limited P 07 3535 1208 W www.aukingmining.com
Criteria JORC Code explanation Commentary
examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
• If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
• Reported intersections are downhole lengths.
The true widths of any mineralised intervals are
not yet known.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• All relevant data is reported within the body of
this announcement.
Balanced
Reporting
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• All relevant data is reported within the body of
this announcement.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk samples
- size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
contaminating substances.
• All relevant data is reported within the body of
this announcement.
Further work • The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large- scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Selective drill program to test the lateral
extents, vertical depths, widths, and
continuation of known mineralization and test
new targets under post-mineralization
sedimentary cover identified from the
outcomes of this survey.