COB: Halls Creek Scoping Study Commences and Refinery Update
Released
Released
Announcement PDF
Market
Update
Highlights
24 March 2025
Cobalt Blue Holdings Limited
COB
ASX Code:
Commodity Exposure:
Halls Creek Scoping Study
Commences and Refinery Update
KEY POINTS
Cobalt, Copper & Sulphur
Halls Creek Project
Directors & Management:
a
Cobalt Blue Holdings Limited (‘COB’ or ‘the Company’) (ASX: COB) recently
acquired a 51% beneficial interest in the Halls Creek Project (‘Halls Creek’ or
‘the Project’) via an earn-in agreement (refer COB’s ASX announcement dated
18 February 2025).
a
The Project hosts two major deposits with existing Mineral Resource estimates
containing a combined 89kt copper (Cu), 69kt lead (Pb), 326kt zinc (Zn),
9.2Moz silver (Ag) and 45koz gold (Au), including:
a Sandiego – Total of 4.1Mt (3.7Mt Indicated / 0.4Mt Inferred) at 1.4%
Cu, 0.4% Pb, 4.2% Zn and 25g/t Ag for 56kt contained Cu, 18kt Pb,
175kt Zn, 3.3Moz Ag, and 25koz Au; and
Robert Biancardi
Hugh Keller
Joe Kaderavek
Kelvin Bramley
Non-Exec Chairman
Non-Exec Director
CEO & Exec Director
CFO & Company
Secretary
Capital Structure:
Ordinary Shares at 24/03/2025:439.5m
Unlisted options/rights:52.0m
Market Cap (undiluted):$26.8m
Share Price:
Share Price at 24/03/2025:$0.061
a
a
Under the earn-in agreement COB has the right (but not the obligation)
to increase its interest in the Project to 75% subject to satisfying certain
expenditure thresholds.
a
COB has completed a comprehensive desktop review (the ‘Review’) of Halls
Creek and identified development options to be advanced via a Scoping
Study—forecast for completion in or around June 2025:
Cobalt Blue Holdings Limited
ACN:
614 466 607
Address:
Suite 17.03, 100 Miller Street
North Sydney NSW 2060
Ph:
(02) 8287 0660
Website: www.cobaltblueholdings.com
Email:
info@cobaltblueholdings.com
Social:
Cobalt.Blue.Energy
cobalt-blue-holdings
Onedin – Total of 4.8Mt (Indicated) at 0.7% Cu, 1.1% Pb, 3.1% Zn
and 38g/t Ag for 33kt contained Cu, 51kt Pb, 151kt Zn, 5.9Moz Ag
and 20koz Au.
a
The Review included an extensive compilation of historical metallurgical
testwork demonstrating that high metal recoveries are achievable.
a
COB intends to advance flowsheet development using two separate
processing pathways, with treatment of:
a
a
Oxide / transition mineralisation via acid leaching (heap leach)
a
Sulphide mineralisation via flotation
Mine scheduling will nominally evaluate a proposed process plant with
a feed capacity of 700–800ktpa.
Kwinana Cobalt Refinery Update
a
With 80% of the detailed plant engineering completed, the Kwinana Cobalt
Refinery (‘KCR’) is advancing through the final stages to support a Final
Investment Decision (‘FID’).
a
Permitting has progressed through public consultation period and is
being assessed by the Western Australian Department of Water and
Environmental Regulation.
a
COB was pleased to host our potential partner, Iwatani, at the Broken Hill
Technology Development Centre in early March.
MARKET UPDATE
1
Halls Creek Project
COB to Commence 2025 Scoping Study
The Sandiego and Onedin deposits at Halls Creek have been subject to previous economic evaluations and COB has now
completed a comprehensive Review of these evaluations and related data.
The Review has identified options for potential commercial development of the Sandiego and Onedin deposits which are to be
advanced via a Scoping Study (the ‘Study’). The Study will capitalise on the extensive body of historical work delivered by over
A$20 million of exploration investment undertaken by previous owners and partners.
The Study will be completed by the Company’s technical team with engagement of external consultants for select disciplines.
Specifically, the Study will provide a preliminary economic assessment of the project and COB expects to have completed the
Scoping Study by June 2025.
Acquisition Rationale
While remaining committed to our current project pipeline, COB actively seeks assets that align with our strategy and expertise.
With substantial work already completed, Halls Creek strengthens our portfolio for two key reasons, as follows:
Near-term cash flow: With +40 years of groundwork completed, COB is ready to advance Halls Creek, backed by our team’s
expertise in metallurgical innovation and resource project development. This positions the Project for rapid advancement into an
operational asset with near-term cash flow.
Commodity cycle resilience: The Project expands our exposure to metals such as copper, zinc, lead, silver, and gold. This diversification strengthens our ability to weather price swings, optimise capital allocation, and seize new opportunities in shifting market conditions.
The recent recovery in cobalt prices aptly highlights cobalt as a cyclical commodity subject to market forces that can rapidly
influence supply and demand dynamics. The rapid +60% price rebound in recent weeks is clearly a reaction to a restriction of nearterm supply availability in an otherwise saturated market. Although the length of supply tightness is difficult to anticipate, it serves as
a reminder that the 2.5-year-long price decline was a supply-driven event. Demand for cobalt remains well above historical trends,
and as supply growth normalises, prices may potentially be pressured back toward long-term averages. With progressed cobalt
assets, COB remains well positioned to benefit from any such upturn in cobalt markets.
Figure 1 – C
OB’s portfolio comprises a compelling mix of assets across strategic commodities critical to the
global economy
Kwinana
Cobalt
Refinery
COB
Broken Hill
Cobalt
Project
Halls
Creek
Project
MARKET UPDATE
2
Desktop Review
The Sandiego and Onedin deposits at Halls Creek have been subject to previous economic evaluations COB has now completed a
comprehensive Review of these evaluations and related data.
A summary of key outcomes of the Review is provided.
Metallurgical Factors
An extensive compilation of historical metallurgical testwork has been completed. The previous testwork programs broadly considered the delineation of dominant mineralisation styles differentiated by oxidation state and major element composition (nominally
copper and zinc zones) reflective of the domains used to constrain the Mineral Resource estimates.
Previous testwork indicated high metal recoveries are achievable with several processing options evaluated to maximise project
economics. Based on these results, COB will advance flowsheet development, evaluating the following proposed processing pathways.
a
Treatment of oxide / transition mineralisation via acid leaching (heap leach)
Oxide – transition material is delivered to the processing plant and crushed to a desired particle size for stockpiling on the heap
leach pad. A leaching solution is applied to the heap leach pad and leaches out the target metals from the material. The leach
solution is transferred over to a solvent extraction circuit where copper and zinc are selectively extracted and processed via
electrowinning to recover copper and zinc metals.
Initial acid leaching testwork focused on copper extraction and achieved recoveries of 70–75%. The results of the acid leach
testwork concluded that heap leaching could be a viable processing route for the oxide material. COB proposes to conduct
leaching testwork investigating recovery of copper and additional metals including zinc, silver, gold and cobalt. The economic
reclamation of metals within the oxide layer is considered an important step to providing the Project with a near term, lower
capital intensity path to first operating cashflows.
The block flow diagram for oxide / transition mineralisation processing is shown in Figure 2.
Figure 2 – Preferred process flowsheet for oxide / transition mineralisation
Mining/
ROM Pad
Crushing
Heap Cells
Solvent
Extraction
Electrowinning
Copper Metal
Zinc Metal
a
Treatment of sulphide mineralisation via flotation
Crushed material feeds into a mill, which reduces it to a target particle size suitable for flotation. Copper is recovered via
flotation through a series of cell stages including rougher, cleaner and scavenger circuits. The copper concentrate produced
is dewatered and filtered. Tailings produced from the copper flotation circuit are transferred to the zinc flotation circuit for zinc
recovery. Zinc concentrate produced is dewatered and filtered. Tailings produced from the zinc flotation circuit are dewatered
and sent to a tailing storage facility for disposal.
Extensive flotation testwork has been conducted on the sulphide composite samples indicating concentrates can be produced
with grades of 25% and 55% for copper and zinc respectively. Metal recoveries showed a copper recovery of >90% and zinc
recovery of >80%. COB will initiate further testwork to investigate the application of modern flotation equipment to optimise
flotation performance (grade-recovery curve) and capital and operating costs.
The block flow diagram for sulphide mineralisation processing is shown in Figure 3.
MARKET UPDATE
3
Figure 3 – Preferred process flowsheet for sulphide mineralisation
Mining/
ROM Pad
Crushing
Milling
Copper
Flotation
Zinc
Flotation
Copper Concentrate
Zinc Concentrate
Tailings
The Project includes two Mineral Resources; Sandiego and Onedin (Figure 4), which have previously been reported in accordance
with the JORC Code 2012. As an indication of the proportion of each deposit potentially amenable to the two (2) processing
pathways described, the Mineral Resources are respectively summarised in Table 1 and Table 2 below by oxidation state.
Figure 4 – Sandiego and Onedin deposit locations within the broader tenement holding
0km
6km
Creek
12km
McBeath
E 80/5127
Sandiego Deposit
Onedin Deposit
E 80/4960
E 80/5087
P80/1879
E 80/5707
P80/1880
P80/1882
P80/1881
P80/1878
E 80/4957
H
E 80/5076
Imagery © Airbus CNES/Airbus Landsat/Copernicus, Maxar Technologies
MARKET UPDATE
4
Table 1 – Mineral Resource estimate for the Sandiego deposit detailed by classification.
Classification
Tonnes
(Mt)
Grade
Copper (%)
Lead (%)
Zinc (%)
Silver (g/t)
Gold (g/t)
0.7
0.1
–
0.1
0.5
0.4
1.6
1.1
85
11
5
16
0.4
0.4
0.3
0.3
Sandiego (Copper zone reported at a 0.8% copper cut-off grade)
Oxide
Transition
Sulphide (Primary)
Total
0.2
0.6
1.2
2.0
3.5
2.3
1.8
2.2
Sandiego (Zinc zone reported at a 3% zinc cut-off grade)
Oxide
Transition
Sulphide (Primary)
Total
0.4
1.0
0.7
2.1
0.5
0.8
0.3
0.6
0.9
0.7
0.4
0.7
12.5
6.0
5.9
7.3
75
30
14
34
0.1
0.2
0.1
0.1
Oxide
Transition
Sulphide (Primary)
0.7
1.6
1.9
1.5
1.4
1.3
0.9
0.5
0.2
8.4
3.8
3.2
78
23
9
0.2
0.3
0.2
Total
4.1
1.4
0.4
4.2
25
0.2
Sandiego (Total)
Note minor rounding errors may have occurred in compilation of this table.
Table 2 – Mineral Resource estimate for the Onedin deposit detailed by classification.
Classification
Tonnes
(Mt)
Grade
Copper (%)
Lead (%)
Zinc (%)
Silver (g/t)
Gold (g/t)
1.3
1.4
0.5
1.2
0.6
0.6
0.4
0.6
21
100
47
47
0.2
0.2
0.1
0.2
Onedin (Copper zone reported at a 0.4% copper cut-off grade)
Oxide
Transition
Sulphide
Sub-total
0.8
0.4
0.2
1.5
0.8
1.6
0.9
1.1
Onedin (Zinc zone reported at a 1% zinc cut-off grade)
Oxide
Transition
Sulphide
Sub-total
0.7
1.4
1.2
3.3
0.7
0.6
0.3
0.5
1.4
1.1
0.6
1.0
4.0
5.3
3.4
4.3
26
39
32
34
0.2
0.1
0.1
0.1
Oxide
Transition
Sulphide (Primary)
1.5
1.8
1.4
0.8
0.8
0.4
1.4
1.2
0.6
2.2
4.3
2.9
23
52
35
0.2
0.1
0.1
Total
4.8
0.7
1.1
3.1
38
0.1
Onedin (Total)
Note minor rounding errors may have occurred in compilation of this table.
MARKET UPDATE
5
Historical Testwork Summary
The preferred process flowsheets for each mineralisation type are based on the Review, which assessed extensive testwork
programs previously commissioned by Anglo Australian Resources NL (‘AAR’). The testwork was completed using eight (8)
composite samples derived from four (4) diamond drill holes (Table 3 and Table 4). Testwork focussed on:
a
initial acid leaching primarily targeting copper recovery, and
a
sequential sulphide flotation considering a range of conditions primarily targeting recovery of copper and zinc.
Table 3 – Composite samples from the Onedin deposit used for metallurgical testwork commissioned by AAR.
Metres
Reference Composite
Drill Hole
A
B
Onedin Oxide
ORCD45
C
D
E
F
G
Onedin Transition 1 (upper)
ORCD45
Onedin Transition 2 (lower)
ORCD45
Onedin Sulphide
ORCD45
From
Composite Head Grades
To
1.7
14.7
41.0
54.0
68.0
95.7
116.0
158.0
181.4
194.0
204.0
217.0
240.0
321.0
Cu (%)
Zn (%)
1.57
0.72
0.95
13.5
0.92
8.02
0.97
4.44
Table 4 – Composite samples from the Sandiego deposit used for metallurgical testwork commissioned by AAR.
Metres
Reference Composite
H
I
J
Sandiego Transition
Sandiego Sulphide Copper
Composite Head Grades
Drill Hole
From
To
Cu (%)
Zn (%)
SRCD24
184.3
201.0
0.53
10.1
SRCD21
305.0
339.6
SRCD22
378.0
414.0
1.39
0.33
K
Sandiego Sulphide Zinc
SRCD21
282.5
305.0
0.10
5.59
L
Sandiego Sulphide Copper / Zinc
SRCD24
201.0
223.6
0.23
11.86
MARKET UPDATE
6
Figure 5 – O
nedin deposit plan illustrating drilling intervals used for metallurgical composites.
The extent of oxide, transition and sulphide mineralised domains are shown at 400mRL,
300mRl and 200mRL respectively (approximately 50m, 150m and 250m below surface).
MARKET UPDATE
7
Figure 6 – Onedin deposit long section illustrating drilling intervals used for metallurgical composites
MARKET UPDATE
8
Figure 7 – S
andiego deposit plan illustrating drilling intervals used for metallurgical composites.
The extent of transition and sulphide mineralised domains are shown at 100mRL
(approximately 320m below surface).
MARKET UPDATE
9
Figure 8 – S
andiego deposit cross section illustrating drilling intervals used for metallurgical composites
MARKET UPDATE
10
As outlined, further metallurgical testwork is proposed to:
a
investigate recovery of other metals including zinc, silver, gold and cobalt from oxide-transition material, and
a
optimise overall recoveries considering the latest processing technology.
This testwork will follow detailed geometallurgical characterisation to inform future resource domaining having regard to the
preferred flowsheets.
Mining Factors
Economic evaluations undertaken by previous owners and partners have incorporated mining studies contemplating:
a
Open cut mining of the Onedin deposit; and/or
a
Combined open cut and underground mining of the Sandiego deposit (long hole open stoping)
COB intends to complete the Study considering development of both the Onedin and Sandiego deposits through a combination
of open cut and underground mining. Mine scheduling will nominally evaluate a proposed process plant with a feed capacity of
700–800ktpa.
Key optimisation parameters will be informed by the recent Review. With reference to the preferred process flowsheets described
herein, the Company will complete a revision of capital (‘CAPEX’) and operating expenditure (‘OPEX’) estimates for both mining
and processing.
The Company will also undertake an updated market assessment considering the proposed product suite including copper / zinc
concentrates (derived from proposed sulphide feed) and copper / zinc metal (derived from proposed oxide feed). The assessment
will inform key potential commercial factors (payabilities, penalties etc.) and provide the basis for pricing inputs noting the most
recent mining study undertaken by previous owners and partners considered a price of A$15,855/t copper and A$4,189/t zinc
compared with current prices around A$17,000/t copper and A$4,600/t zinc.
Growth Potential
COB is also actively identifying potential opportunities to expand the resource base, thus potentially enlarging the Project’s size and/
or operating life. Geological modelling undertaken by the previous owners in support of the Sandiego and Onedin Mineral Resource
estimates1 has substantially improved the understanding of structural controls on mineralisation. This insight reveals strong potential
for high-grade extensions or repetitions within favourable host rocks and structures near the main deposits and across the broader
tenement area
Halls Creek Background
Halls Creek is located in the Kimberley region of Western Australia; a mature mining jurisdiction with a significant record of
resource production including iron ore, mineral sands, rare earths, nickel, copper, cobalt and gold (Figure 7). Located 15 km
southwest of the town of Halls Creek (pop. ~3,500), the project comprises two significant deposits, Sandiego and Onedin.
The deposits are directly adjacent to the Great Northern Highway which connects the Project to Kununurra and Wyndham Port,
respectively some 300 km and 320 km north. Wyndham Port is the only deep-water port between Broome and Darwin servicing
exports including crude oil, live cattle, raw mined products, scrap metal and maize from across Northern Australia and produce
from the Ord River irrigation area.
1
The Mineral Resource estimates were independently prepared by ERM Australia Consultants Pty Ltd (formerly CSA Global) and were released to the ASX
by COB on 18 February 2025 in the announcement ‘COB Diversifies – Major Copper Project Earn In’
MARKET UPDATE
11
Figure
9 – Halls
Project –300km
regional location
0km
100kmCreek200km
100km
200km
300km
TIMOR
SEA
Kununurra
Wyndham Port
Argyle
Diamond Mine
Derby
Darwin
Savannah
Nickel-Copper
-Cobalt Mine
N O
NT
Gold Mine
QLD
Brisbane
WA
Fitzroy Crossing
SA
Perth
Browns Range
Rare Earths
Project
Halls Creek
Project
NSW
Sydney
Adelaide
Melbourne
Imagery © 2025 TerraMetrics
NORTHERN TERRITORY
0km
Halls Creek is inclusive of two existing Mineral Resources including:
a
Sandiego – 4.1Mt at 1.4% Cu, 0.4% Pb, 4.2% Zn and 25g/t Ag for 56kt contained copper, 18kt lead, 175kt zinc and 3.3Moz silver.
a
Onedin – 4.8Mt at 0.7% Cu, 1.1% Pb, 3.1% Zn and 38g/t Ag for 33kt contained copper, 51kt lead, 151kt zinc and 5.9Moz silver.
The Mineral Resource estimates were independently prepared by ERM Australia Consultants Pty Ltd (formerly CSA Global) and were
originally released to the ASX by COB on 18 February 2025 in the announcement ‘COB Diversifies – Major Copper Project Earn In’.
Table 5 – Mineral Resource estimate for the Sandiego deposit detailed by classification.
Grade
Classification
Tonnes
(Mt)
Copper
(%)
Lead
(%)
Zinc
(%)
Contained Metal
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Lead
(kt)
Zinc
(kt)
Silver
(Moz)
Gold
(Koz)
18
5
16
0.3
0.2
0.3
39.1
4.8
43.9
3.4
–
3.4
13.6
9.0
22.6
0.98
0.05
1.03
16.4
1.9
18.3
Sandiego (Copper zone reported at a 0.8% copper cut-off grade)
Indicated
Inferred
Sub-total
1.7
0.3
2.0
2.3
1.6
2.2
0.2
–
0.1
0.8
3.0
1.1
Sandiego (Zinc zone reported at a 3% zinc cut-off grade)
Indicated
Inferred
Sub-total
2.0
0.1
2.1
0.6
0.2
0.6
0.7
0.1
0.7
7.3
6.1
7.3
35
10
34
0.1
0.1
0.1
12.0
0.2
12.2
14.0
0.1
14.1
146.0
6.1
152.1
2.25
0.03
2.28
6.4
0.3
6.7
Indicated
Inferred
3.7
0.4
1.4
1.3
0.5
0.0
4.3
3.8
27
6
0.2
0.2
51.1
5.0
17.4
0.1
159.6
15.1
3.23
0.08
22.8
2.2
Total
4.1
1.4
0.4
4.2
25
0.2
56.1
17.5
174.7
3.31
25.0
Total
Note minor rounding errors may have occurred in compilation of this table.
MARKET UPDATE
12
Table 6 – Mineral Resource estimate for the Onedin deposit detailed by classification.
Grade
Classification
Tonnes
(Mt)
Copper
(%)
Lead
(%)
Zinc
(%)
Contained Metal
Silver
(g/t)
Gold
(g/t)
Copper
(kt)
Lead
(kt)
Zinc
(kt)
Silver
(Moz)
Gold
(Koz)
47
0.2
16.5
18.0
9.0
2.27
9.7
Onedin (Copper zone reported at a 0.4% copper cut-off grade)
Indicated
1.5
1.1
1.2
0.6
Onedin (Zinc zone reported at a 1% zinc cut-off grade)
Indicated
3.3
0.5
1.0
4.3
34
0.1
16.5
33.0
141.9
3.61
10.6
Total
4.8
0.7
1.1
3.1
38
0.1
33.0
51.0
150.9
5.88
20.3
Note minor rounding errors may have occurred in compilation of this table.
Kwinana Refinery Update
COB and Iwatani are progressing towards a financing decision for the Refinery. Focus remains on the following activities:
a
80% of the detailed plant engineering has been completed with Tetratech.
a
A works approval permit application is being assessed by the Department of Water and Environmental Regulation (West
Australian Government). The public consultation period for the Works Approval permit has recently closed.
a
Offtake negotiations continue. Under ‘commercial-in-confidence’ agreements, samples of cobalt sulphate are being generated
on request at the Broken Hill Technology Centre.
a
COB is engaging closely with export credit agencies, commercial banks and potential investors on funding options.
As part of the collaborative relationship, Iwatani visited the Broken Hill Technology Centre in March for a technical workshop.
Figure 10 – Iwatani visit to Broken Hill Technology Centre
MARKET UPDATE
13
Competent Person’s Statements
Exploration Results
The information in this report that relates to Exploration Results is based on information compiled by Mr Heath Porteous, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Porteous is employed
by Xploremore Pty Ltd and engaged on a full-time basis by the Group as Exploration Manager. Mr Porteous has had sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of Exploration Results,
Minerals Resources and Ore Reserves (2012 JORC Code). Mr Porteous consents to the inclusion in the report of the matters based
on his information in the form and context in which it appears.
Mineral Resources
The information in this announcement that relates to Mineral Resources was reported in the Company’s ASX announcement ‘COB
Diversifies – Major Copper Project Earn In’ dated 18 February 2025. The Company confirms that it is not aware of any new information or data that materially affects the information included in that announcement and that all material assumptions and technical
parameters underpinning the estimates in that announcement continue to apply and have not materially changed.
Cobalt Blue Background
Cobalt Blue Holdings Limited is a mining and mineral processing company focussed on the development of a Cobalt-Nickel Refinery
in Western Australia, the Halls Creek Project in Western Australia, the Broken Hill Cobalt Project in New South Wales and ReMine+
globally (with a view to global opportunities contained in mine waste). As announced on 18 February 2025, the Company intends to
seek shareholder approval to change its name to Core Blue Minerals Limited.
Forward Looking Statements
This announcement contains “forward-looking statements”. All statements other than those of historical facts included in this
announcement are forward-looking statements. Where the Company expresses or implies an expectation or belief as to future
events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward
looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from
future results expressed, projected or implied by such forward-looking statements. Such risks include but are not limited to
commodity price volatility, timely completion of project milestones, funding availability, government and other third-party approvals.
Readers should not place undue reliance on forward-looking statements. The Company does not undertake any obligation to
release publicly any revisions to any “forward-looking statement”, unless required by applicable law.
This announcement was authorised for release to the ASX by the board of Cobalt Blue Holdings Limited.
For further information, please contact:
Joe Kaderavek
Chief Executive Officer
Cobalt Blue Holdings
P: (02) 8287 0660
info@cobaltblueholdings.com
MARKET UPDATE
14
JORC Code 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
Sampling
techniques
a Nature and quality of sampling (e.g.,
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down hole gamma sondes,
or handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
a Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
a Aspects of the determination of
mineralisation that are Material to the
Public Report.
a In cases where ‘industry standard’
work has been done this would
be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain
1 m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(e.g., submarine nodules) may warrant
disclosure of detailed information.
Sandiego – Diamond Drilling
1995–1996
a
Diamond drilling was used to obtain core from which intervals averaging 1m in length were sawn to produce samples (typically quarter
(25%) core). These samples were crushed, split and pulverised for
analysis via atomic absorption spectroscopy (‘AAS’) reporting a
limited and variable suite of elements (nominally Cu, Pb, Zn and Ag).
Au was variably analysed by fire assay. Details of sub-sampling, lab
preparation and digestion techniques are not recorded.
2006–2011
a
Diamond drilling was used to obtain core from which intervals
averaging 1m in length were sawn to produce quarter (25%) core
or half (50%) core samples from HQ or NQ core respectively. These
samples were crushed, split and pulverised to produce a sample
for mixed-acid digestion and analysis via Inductively Coupled
Plasma – Mass Spectrometry (‘ICP-MS’) or Inductively Coupled
Plasma – Optical Emission Spectroscopy (‘ICP-OES’) reporting a
variable suite of elements. Au was typically analysed by fire assay
using a 40 - 50g charge with an AAS finish. Details of sub-sampling
and lab preparation techniques are not recorded.
2021
a
Diamond drilling was used to obtain core from which intervals
averaging 0.95m in length were sawn to produce half (50%) core
samples. These samples were crushed passing -10mm, riffle split
and pulverised to produce a sample for mixed-acid digestion and
analysis via ICP-OES for a suite of 39 elements. Au was analysed by
fire assay using a 30g charge with an AAS finish.
a
The remaining core was retained for archival purposes or
metallurgical testwork.
Sandiego – RC Drilling
1995–1996
a
RC drilling was used to obtain 1m samples by means of a riffle
splitter which were composited into 4m intervals for analysis via AAS
reporting a limited suite of elements (nominally Cu, Pb, Zn and Ag).
Au was variably analysed by fire assay. Composite samples returning
Cu, Pb or Zn >1%, and or Au >1g/t were typically re-assayed at
1m intervals. Details of sample compositing, sub-sampling and lab
preparation techniques are not recorded.
2006–2008
a
RC drilling was used to obtain 4m composite samples by means of a
sample ‘spear’. These samples were crushed, split and pulverised to
produce a sample for mixed-acid digestion and analysis via ICP-MS
or ICP-OES reporting a variable suite of elements. Au was typically
analysed by fire assay using a 40 - 50g charge with an AAS finish.
Details of sub-sampling and lab preparation techniques are not
recorded.
2010–2011
a
RC drilling was used to obtain 1m samples by means of a cone
splitter. These samples were crushed, split and pulverised to
produce a sample for mixed-acid digestion and analysis via ICP-OES
reporting a variable suite of elements. Au was typically analysed by
fire assay using a 50g charge with an AAS finish. Details of sub-sampling and lab preparation techniques are not recorded.
MARKET UPDATE
15
Criteria
Sampling
techniques
(continued)
JORC Code Explanation
Commentary
2021
a RC drilling was used to obtain 1m samples by means of a cone
splitter from which up to 3.5kg was pulverised to produce a
sample for mixed-acid digestion and analysis via ICP-OES for a
suite of 39 elements. Au was analysed by fire assay using a 30g
charge with an AAS finish.
a
Unmineralised zones were infrequently composited into 4m intervals
for analysis as described above.
Onedin – Diamond Drilling
1995–1996
a Diamond drilling was used to obtain core from which intervals averaging 1m in length were sawn to produce samples (typically quarter
(25%) core). These samples were crushed, split and pulverised for
analysis via atomic absorption spectroscopy (‘AAS’) reporting a
limited and variable suite of elements (nominally Cu, Pb, Zn and Ag).
Au was variably analysed by fire assay. Details of sub-sampling, lab
preparation and digestion techniques are not recorded.
2006–2008
a Diamond drilling was used to obtain core from which intervals
averaging 1m in length were sawn to produce quarter (25%) core
or half (50%) core samples from HQ or NQ core respectively. These
samples were crushed, split and pulverised to produce a sample
for mixed-acid digestion and analysis via ICP-MS or ICP-OES
reporting a variable suite of elements. Au was typically analysed by
fire assay using a 40 - 50g charge with an AAS finish. Details
of sub-sampling and lab preparation techniques are not recorded.
2021
a Diamond drilling was used to obtain core from which intervals
averaging 0.96m in length were sawn to produce quarter (25%)
core or half (50%) core samples from PQ3 / HQ3 or HQ core
respectively. These samples were crushed passing -10mm, riffle
split and pulverised to produce a sample for mixed-acid digestion
and analysis via ICP-OES for a suite of 39 elements. Au wa
Share your feedback