COB: Rebrand and Major Copper Project Earn-in
Released
Released
Announcement PDF
Market
Update
Highlights
18 February 2025
Cobalt Blue Holdings Limited
A Green Energy
Exploration
Company
COB Diversifies –
Major Copper Project Earn in
COB
ASX Code:
KEY POINTS
Corporate Rebrand
a
Commodity Exposure:
Cobalt, Copper & Sulphur
Directors & Management:
Robert Biancardi
Hugh Keller
Joe Kaderavek
Kelvin Bramley
Non-Exec Chairman
Non-Exec Director
CEO & Exec Director
CFO & Company
Secretary
Capital Structure:
Ordinary Shares at 18/02/2025:436.7m
52.0m
Unlisted options/rights:
Market Cap (undiluted):
$24m
Share Price:
Share Price at 18/02/2025:
Earn-In Agreement for major copper project
a
COB has entered into an Earn-in agreement (‘the Agreement’) with
AuKing Mining Limited (‘AKN’) for the Halls Creek Project (the ‘Halls Creek
Project’ or ‘the Project’); a large scale copper-lead-zinc-silver-gold asset
with significant cobalt potential.
a
The Agreement enables COB to leverage its extensive metallurgical, engineering, and project development expertise to drive portfolio diversification.
a
The Halls Creek Project hosts two major deposits with existing Mineral
Resource estimates containing a combined 89kt copper (Cu), 69kt lead (Pb),
326kt zinc (Zn), 9.2Moz silver (Ag) and 45koz gold (Au) including:
Broken Hill
a
Adelaide
6622
Pyrite Hill
Big Hill
Railway
EL 8891
Sandiego – Total of 4.1Mt (3.7Mt Indicated / 0.4Mt Inferred) at 1.4%
Cu, 0.4% Pb, 4.2% Zn and 25g/t Ag for 56kt contained Cu, 18kt Pb,
175kt Zn, 3.3Moz Ag, and 25koz Au; and
a
Onedin – Total of 4.8Mt (Indicated) at 0.7% Cu, 1.1% Pb, 3.1% Zn
and 38g/t Ag for 33kt contained Cu, 51kt Pb, 151kt Zn, 5.9Moz Ag
and 20koz Au.
a
96% of the total Mineral Resource tonnes are classified as Indicated.
Broken
Hill
16.6m at 10.2% Cu, 0.5% Pb, 1.0% Zn & 316g/t Ag from 130m
118m at 1.1% Cu, 1.6% Pb, 1.1% Zn & 52g/t Ag from 14m (AOWB03)
including:
a
a
ACN:
614 466 607
Address:
Suite 17.03, 100 Miller Street
North Sydney NSW 2060
Ph:
(02) 8287 0660
Website: www.cobaltblueholdings.com
Email:
info@cobaltblueholdings.com
Social:
Cobalt.Blue.Energy
cobalt-blue-holdings
55.1m at 3.5% Cu, 1.2% Pb, 0.8% Zn & 103g/t Ag from 94m
(AORD004) including:
a
a
Cobalt
Project
Cobalt Blue Holdings Limited
Geological modelling has highlighted substantial opportunity for high-grade
extensions and or repetitions with deposits open along strike and at depth.
Drilling by AKN has also intersected substantial zones of near surface
oxide-transition-supergene copper mineralisation at the Onedin deposit with
significant intersections including:
a
N
EL 8143
a
$0.054
Broken Hill
Sydney
Cobalt Blue Holdings Limited (ASX: COB) (‘COB’ or ‘the Company’) is pleased
to announce a proposed rebrand and change of name (subject to shareholder
approval) to better reflect its expanded focus across a broader range of metals.
The proposed new name, Core Blue Minerals Limited, aligns with COB’s
expanded focus beyond cobalt into a diversified commodity portfolio.
21m at 2.1% Cu & 66g/t Ag from 93m
The Project is favourably located within the Kimberley region of Western
Australia; just 15km southwest of Halls Creek and 320km south of Wyndham
port. The area has historically supported the Nicholsons Gold Mine and the
Savannah Nickel-Copper-Cobalt Mine). The Project is supported by strong
logistics support, including established road and port facilities.
MARKET UPDATE
1
Commenting on the corporate rebranding and Earn-in agreement, Cobalt Blue’s Chief Executive Officer, Joe Kaderavek said: “The
Cobalt Blue name no longer reflects the full scope of our business. As our technical and project development expertise uncovers new
opportunities across base and precious metals, a corporate rebrand marks a key milestone. While our commitment to delivering a
strong battery materials strategy remains unchanged, we are actively expanding our portfolio with high-value projects that have the
potential to enhance future earnings.
The Halls Creek Project Earn-in is a transformational step, broadening our commodity exposure and strengthening our resilience
against future pricing cycles. We see immense development potential at Halls Creek and are well-positioned to unlock value through
complementary initiatives—including the development of Australia’s first cobalt-nickel refinery.”
Proposed Corporate Rebrand
Following the development of the ReMine+ business unit and the proposed Earn-in of the Halls Creek Project, COB has expanded
its focus to include non-battery metals, extending beyond cobalt alone. Our three core business pillars remain unchanged, with the
proposed Halls Creek Project Earn-in enhancing our technical and development expertise while reinforcing our long-term growth
strategy.
Recognising this expanded focus, the Board of COB has endorsed a proposal to seek shareholder approval for a name change
to Core Blue Minerals Limited. This transition acknowledges our diversified commodity exposure, providing economic resilience
against individual metal pricing cycles. At the same time, it preserves the strong battery materials branding that is well recognised
by governments, investors, and key stakeholders.
Importantly, the renaming will not impact the Company’s commitment to the Kwinana Cobalt Refinery (‘KCR’) and the Broken
Hill Cobalt Project (‘BHCP’) and our partnership with Iwatani Corporation. These remain core projects for the Company, and we
anticipate providing further updates, particularly on the KCR project, in 1H 2025.
The proposed name change is subject to shareholder approval, with a resolution to be included in the Notice of Meeting for a
general meeting to be scheduled in Q2 2025. The Company’s ASX code will remain the same.
Halls Creek Project Earn-In Agreement
The key terms of the Agreement are as follows:
Stage 1
a
Subject to satisfaction of certain conditions precedent including deeds of assignment and assumption being executed by
relevant third parties, COB will acquire a 51% beneficial interest in the Project by issuing AKN with A$200,000 worth of COB
shares (at an issue price of $0.072 – set at the same level as the recent rights issue), being 2,777,778 shares, which will be
subject to escrow for a period of six months from the date of the Agreement.
a
To retain the 51% beneficial interest COB must meet a minimum expenditure of A$500,000 by 30 June 2027.
Stage 2
a
COB will then have the right (but not the obligation) to earn up to a 75% interest (an additional 24%) in the Project by incurring
an additional A$1.5 million of expenditure on the tenements by 30 June 2028.
a
Should AKN’s interest dilute below 10% the interest shall revert to a 1% Net Smelter Royalty (‘NSR’).
Strategic Rationale
The Halls Creek Project Earn-in provides commodity diversification, reducing exposure to cyclical lows in the global cobalt market.
The low-cost entry structure of the agreement allows COB to progressively increase its beneficial interest in the Project while
significantly advancing its technical development.
Crucially, the low capital intensity of the Earn-in obligations ensures COB can maintain financial flexibility, enabling the Company to
pursue additional growth opportunities through ongoing business development initiatives.
MARKET UPDATE
2
In addition, the agreement delivers the following advantages:
Diversification for Enhanced Resilience
The Halls Creek Project expands the Company’s portfolio beyond cobalt, adding copper, lead, zinc, silver, and gold to our
commodity mix. This diversification enhances resilience against price volatility, creating a more balanced foundation for capital
allocation and strategic planning. By reducing reliance on single-commodity cycles, the Company is strengthening its ability to adapt
to market dynamics with greater agility and unlock new growth opportunities.
Figure 1 – D
iversification provides financial resilience during individual commodity price cycles (Gold,
copper and cobalt prices since 2016, rebased $2024. Source: Fastmarkets, Cobalt Blue Holdings).
Index Value (1 Jan 2016 = 100)
450
400
Copper
350
Cobalt
Gold
300
250
200
150
100
50
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
Strong Market Outlook for Key Commodities
The global outlook for copper, silver, and gold remains strong, driven by robust short- and long-term fundamentals:
a
Copper stands out as one of the most compelling investment opportunities, benefiting from strong demand growth and constrained
supply. Essentially the “metal of electrification”, copper is fundamental in traditional industrial applications as well as vital to all
energy transition plans. Already in strong demand among industrialising economies, global copper consumption is expected to
continue to rise because of its critical role in electrification, decarbonisation technologies, spread of Artificial Intelligence (AI) tools
and data centres. Meanwhile, supply is expected to remain under pressure from decades of underinvestment, declining ore grades,
long project lead times, and increasing resource nationalism.
a
Silver and gold offer additional exposure to strategic and financial metals. In the near term, falling U.S. interest rates, geopolitical
uncertainty, and central bank buying provide strong tailwinds. Over the long term, rising global debt levels and growing demand
for alternative stores of value are expected to further support gold’s role in financial markets.
The Halls Creek Project aligns our portfolio with long-term macroeconomic and geopolitical trends, reinforcing our position in metals
that are essential to the global economy and the energy transition.
Synergies with Our Refinery and Future Feedstock Strategy
A key element of our growth strategy is the advancement of our Kwinana Cobalt Refinery, where we are actively pursuing opportunities to secure domestic feedstocks and expand our processing capabilities. The Halls Creek Project Earn-in aligns with this
objective, creating the potential for integrated value chains that leverage our refining expertise and technical capabilities.
MARKET UPDATE
3
Unlocking Value through Technical Expertise
With a proven track record of technical excellence in project development and metallurgical innovation, COB is uniquely positioned
to unlock the full potential of the Halls Creek Project. Our deep expertise in resource development and process optimisation will
promote value creation while advancing the project efficiently. Integrating the Halls Creek Project Earn-in into our portfolio improves
financial resilience, seizes market opportunities, and solidifies our business as a leading, diversified resource development company.
Halls Creek Project
The Halls Creek Project is located in the Kimberley region of Western Australia; a mature mining jurisdiction with a significant record
of resource production including iron ore, mineral sands, rare earths, nickel, copper, cobalt and gold. Located 15km southwest of
Halls Creek (pop. ~3,500), the project comprises two significant deposits; Sandiego and Onedin. The deposits are directly adjacent
to the Great Northern Highway which connects the Project to Kununurra and Wyndham Port, respectively some 300km and 320 km
north. Wyndham Port is the only deep-water port between Broome and Darwin servicing exports including crude oil, live cattle, raw
mined products, scrap metal and maize from across Northern Australia and produce from the Ord River irrigation area.
Figure 2 – Halls Creek Project – regional location
100km
200km
300km
TIMOR
SEA
Kununurra
Wyndham Port
Argyle
Diamond Mine
Derby
Darwin
N O
NT
Gold Mine
QLD
WA
Brisbane
SA
Perth
NSW
Adelaide
Sydney
Fitzroy Crossing
Savannah
Nickel-Copper
-Cobalt Mine
Browns Range
Rare Earths
Project
Halls Creek
Project
Melbourne
Imagery © 2025 TerraMetrics
MARKET UPDATE
NORTHERN TERRITORY
0km
4
Figure 3 – Wyndham Port facilities (Source: Kimberley Ports Authority)
Other notable projects within the region include the:
a
Nicholsons’ Gold Mine: Located approximately 15km west of the Project area, the Nicholsons Find gold mine was owned
and operated by Pantoro Limited between 2015 and 2023, producing ~30koz gold per annum.
a
Savannah Nickel-Copper-Cobalt Mine: Located approximately 110km north of Halls Creek, the Savannah Nickel Mine was
formerly operated by Panoramic Resources producing nickel-copper-cobalt concentrates which were exported via Wyndham
port. Production ceased in 2024, and the project was recently acquired by Zeta Resources.
a
Argyle Diamond Mine: Located approximately 180km northeast of Halls Creek and 110km southwest of Kununurra,
The Argyle Diamond Mine was formerly operated by Rio Tinto. Over its 37-year life, the mine produced more than 865 million
carats of rough diamonds—operations ceased in late 2020.
a
Browns Range Rare Earths Project: Located approximately 160km southeast of Halls Creek, the Browns Range Project is
currently being advanced through a Definitive Feasibility Study.
The Project has been subject to previous exploration by Billiton Australia Pty Ltd, Lachlan Resources NL, Anglo Australian
Resources NL and AKN through various joint ventures. Since 1990, expenditure attributed to the main deposit areas totals some
A$20 million providing the Company with a strong foundation upon which to advance Project development.
Mineral Resources
The Halls Creek Project is inclusive of two existing Mineral Resources including:
a
Sandiego – 4.1Mt at 1.4% Cu, 0.4% Pb, 4.2% Zn and 25g/t Ag for 56kt contained copper, 18kt lead, 175kt zinc
and 3.3Moz silver.
a
Onedin – 4.8Mt at 0.7% Cu, 1.1% Pb, 3.1% Zn and 38g/t Ag for 33kt contained copper, 51kt lead, 151kt zinc
and 5.9Moz silver.
The Mineral Resource estimates were independently prepared by ERM Australia Consultants Pty Ltd (‘ERM’, formerly CSA Global)
and were originally released to ASX on 7 April 2022 by AKN.
MARKET UPDATE
5
Table 1 – Mineral Resource estimate for the Sandiego deposit detailed by classification.
Note minor rounding errors may have occurred in compilation of this table.
Grade
Classification
Tonnes
(Mt)
Copper
(%)
Lead
(%)
Zinc
(%)
Contained Metal
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Lead
(kt)
Zinc
(kt)
Silver
(Moz)
Gold
(Koz)
18
5
16
0.3
0.2
0.3
39.1
4.8
43.9
3.4
–
3.4
13.6
9.0
22.6
0.98
0.05
1.03
16.4
1.9
18.3
Sandiego (Copper zone reported at a 0.8% copper cut-off grade)
Indicated
Inferred
Sub-total
1.7
0.3
2.0
2.3
1.6
2.2
0.2
–
0.1
0.8
3.0
1.1
Sandiego (Zinc zone reported at a 3% zinc cut-off grade)
Indicated
Inferred
Sub-total
2.0
0.1
2.1
0.6
0.2
0.6
0.7
0.1
0.7
7.3
6.1
7.3
35
10
34
0.1
0.1
0.1
12.0
0.2
12.2
14.0
0.1
14.1
146.0
6.1
152.1
2.25
0.03
2.28
6.4
0.3
6.7
Indicated
Inferred
3.7
0.4
1.4
1.3
0.5
0.0
4.3
3.8
27
6
0.2
0.2
51.1
5.0
17.4
0.1
159.6
15.1
3.23
0.08
22.8
2.2
Total
4.1
1.4
0.4
4.2
25
0.2
56.1
17.5
174.7
3.31
25.0
Total
Table 2 – Mineral Resource estimate for the Onedin deposit detailed by classification.
Note minor rounding errors may have occurred in compilation of this table.
Grade
Classification
Tonnes
(Mt)
Copper
(%)
Lead
(%)
Zinc
(%)
Contained Metal
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Lead
(kt)
Zinc
(kt)
Silver
(Moz)
Gold
(Koz)
47
0.2
16.5
18.0
9.0
2.27
9.7
Onedin (Copper zone reported at a 0.4% copper cut-off grade)
Indicated
1.5
1.1
1.2
0.6
Onedin (Zinc zone reported at a 1% zinc cut-off grade)
Indicated
3.3
0.5
1.0
4.3
34
0.1
16.5
33.0
141.9
3.61
10.6
Total
4.8
0.7
1.1
3.1
38
0.1
33.0
51.0
150.9
5.88
20.3
Growth Potential
Geological modelling undertaken by AKN in support of the Sandiego and Onedin Mineral Resource estimates has substantially
improved the understanding of structural controls on mineralisation. This understanding has highlighted significant opportunity for
high-grade extensions and or repetitions within favourable host rocks and structures proximal to the main deposits and across the
broader tenement portfolio.
Alignment with Refinery
The potential to incorporate cobalt into future Mineral Resource estimates is subject to review with significant intersections from
select drill holes at the Sandiego deposit, including:
a
22m at 12.6% Cu, 1.3% Pb, 8.0% Zn, 0.17% Co & 121g/t Ag from 100m (SRCD031)
a
12.9m at 12.2% Cu, 0.1% Pb, 2.8% Zn, 0.27% Co & 37g/t Ag from 149.5m (SRCD031)
a
10.37m at 9.9% Cu, 0.46% Co & 19g/t Ag from 393.73m (SRCD064)
MARKET UPDATE
6
Figure 4 – Sandiego deposit drilling
MARKET UPDATE
7
Figure 5 – S
andiego deposit cross section illustrating significant cobalt intersections from SRCD031
and SRCD064
Figure 6 – C
OB personnel inspecting core at the Halls Creek core storage facility (Left). High-grade oxidesupergene copper mineralisation intersected by AORD004 comprising 16.6m at 10.2% Cu,
0.46% Pb, 1.03% Zn & 316g/t Ag from 130m (core pictured at approximately 137m)
MARKET UPDATE
8
Figure 7 – Onedin deposit drill plan
MARKET UPDATE
9
Figure 8 – O
nedin deposit cross section illustrating significant copper intersections from AORD004
and AOWB03
Tenement Portfolio
The Project boasts an extensive tenement portfolio covering some 250km2 with the main deposits (Sandiego and Onedin)
hosted within existing Mining Leases (M 80/276 and M 80/277 respectively).
Table 3 – Halls Creek Project tenement schedule
Tenement
Grant Date
Expiry Date
Area (km2)
2/04/1989
2/04/1989
5/04/2031
5/04/2031
2.2
3.2
11/11/2016
24/03/2017
27/11/2018
28/11/2018
27/11/2018
24/10/2022
10/11/2026
23/03/2027
26/11/2028
27/11/2028
26/11/2028
23/10/2027
21.2
51.7
22.7
16.2
109.8
13.7
3/11/2022
3/11/2022
3/11/2022
3/11/2022
3/11/2022
2/11/2026
2/11/2026
2/11/2026
2/11/2026
2/11/2026
1.9
1.8
0.4
1.7
1.9
Mining Leases
M 80/276
M 80/277
Exploration Licences
E 80/4957
E 80/4960
E 80/5076
E 80/5087
E 80/5127
E 80/5707
Prospecting Licences
P 80/1878
P 80/1879
P 80/1880
P 80/1881
P 80/1882
MARKET UPDATE
10
Figure 9 – Halls Creek tenement map
MARKET UPDATE
11
Information required under ASX Listing Rule 5.8.1
Geology and Geological Interpretation
Massive sulphide deposits at Sandiego and Onedin are hosted by the Koongie Park Formation comprising mafic and felsic
volcanics, associated sediments including sandstone, mudstone, carbonate, chert and ironstone, and are intruded by rhyolitic to
rhyodacitic sills, dolerite bodies and basalt dykes. Massive sulphide mineralisation is strata-bound, with disseminated sulphides
overlaying the massive sulphides. Both deposits are interpreted to occur within the limbs of intensely folded, higher order, doubleplunging anticlinal structures.
The massive sulphide deposits of the Halls Creek Project are classified as Volcanogenic Massive Sulphide (‘VMS’) deposits. The mineralogy
of the primary mineralisation at Sandiego is pyrite-sphalerite-pyrrhotite-chalcopyrite +/- galena, which is largely hosted in the magnetite-rich
exhalative suite of rocks where it occurs as a massive conformable wedge-shaped lens 200m in length with a maximum thickness of 75m.
At Onedin, sphalerite is the main sulphide in the primary mineralisation with subordinate pyrrhotite-pyrite-chalcopyrite-galena. Onedin
comprises numerous stacked lenses of mineralisation with a folded and faulted geometry over a vertical extent of 400m.
Both deposits have a deep weathering profile (up to 250m below the surface), resulting in three weathering domains: an oxidised
zone at the surface, a primary zone at depth, and a transition zone in between.
The geological interpretation supporting the Mineral Resource estimates was guided firstly by geology, and secondly by grade
envelopes to constrain mineralisation. Zinc domains were based on nominal lower cut-off grades of 1.5 % Zn (Onedin) and 1.0 % Zn
(Sandiego); copper domains were based on nominal lower cut-off grades of 0.4 % Cu (Onedin) and 0.5 % Cu (Sandiego). Internal
dilution was permitted during the interpretation of the mineralisation domains, however it was limited to 3 m in most cases. Some
overlap of the zinc and copper zones occurs. Weathering domains were interpreted for the Base of Complete Oxidation (‘BOCO’)
and Top of Fresh (‘TOFR’) interfaces. The Onedin Mineral Resource extends along strike 300m, across strike by 200m and has a
depth extent below surface of 400m. The Sandiego Mineral Resource extends along strike 300m, across strike by 200m and has
a depth extent below surface of 600m.
Sampling and Sub-sampling Techniques
Sampling and sub-sampling techniques have varied between phases of exploration at the Sandiego and Onedin deposits and are
summarised in Table 4 for each respective period.
Table 4 – Summary of sampling and sub-sampling techniques since 1995
Period
Sampling and Sub-Sampling Techniques
Diamond Drilling
1995–1996
Diamond drilling was used to obtain core from which intervals averaging 1m in length were sawn to produce
samples (typically quarter (25%) core). These samples were crushed, split and pulverised for analysis. Details of
sub-sampling, lab preparation techniques are not recorded.
2006– 2011
Diamond drilling was used to obtain core from which intervals averaging 1m in length were sawn to produce
quarter (25%) core or half (50%) core samples from HQ or NQ core respectively. These samples were crushed, split
and pulverised to produce a sample for analysis. Details of sub-sampling and lab preparation techniques are not
recorded.
2021
Diamond drilling was used to obtain core from which intervals averaging 0.95m in length were sawn to produce
quarter (25%) core or half (50%) core samples from PQ3 / HQ3 or HQ core respectively. These samples were
crushed (passing -10mm), riffle split and pulverised (80% passing -75µm) to produce a sample for analysis.
RC Drilling
1995–1996
RC drilling was used to obtain 1m samples by means of a riffle splitter which were composited into 4m intervals
for analysis. Composite samples returning Cu, Pb or Zn >1%, and or Au >1/g/t were typically re-assayed at 1m
intervals. Details of sample compositing, sub-sampling and lab preparation techniques are not recorded.
2006–2008
RC drilling was used to obtain 4m composite samples by means of a sample ‘spear’. These samples were
crushed, split and pulverised to produce a sample for analysis. Details of sub-sampling and lab preparation
techniques are not recorded.
2010–2011
RC drilling was used to obtain 1m samples by means of a cone splitter. These samples were crushed, split and
pulverised to produce a sample for analysis. Details of sub-sampling and lab preparation techniques are not
recorded.
2021
RC drilling was used to obtain 1m samples by means of a cone splitter from which up to 3.5kg was pulverised
(80% passing -75µm) to produce a sample for analysis. Samples >3.5kg were riffle split and pulverised (80%
passing -75µm) to produce a sample for analysis.
MARKET UPDATE
12
Drilling Techniques
The Sandiego drilling database comprises drill holes completed from 1995 including 3 diamond drill holes, 53 reverse circulation
(‘RC’) drill holes and 42 diamond drill holes with RC pre-collars (‘RCDD’) of varying depths. In addition, the database includes
35 drill holes (27 diamond drill holes and 8 RC drill holes) for which no information regarding the date of drilling or details related
to drilling techniques is recorded. A summary of the number of drill holes and drilling techniques since 1995 is provided in Table 5.
Table 5 – Summary of drilling techniques employed at the Sandiego deposit since 1995
No. Drill Holes
No. Metres
Drilling Diameters
Year
Diamond
RC
RCDD
Total
Diamond
RC
Total
Diamond
RC
1995
–
4
5
9
630.6
1,096.65
1,727.25
1996
–
6
8
14
1,427.6
1,928.1
3,355.7
NQ2–HQ3
4.75–5.625”
2006
–
–
4
4
912.65
520.75
1,433.4
2008
–
22
11
33
2,289.8
5,208.4
7,498.2
2010
2
11
10
23
1,220.1
3,193.9
4,414
NQ2–HQ2
5.25”
2011
–
3
–
3
–
648
648
2021
1
7
4
12
1,742.58
1,431.33
3173.91
NQ2–HQ2
5.5”
Total
3
53
42
98
8,223.33
14,027.13
22,250.46
–
–
The Onedin drilling database comprises drill holes completed from 1995 including 8 diamond drill holes, 41 RC drill holes and 21
diamond drill holes with RC pre-collars (‘RCDD’) of varying depths. In addition, the database includes 21 diamond drill holes for
which no information regarding the date of drilling or details related to drilling techniques is recorded. A summary of the number of
drill holes and drilling techniques since 1995 is provided in Table 6.
Table 6 – Summary of drilling techniques employed at the Onedin deposit since 1995
No. Drill Holes
No. Metres
Drilling Diameters
Year
Diamond
RC
RCDD
Total
Diamond
RC
Total
1995
–
22
10
32
759.2
3,918.9
4,678.1
1996
–
5
6
11
1,004.72
1,661.08
2,665.8
2006
1
1
2
4
558.9
383.1
942
2008
–
4
2
6
322.3
2021
7
9
1
17
Total
8
41
21
70
Diamond
RC
NQ2–HQ3
4.75–5.625”
NQ2–HQ2
5.25”
1,054
1,376.3
1,627
1,577.7
3,204.7
HQ2/HQ3–PQ3
5.5”
4,272.12
8,594.78
12,866.9
–
–
Mineral Resource Classification
The Mineral Resource models were classified based upon drill hole spacing, quality of sampling and sample analyses, quantity of
density measurements, and the relative confidence in the geological interpretation. The Mineral Resource estimates are supported
by confidence in the geological interpretations, sufficient to assume geological and grade continuity to satisfy an Indicated classification. All blocks within the Onedin Mineral Resource are classified as Indicated in accordance with the JORC Code; the Sandiego
Mineral Resource is classified as a combination of Indicated and Inferred.
MARKET UPDATE
13
Figure 10 – Sandiego Mineral Resource block model looking southwest illustrating block distribution by
resource classification for the respective copper and zinc zones.
Figure 11 – Onedin Mineral Resource block model looking southwest illustrating block distribution by
resource classification for the respective copper and zinc zones.
MARKET UPDATE
14
Sample Analysis Method
Sample analysis methods have varied between phases of exploration at the Sandiego and Onedin deposits are summarised in Table
7 for each respective period.
Table 7 – Summary of sample analysis methods since 1995
Period
Sample Analysis Method
Diamond Drilling
1995–1996
Samples were analysed via atomic absorption spectroscopy (‘AAS’) reporting a limited and variable suite of
elements (nominally Cu, Pb, Zn and Ag). Au was variably analysed by fire assay. Details of lab digestion techniques
are not recorded.
2006– 2011
Samples were subject to mixed-acid digestion and analysis via Inductively Coupled Plasma - Mass Spectrometry
(‘ICP-MS’) or Inductively Coupled Plasma - Optical Emission Spectroscopy (‘ICP-OES’) reporting a variable suite
of elements. Au was typically analysed by fire assay using a 40–50g charge with an AAS finish.
2021
Samples were subject to mixed-acid digestion and analysis via ICP-OES for a suite of 39 elements. Au was
analysed by fire assay using a 30g charge with an AAS finish.
RC Drilling
1995–1996
Samples were analysed via AAS reporting a limited suite of elements (nominally Cu, Pb, Zn and Ag). Au was
variably analysed by fire assay.
2006–2008
Samples were subject to mixed-acid digestion and analysis via ICP-MS or ICP-OES reporting a variable suite of
elements. Au was typically analysed by fire assay using a 40–50g charge with an AAS finish.
2010–2011
Samples were subject to mixed-acid digestion and analysis via ICP-OES reporting a variable suite of elements.
Au was typically analysed by fire assay using a 50g charge with an AAS finish.
2021
Samples were subject to mixed-acid digestion and analysis via ICP-OES for a suite of 39 elements. Au was
analysed by fire assay using a 30g charge with an AAS finish.
Mineral Resource Estimation Methodology
A block model with block sizes 5m (X) x 10m (Y) x 10m (Z) was constructed for each deposit, with the individual blocks assigned
to the local geological domains (mineralisation and weathering) and each interpolated with a Cu, Zn, Au and Ag grade. The block
size adopted corresponds to approximately half the drill hole spacing. Drill samples were flagged by mineralisation and weathering
domains, and the drill samples composited to 1m length intervals. Composited sample data were statistically reviewed to determine
appropriate top-cuts, with top-cuts applied for Zn, Cu, Ag and Au where required. Variograms were modelled for Cu and Zn from
top cut and composited sample data within their respective mineralisation domains. Low to moderate relative nugget effects were
modelled across all mineralisation domains, with short ranges of approximately 50 m observed for both Zn and Cu.
Grade interpolation was caried out via Ordinary Kriging (‘OK’) for the Sandiego deposit, and via Inverse Distance Squared (‘IDS’) for the
Onedin deposit. All sub-blocks were assigned the grade of their parent block. Sample search ellipse radii varied according to deposit
and grade variable, with a sample search ellipse of up to 60m by 30m by 20m (perpendicular to strike) used for Cu and Zn interpolation
at Sandiego, with a minimum of 8 samples and maximum of 24 samples used to interpolate grade into any one block. A maximum
of 4 samples per drill hole was used for grade interpolation for each block. Search radii were increased, and the minimum number of
minimum samples reduced in subsequent sample searches if cells were not interpolated in the first pass. Octant searches were not
used. The interpolated grades were validated by way of review of cross sections (block model and drill samples presented with same
colour legend); swath plots, and comparison of mean grades from drillhole data with block model grades.
Mineral Resource Cut-Off Grades
The Mineral Resources have been reported above Cu and Zn cut-off grades of 0.8% Cu and 3% Zn (Sandiego), and 0.4% Cu and
1% Zn (Onedin). The basis for the selection of the cut-off grades reflect