Significant initial uranium results from Mkuju project
Released
Released
Announcement PDF
Auking Mining Limited
ASX:AKN
Suite 2208, Level 22
127 Creek Street
Brisbane Queensland 4000
ABN 29 070 859 522
Phone 07 3535 1208
www.aukingmining.com
16 October 2023
ASX RELEASE
Significant uranium results from initial exploration at
Mkuju in Tanzania
Highlights
• Stage 1 drilling up to 3,000m and associated rock chip and soil sampling
exploration program underway at the Mkuju Uranium Project, in southern
Tanzania has returned high grade U3O8 results including:
MKGS001 499ppm U3O8
MKGS006 481ppm U3O8
MKGS021 6,213ppm U3O8
• Mkuju comprises a 730sq km licence area immediately adjacent to the world
class Russian-owned Nyota uranium project.
• A hand-held spectrometer is also being used as part of the Mkuju program and
is producing highly elevated radiation readings in and around the same sample
areas.
• These initial results provide confirmation of potentially significant uranium
mineralisation across the historical radiometric survey conducted over the
Mkuju Project area.
• Shallow (<30m) auger drilling underway and an air core rig (for deeper 150m
drilling) being mobilised later in October, creating opportunity for further
results from the drilling program to follow over the next several weeks.
Cautionary Statement
The Company uses a Delta Olympus portable hand-held pXRF analyzer and an RS230 gamma ray
spectrometer to screen all samples for mineralisation before submitting samples to the lab for assay.
This allows for some understanding of the distribution of mineralisation prior to sampling to better
ensure that samples submitted for analysis are representative of the type and style of mineralisation.
The hand-held XRF and spectrometer units provide confirmation that mineralisation is present
1
however it is not an accurate determination of the elemental concentration within the sample
anlaysed. Limitations include: very small analysis window, possible inhomogeneous distribution of
mineralisation, analytical penetration depth, possible effects from irregular rock surfaces.
Accordingly, results obtained from the hand-held pXRF and spectrometer units are indicative only
and may not be representative of elemental concentration within the material sampled. The pXRF
and spectrometer readings published in this release are subject to confirmation by chemical analysis
from an independent laboratory.
AuKing Mining Limited (ASX: AKN) has confirmed potentially significant uranium
mineralization at its Mkuju Uranium Project in southern Tanzania, after its Stage 1
exploration and drilling program returned results up to 6,213ppm U3O8.
AuKing’s CEO, Mr Paul Williams, said Mkuju was emerging as a possible major extension
of the world class nearby Nyota Uranium Project that was sold by previous owner Mantra
Resources in 2011 for $1.16Bn.
“Mkuju has always been the Company’s major focus of proposed activities in Tanzania due
to its proximity to Nyota and the considerable body of historical exploration on our ground,”
Mr Williams said.
“These initial results from this program establish Mkuju’s case as a major target for uranium
mineralization and we look forward to what the rest of the program reveals over the coming
weeks. We will continue to carry out preliminary pXRF and spectrometer measurements on
the drilling and other samples prior to their dispatch for assay,” he said.
Figure 1 – Mkuju Project Location
2
Initial Mkuju Exploration Results
A summary of the results achieved so far from the Stage 1 exploration program at Mkuju are
as follows:
• Commenced a broad regional soil sampling program in late August – while no
significant results were apparent from these samples, the program provided the basis
for a more specific/targeted soil and rock chip sampling exercise based around the
Mantra Resources’ 2007 radiometric survey (see further details below);
• The more targeted soil and rock chip sampling program has produced 21 sample
results, full details of which are set out in Annexure A below and with highlighted
results shown in Table 1 and Figure 2 below, including an outstanding pXRF result of
6,213ppm U from sample MKGS021:
Sample Code
MKGS001
MKGS004
Samples Details
Sample Type Eastings
Soil
243828
Soil
245185
Northings
8858853
8863470
RL
731
720
Spectrometer
CPS
U308(ppm)
3,270
170
5,086
260.9
XRF
PPM
499
51
MKGS006
MKGS007
MKGS010
MKGS011
MKGS012
MKGS014
Soil
Soil
Soil
Rock chip
Soil
Soil
245340
245264
243424
243672
243807
243976
8863665
8864181
8858023
8858064
8858798
8858847
727
716
711
707
736
717
7,025
2,100
3,167
5,290
2,213
3,559
246.8
103.9
142.8
241.6
113.7
137.4
481
<LOD
<LOD
<LOD
<LOD
<LOD
MKGS015
MKGS018
MKGS019
MKGS021
Rock chip
Soil
Soil
Rock chip
Soil
Soil
243996
243456
243520
243088
244791
244838
8858846
8855994
8856001
8855926
8853748
8853716
720
790
786
793
746
754
13,890
7,865
8,203
1,439
2,747
4,525
778.7
438.5
412.7
73.5
133.9
237.5
<LOD
32
38
6,213
75
<LOD
MKG2024
MKG2026
Table 1 – Mkuju Soil and Rock Chip Sample Results
•
•
AuKing experienced significant delays in securing mobilization of an auger drilling rig
to the Mkuju site and upon its arrival, the rig has experienced various technical faults
which have limited the ability to successfully drill any holes to date. Work will continue
to bring this rig up to steady operating condition – thereby allowing drill holes up to
around 30m to be conducted in less accessible areas at Mkuju; and
Arrangements have now been made to mobilise an air core drilling rig to Mkuju later
this month, creating the capacity to drill holes to a depth of 150m, depending on the
ground conditions. An estimated initial 1,000m of air core drilling is planned as part of
the Stage 1 program. However, if results from the early deeper drilling are positive,
AuKing plans to continue drilling until the wet season onset expected later in the year.
3
Figure 2 – Mkuju Soil and Rock Chip Sample Locations
Mkuju Project Location and Geology
AuKing has secured the grant of several contiguous prospecting licences (“PLs”) over the
Mkuju project area which is in southern Tanzania, approximately 470km south-west of Dar
es Salaam.
The Mkuju area was identified as prospective for uranium during reconnaissance exploration
undertaken between 1978 and 1982 by the German group Uranerzbergbau GmbH. The
Project lies within the Karoo Supergroup sediments of Permian to Jurassic age. The host
4
stratigraphy is a series of sub-horizontal, very coarse, feldspathic, arkosic sandstones with
minor inter-bedded claystones and siltstones.
Historical Mkuju Exploration
Mkuju is situated immediately to the south-east of the world class Nyota uranium project that
was the primary focus of exploration and development feasibility studies by then ASX-listed
Mantra Resources Limited (MRU). Not long after completion of feasibility studies for Nyota in
early 2011, MRU announced a A$1.16Bn takeover offer from the Russian group ARMZ. The
takeover was finalised in mid-2011.
MRU completed a high-resolution helicopter-borne radiometric survey over the entire Mkuju
River Project area in mid-2007 which resulted in the identification of several uranium
anomalies requiring field evaluation. Geological mapping, ground radiometrics and trenching
was completed on various target areas. Although preliminary in nature, the field
observations were positive with visible uranium mineralisation being recorded in trenches at
a number of the targets.
The historical MRU mapping identified sub-horizontal beds of medium to coarse grained
sandstones, interbedded, multiple layers of claystone and a distinctive stratigraphic marker
horizon consisting of petrified wood fragments and tree trunks. The mapping confirmed the
radiometric anomalism to be associated with two linear structural corridors and associated,
second order north-west orientated jointing and faulting. Secondary uranium mineralisation
is associated with the claystone and wood bearing gritstone horizons, with enrichment along
the preferred structural zones. The location of the potential ‘remobilised’ uranium and
testing of high-grade zones will be the focus of AuKing’s drilling program.
Mkuju Licences
AuKing holds seven granted PLs in the Mkuju region covering an area of 730sq kms. All of
these licence areas are situated across Mantra’s historical radiometric anomaly and provide
an opportunity to identify a substantial extent of additional uranium mineralization than what
has previously been identified at Nyota.
This announcement has been authorised by Paul Williams, CEO, AuKing Mining
Limited.
For more information, please contact:
Paul Williams
Chief Executive Officer
Mobile +61 419 762 487
p.williams@aukingmining.com
Gareth Quinn
Investor Relations
Mobile + 61 417 711 108
gareth@republicpr.com.au
5
Competent Persons’ Statement
The information in this report that relates to exploration results at the Mkuju Project is based
on information compiled by Mr Chris Bittar who is a member of the Australasian Institute of
Mining and Metallurgy. Mr Bittar is an employee of AuKing Mining Limited and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.’ Mr Bittar consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
About AuKing Mining
AuKing Mining (ASX:AKN) is a mining exploration company focused on uranium, copper and zinc
projects in both Tanzania and Australia.
AuKing is focussed on the exploration and development of six uranium and copper projects in Tanzania
including:
Mkuju – near to the world class Nyota uranium project in southern Tanzania; the subject of significant previous
exploration
Manyoni/Itigi – the subject of significant exploration situated in central Tanzania, just west of Dodoma
Mpanda/Karema – prospective copper areas in western Tanzania that were the subject of historic mining
operations but largely untouched by modern exploration methods.
The Company also holds the Koongie Park Copper Zinc Project in Western Australia’s Halls Creek Region
hosts a JORC resource and is neighboured by several significant mining and development operations including
Nicholson’s Gold Mine and Savannah Nickel Mine. Koongie Park has already been the subject of significant
exploration drilling and analysis since the 1970’s, hosting over 300 RC and diamond drill holes consisting of
more than 60,000m of drilling in total.
AuKing recently announced the results of its Koongie Park Scoping Study on a proposal to commence mining
operations around a central processing facility at Sandiego.
For further information
www.aukingmining.com
6
ANNEXURE A – Initial Mkuju rock chip and soil samples (Full Table)
Sample Code
MKGS001
MKGS002
MKGS003
MKGS004
Samples Details
Sample Type Eastings
Soil
243828
Soil
243723
Soil
243818
Soil
245185
Northings
8858853
8858630
8858456
8863470
RL
731
735
719
720
Spectrometer
CPS
U308(ppm)
3,270
170
1,005
36.4
570
15.2
5,086
260.9
XRF
PPM
499
<LOD
<LOD
51
<LOD
481
<LOD
MKGS005
MKGS006
MKGS007
MKGS 008
MKGS009
MKGS010
Soil
Soil
Soil
Soil
Soil
Soil
245179
245340
245264
245287
243050
243424
8863475
8863665
8864181
8864198
8858083
8858023
741
727
716
731
712
711
356
7,025
2,100
1,532
3,167
44
246.8
103.9
<LOD
62.7
142.8
MKGS011
MKGS012
MKGS013
MKGS014
MKGS015
MKGS016
Rock chip
Soil
Soil
Soil
Rock chip
Soil
243672
243807
243810
243976
243996
243419
8858064
8858798
8858821
8858847
8858846
8856827
707
736
744
717
720
770
5,290
2,213
1,056
3,559
13,890
1,260
241.6
113.7
46.7
137.4
778.7
56.8
<LOD
<LOD
<LOD
<LOD
<LOD
<LOD
MKGS017
MKGS018
MKGS019
MKGS020
MKGS021
MKG2022
Soil
Soil
Soil
Soil
Rock chip
Soil
243088
243456
243520
243889
243088
246299
8855926
8855994
8856001
8856002
8855926
8853142
793
790
786
766
793
728
1,439
7,865
8,203
1,840
1,439
1,103
73.5
438.5
412.7
83.2
73.5
11.4
35
32
38
<LOD
6,213
<LOD
MKG2023
MKG2024
MKG2025
MKG2026
Soil
Soil
Soil
Soil
245018
244791
244820
244838
8853196
8853748
8853737
8853716
735
746
757
754
1,420
2,747
1,053
4,525
54.8
133.9
46.5
237.5
<LOD
75
40
<LOD
<LOD
<LOD
[Note Co-ordinate System WGS84/UTM zone 37s was applied for these results]
7
JORC Code, 2012 Edition – Significant uranium results from initial
exploration at Mkuju in Tanzania
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Commentary
•
Rock chip sampling was undertaken over
selected areas on both a visual basis and
with the use of a handheld spectrometer
(RS230) to confirm the geological
interpretation.
•
Soil samples were collected over specific
target areas over a nominal 200m spacing.
•
The rock chip and soil samples were
analysed using a handheld Olympus Delta
XRF unit and a handheld RS230
Spectrometer and have been reported in
Annexure A of the Report.
Drilling
techniques
•
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
•
AKN is currently conducting an auger drilling
program and will shortly commence air core
drilling over the target areas.
Drill sample
recovery
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
AKN has not completed any Drill sampling.
•
Logging was both brief qualitative description
of individual rock chips.
•
•
•
No sub-sampling techniques employed.
Field QAQC was undertaken using CRM’s.
The
sample
sizes
are
considered
appropriate given the nature of the rock chips
and soil samples collected.
•
•
Logging
•
•
•
Sub-sampling
techniques
and sample
preparation
•
•
•
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
8
Criteria
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and assaying
Location of
data points
Data spacing
and
distribution
Orientation of
data in
relation to
geological
structure
Sample
security
Audits or
reviews
JORC Code explanation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For
geophysical
tools,
spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The measures taken to ensure sample
security.
Commentary
•
•
The results of any audits or reviews of
sampling techniques and data.
•
•
•
All XRF readings from Mkuju were
conducted in the field using an Olympus
Delta XRF.
Samples were analysed in the field at the
time of collection.
Suitable settings and standards were used
on a daily basis to calibrate the unit.
•
No verification conducted.
•
All location data is collected in WGS84/UTM
Zone 37s.
Sample locations were surveyed with a
handheld GPS unit.
RL’s are not reported.
•
•
•
•
Rock chip and soil sampling was complete
over a variety of areas which resulted in
considerable variation in the sample spacing
and orientation.
Rock chip and soil samples targeted
radiometric anomalies.
•
No orientation bias was considered.
•
The chain of custody is managed by AKN.
The samples will be freighted directly to the
relevant laboratories for analysis.
No independent audit or review has been
undertaken to date.
9
Section 2 Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
Geology
Drill hole
information
Data
aggregation
methods
Relationship
between
mineralisation
widths and
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a license to operate in the area.
• Acknowledgment and appraisal of exploration
by other parties.
Commentary
•
The Mkuju project is located on PL 12184,
PL12185, PL12186, PL12187, PL12189,
PL12192, and PL12485 and all of the
tenements are in good standing.
•
Deposit type, geological setting and style of
mineralisation.
•
• A summary of all information material to the
under-standing of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length
• If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
•
•
No drilling information provided.
The rock chip and soil sample results have
been reported in Annexure A of the Report.
•
•
No specific intervals are being reported.
Metal equivalent values have not been used.
•
No relationship between mineralisation
widths and sample size or length.
•
•
MRU completed a high-resolution helicopterborne radiometric survey over the entire
Mkuju River Project area in mid-2007 which
resulted in the identification of several
uranium anomalies requiring field evaluation.
Geological mapping, ground radiometrics
and trenching was completed on various
target areas. Although preliminary in nature,
the field observations were positive with
visible
uranium
mineralisation
being
recorded in trenches at a number of the
targets.
The regional geology is dominated by Karoo
Basin siltstone and sandstone sediments.
The mineralisation is interpreted to be
analogous to ‘roll-front’ uranium deposits,
specifically hosted in muti-stacked Karoo
Basin sandstone and siltstone sequences.
10
Criteria
intercept
lengths
JORC Code explanation
• If it is not known and only the down hole lengths
are reported, there should be a clear statement
to this effect (e.g. ‘down hole length, true width
not known’).
Commentary
Diagrams
• Appropriate maps and sections (with scales)
and tabulations of intercepts should be included
for any significant discovery being reported.
These should include, but not be limited to a
plan view of drill hole collar locations and
appropriate sectional views.
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• Other exploration data, if meaningful and
material, should be reported including (but not
limited
to):
geological
observations;
geophysical survey results; geochemical
survey results; bulk samples - size and method
of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential deleterious
or
contaminating substances.
• The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large- scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
Relevant diagrams have been included
within the main body of text.
•
Anomalous XRF readings have been
identified at Mkuju, these samples will be
sent to the laboratory for an accredited
assay, where the results will be tabulated
for release.
XRF and spectrometer readings should be
considered a guide only.
This reporting method has been deemed
appropriate for this stage of the project.
Balanced
Reporting
Other
substantive
exploration
data
Further work
•
•
•
No other substantive data exists.
•
Once assay results have been received and
reviewed, further drilling and geophysical
work will be considered to assess the
potential of the Mkuju project.
11
Share your feedback
Discover