Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL FINANCIAL REPORT
For the year ended 31 December 2025
AuKing Mining Limited
ABN 29 070 859 522
ASX Code: AKN
AuKing Mining Limited
2025 Annual Report
Page 2
Corporate Directory
AuKing Mining Limited
Board of Directors
Mr Peter Tighe (Non-Executive Chair)
Mr Paul Williams (Managing Director)
Mr Lincoln Ho (Non-Executive Director)
Company Secretary
Mr Paul Marshall
Head Office and Registered Office
Suite 34, Level 10
320 Adelaide Street
Brisbane QLD 4000
Telephone: 07 3535 1208
Email: admin@aukingmining.com
Website: www.aukingmining.com
Auditors
BDO Audit Pty Ltd
Level 18, 360 Queen St
Brisbane QLD 4000
Telephone: 07 3237 5999
Website: www.bdo.com.au
Share Registry
Automic Group
Level 12
530 Collins Street
Melbourne VIC 3000
Telephone: 1300 288 664 | +61 2 9698 5414
Facsimile: 02 9287 0303
Website: www.automic.com.au
Stock Exchange Listing
Australian Securities Exchange
ASX Code: AKN
Australian Business Number
29 070 859 522
AuKing Mining Limited
2025 Annual Report
Page 3
CONTENTS
Directors’ Report
Review of Operations 4
Directors and Officers 11
Financial Results 13
Future Developments, Prospects, Strategies and Business Risks 17
Remuneration Report 18
Auditor's Independence Declaration 26
Additional Stock Exchange Information 27
Annual Financial Report
Consolidated Statement of Comprehensive Income 31
Consolidated Balance Sheet 32
Consolidated Statement of Changes in Equity 33
Consolidated Cash Flow Statement 34
Notes to the Consolidated Financial Statements 35
Consolidated Entity Disclosure Statement 63
Directors’ Declaration 64
Independent Auditor’s Report 65
AuKing Mining Limited
2025 Annual Report
Page 4
REVIEW OF OPERATIONS
Orion Resources – Cloncurry Gold Project
During the course of 2025, the Company provided details of its proposed acquisition of Orion Resources Pty Ltd (“Orion”).
Orion had previously entered into an asset sale agreement (“ASA”) to acquire the existing Lorena processing plant and
associated facilities, situated approximately 15 kms east of Cloncurry in northern Queensland, together with various
exploration and mining tenements in that area. The Lorena plant is a conventional carbon in leach gold processing facility.
In addition, Orion also acquired under the ASA additional exploration and mining tenements approx. 30kms to the south
of the Lorena plant, described as the “Mt Freda/Golden Mile Project”. The overall tenure package being acquired by Orion
covered an area of 447km2 in the Cloncurry Region.
On 6 November 2025, the Company advised that ASX had made a determination that ASX Listing Rules 11.1.2 and
11.1.3 would apply to the transaction whereby AuKing was proposing to acquire all of the issued shares and securities in
Orion for a purchase price of A$16.2M. As a consequence, AuKing determined not to proceed with the Orion acquisition
on those terms.
The Company announced on 21 October 2025 that it had been advised by Orion that financial close of its acquisition of
the Cloncurry Gold Project assets had been scheduled to occur on Monday, 3 November 2025. Advice was later received
from Orion that on the afternoon of 3 November 2025, Orion was unable to complete its sale obligations due to an
outstanding condition precedent required from the vendors to release existing security on part of the assets being
acquired by Orion.
The Company has since provided a further update to ASX on 13 January 2026 (and clarified in a release dated 15 January
2026) that Orion has now filed and served a Supreme Court Writ and Statement of Claim in Western Australia seeking
orders for specific performance and damages in relation to the Cloncurry Project asset sale contract that failed to complete
on 3 November 2025 (as detailed above). The defendants to this action include the Receivers and Liquidators who were
parties to the asset sale contract and the firm who is now in effective control of the assets. The Company is not a party
to any of these legal proceedings.
Tanzania
The primary focus of activities of the Company with its Tanzanian project interests is the Mkuju uranium project in southern
Tanzania. No exploration was conducted by the Company at Mkuju during 2025 due to a lack of available funds. With
strong market interest persisting in uranium projects the Company intends to carry out further uranium exploration during
the course of 2026, as and when available funding allows.
The Company’s proposed sale of its Manyoni prospecting licenses to ASX-listed Moab Minerals Limited (“MOM”) (and its
Tanzanian subsidiary Katika Resources Limited (“Katika”)) continued to be delayed due to regulatory approvals and
conditions associated with those approvals. In February 2026 the Company and Moab were able to finalise these
outstanding regulatory approvals associated with the transfer of these Manyoni licences and the transaction should be
closing shortly.
In addition to the share placement announced by the Company on 5 February 2025, Beijing Gage Capital Management
C., Ltd (via its subsidiary in Tanzania) acquired two of AuKing’s non-core Prospecting Licenses in the Mkuju region of
southern Tanzania. The sale was completed in the June 2025 Quarter.
Koongie Park Project
On 18 February 2025, the Company announced that it had entered into a joint venture earn-in agreement with ASX-listed
Cobalt Blue Holdings Limited (“COB”). A summary of the key terms of the agreement that was reached with COB includes
the following:
Stage 1
➢ COB acquired a 51% beneficial interest in the Project by issuing AuKing with A$200k of COB shares (at an issue
price of $0.072);
➢ To retain the 51% beneficial interest COB must meet a minimum expenditure of A$500k by 30 June 2027;
➢ If COB does not meet this Stage 1 expenditure, AuKing can buy back a 2% interest (and return to a 51% interest)
by reimbursing COB 2% of the amount of expenditure incurred by COB on the Project.
AuKing Mining Limited
2025 Annual Report
Page 5
Stage 2
➢ COB will then have the right (but not the obligation) to earn up to a 75% interest (an additional 24%) in the Project
by incurring an additional A$1.5M expenditure on the tenements by 30 June 2028;
➢ If COB does not meet this Stage 2 expenditure, AuKing can buy back a 2% interest (and return to a 51% interest)
by reimbursing COB 2% of the amount of expenditure incurred by COB on the Project; and
➢ Should AuKing’s future JV interest dilute below 10% the interest shall revert to a 1% Net Smelter Royalty (‘NSR’).
During the course of 2025, COB proceeded to sole fund joint venture activities at Koongie Park, and a summary of the
primary activities is set out below.
On 6 June 2025, COB announced the results of a Scoping Study that they had completed in relation to the Koongie Park
Project. The COB Scoping Study established the following life of project financial parameters (on a 100% project basis):
➢ Pre-tax NPV8 (real) – A$172M
➢ Post-tax NPV8 (real) – A$121M
➢ Pre-tax Internal Rate of Return – 28%
➢ Post-tax Internal Rate of Return – 21.4%
On 4 August 2025 COB announced a further uplift in project activities at Koongie Park featuring the following activities:
Engineering Review Targets Expansion
Multiple value engineering opportunities are being progressed to build on the strong economics delivered in the June
2025 Scoping Study (the ‘Scoping Study’):
➢ Silver recovery presents a substantial opportunity to boost Stage 1 margins.
➢ Cobalt at Sandiego occurs with high-grade copper-zinc zones—inclusion of cobalt in future Mineral Resource
estimates could provide a valuable byproduct credit, enhancing Stage 2 cost competitiveness.
➢ A centralised processing hub is under review to integrate satellite deposits into the development plan aiming to
extend life-of-mine, increase throughput, and lower unit capital intensity.
Sandiego North Emerges as a High-Impact Discovery Target
➢ Defined by a 700 m copper-in-soil anomaly with multiple samples exceeding 200 ppm Cu.
➢ Drill hole ASWB01 intersected 5 m at 1.37% Cu and 2m at 1.71% Cu, confirming copper mineralisation north of
the existing resource.
➢ Deep drilling at Sandiego shows mineralisation trending toward Sandiego North, with high-grade results remaining
open along strike.
➢ Represents a priority target for near-term resource growth.
Canada – Myoff Creek
During the December 2025 Quarter, the Company announced the final results of an airborne survey conducted over the
entire Myoff Creek tenure package. Highlights of the results included:
➢ Airborne survey: A helicopter-borne high resolution aeromagnetic and radiometric survey covering 70-line kms
was flown across the Myoff Creek tenure area and the final results of the survey are being collated for formal
reporting purposes.
➢ Carbonatite mineralization confirmed: Preliminary results are consistent with previously interpreted and drilled
near-surface carbonatite mineralization in the northern area of the project area which contained notable intercepts
of niobium and total rare earth oxides. (See ASX release by AuKing dated 22 July 2024).
➢ Potential carbonatite extension: The survey has highlighted previously untested anomalous areas of additional
carbonatite mineralization in the central and southern areas of the Myoff Creek project area, providing potential
extensions of carbonatite mineralisation and creating fresh exploration targets for follow-up.
The Company is currently in discussions with a group of investors that may acquire Myoff Creek as the project is not
considered within the Board’s current strategic focus.
AuKing Mining Limited
2025 Annual Report
Page 6
Canada – Grand Codroy
No exploration was conducted at the Grand Codroy project during 2025. In January 2026, the Company took steps to
have this mining claim surrendered as it was determined that this project was no longer consistent with the Board’s current
strategic focus.
Saudi Arabia
The Company completed arrangements with Resource Mining Corporation Limited (ASX:RMI) during the September
2025 Quarter, whereby RMI acquired all of the Company’s interests in this Saudi JV. As a consequence, the Company
has no further interest in this Saudi JV or that jurisdiction generally.
Tasmania Tin
On 29 January 2026, the Company announced it had entered into a agreement to acquire all the shares in Australian-
registered company Goldtrace Exploration Pty Ltd (Goldtrace). Goldtrace owns 100% of the two EL applications 22/2025
and 23/2025. Strategically located in north-western Tasmania near the historical mining town of Rosebery, the EL
applications proposed to be acquired by AuKing are situated in a region that is host to the world class Renison Bell
(Metals X/Yunnan Tin JV) operating tin mine (approximately 292,000t of contained Sn) and the undeveloped Mt Lindsay
tin project of Critica Ltd (formerly Venture Minerals Ltd) which comprises around 81,000t Sn and 32,000t of WO3.
In consideration for the acquisition of all the shares in Goldtrace, the Company is obliged to issue 142,857,143 new
AuKing shares at an issue price of 0.35c per share (comprising a $500,000 purchase price) to the existing Goldtrace
shareholders and their nominees, subject to the Company obtaining approval from shareholders at an extraordinary
general meeting which was obtained on 10 March 2026.
Exploration activities will commence on the EL areas, upon their formal grant by Mineral Resources Tasmania expected
within the next 2-3 months.
Other Development Opportunities
The Board continues to assess project acquisition and development opportunities that are consistent with the current
strategic focus of developing high-potential exploration projects in the critical minerals, precious metals and uranium
sectors.
Corporate Activities
Capital Raising
During the year, the Company completed the following share placements and capital raising activities:
• In late 2024, the Company announced that there existed a substantial shortfall under the Company’s rights issue
entitlement offer to existing shareholders. On 27 November 2024 the Company announced that agreement had
been reached with Benwest Investment Services Pty Ltd to subscribe for the Entitlement Offer shortfall by way of
a placement to investors on the same terms as were offered under the Entitlement Offer. During 2025, an
additional $670,000 in funds were raised through the issue of a further 95,714,286 New Shares.
• On 5 February 2025, AuKing announced details of a strategic collaboration with Gage Resources Pty Ltd, an
Australian subsidiary of Beijing Gage Capital Management Co., Ltd (“Gage Capital”). Under this collaboration,
Gage Capital agreed to subscribe for 60 million new shares in the Company at an issue price of $0.005, raising
an additional $300,000 for the Company’s working capital purposes.
• On 2 July 2025, AuKing announced that it had received binding commitments for a placement to professional and
sophisticated investors (including Directors) comprising 196,228,333 new fully paid ordinary shares in the
Company at an issue price of $0.006 per share (“Placement Shares”) together with free-attaching options to raise
A$1.17M (before issue costs). The Placement occurred in two tranches:
o Tranche 1 Placement – the Company issued 113,337,550 new shares at an issue price of $0.006 per share
raising a total of $680,025 before costs; and
o Tranche 2 Placement –the Company issued an additional 82,880,159 new shares at an issue price of
$0.006 per share, raising an additional $497,281 before costs. This includes Director participation of
approximately $150,000.
• The July 2025 Placement also included the offer of the following free attaching options:
o One option for every one Placement Share issued (being a total of 196,228,333 options) with an exercise
price of $0.006 and expiring on 31 December 2026 (“$0.006 Options”); and
AuKing Mining Limited
2025 Annual Report
Page 7
o One option for every two Placement Share issued (being a total of 98,114,167 options) with an exercise
price of $0.03 and expiring on 30 April 2027 (“0.03 Options”).
• Peak Asset Management and Spark Plus acted as Joint Lead Managers to the Placement (“the JLMs”) and were
remunerated as follows:
o A capital raising fee of 4% on all funds raised under the Placement by the JLMs - payable to the JLMs on
a pro-rata basis;
o A management fee of 2% on all funds raised under the Placement – split 50/50 between JLMs; and
o A total of 58,868,500 $0.006 Options and 29,434,250 $0.03 Options – split 50/50 between the JLMs.
• On 24 November 2025, AuKing announced that it had received binding commitments for a placement to
professional and sophisticated investors and clients of GBA Capital Pty Ltd comprising 80,000,000 new fully paid
ordinary shares in the Company at an issue price of $0.005 per share (“Placement Shares”) together with free-
attaching options to raise A$400,000 (before issue costs).
The Placement also included the offer, subject to obtaining shareholder approval (which was obtained at the
shareholder meeting on 8 January 2026), of free-attaching options (“Placement Options”) to be issued on the
basis of one option for every two Placement Shares issued (being a total of 40,000,000 options) with an exercise
price of $0.006 and expiring on 31 December 2026 (“$0.006 Options”).
GBA Capital acted as the Lead Manager to the Placement and was remunerated as follows:
o A capital raising fee of 6% on all funds raised under the Placement; and
o A total of 10,000,000 $0.006 Options to be issued subject to AuKing shareholder approval.
Other Funding Arrangements
GAM Short Term Loan
On 31 March 2025 the Company entered into a short-term $420,000 loan with GAM Company Pty Ltd that was
subsequently extended to a total loan of $657,000 which was intended to be repayable from a capital raising proposed
at the time that GBA Capital Pty Ltd was arranging in April 2025. All outstanding loan monies and interest in respect of
the GAM loan were repaid in full by the Company in September 2025.
RiverFort Facility
On 8 September 2025, the Company entered into a $5,000,000 loan facility with RiverFort Global Capital Ltd.
Key Terms RiverFort Loan
Total available loan facility $5,000,000
Interest rate 10.00% per annum
Drawdowns
$500,000 is immediately available for the first drawdown. The remaining facility will
be available in two tranches.
The second trance of $2,500,000 will be available to fund the Orion project and the
third tranche of $2,000,000 at a later time to further fund development of the Orion
project.
The second and third tranches are subject to mutual agreement between RiverFort
Global Capital Ltd and the Company.
Drawdown Fee
At the discretion of the Company, either:
• 4.5% of each relevant Drawdown paid in cash and deducted from gross
proceeds of each Drawdown, or;
• 5.5% paid in shares at the 5 day VWAP preceding the relevant drawdown.
Facility term and repayments
• Overall facility term of 3 years
• Each drawdown is to be repaid 12 months from the drawdown date
AuKing Mining Limited
2025 Annual Report
Page 8
Security
First Ranking Security over Auking Mining Limited but subject to being subordinated
to the proposed Nebari senior secured facility.
RiverFort Shares
AKN shall issue A$100,000 of Pre-Issued Shares to RiverFort Global Capital Ltd on
the date of the First Drawdown.
RiverFort Options
RiverFort Global Capital Ltd shall receive Options (in the Investor’s standard form)
equal to 40% (or a 2:5 ratio) of each Drawdown divided by the Reference Price,
exercisable at a 50% premium to the relevant Reference Price. Each issuance of
Options will have a 36-month term from the date of issuance. The Options
associated with the First Drawdown will have an exercise price at a 50% premium
to the Equity Placing share price.
Fixed Placing Price
The RiverFort Global Capital Ltd may from time to time and in varying amounts
convert outstanding Principal and Interest at a 50% premium to the Reference Price
of each Drawdown at any time during the Term.
For the First Drawdown, the Fixed Placing Price will be at a 50% premium to the
Equity Placing price.
If there is any issuance of equity at a share price which is below the Fixed Placing
Price during the Term, the Fixed Placing Price will be revised to be the same as the
relevant placing price of the issuance of equity.
The first tranche of $500,000 was drawdown by the Company on 10 September 2025.
Tighe Short Term Loan
During the March 2025 Quarter, the Company and its Chairman, Mr Peter Tighe, agreed to further extend repayment of
the A$750,000 loan to be repaid by the Company until 31 March 2026, with interest payments to continue to be paid on
the same terms. The loan was reduced to A$650,000 in August 2025 when Mr Tighe agreed to offset $100,000 towards
the funds he contributed to the Company’s Tranche 2 share placement at that time.
Board Changes
In April 2025, Mr Lincoln Ho joined the Board as a non-executive director. In early 2026, certain further changes occurred
to the AuKing Board of Directors whereby Mr Mark Fisher, Dr Kylie Prendergast and Mr Nick Harding all resigned from
their positions, with immediate effect.
Governance Arrangements and Internal Controls
AuKing has ensured that the Mineral Resources quoted are subject to good governance arrangements and internal
controls. The Mineral Resources reported have been generated by suitably qualified personnel who are experienced in
best practices in modelling and estimation methods, and AuKing has also undertaken reviews of the quality and suitability
of the underlying information used to determine the resource estimate.
Annual Review Competent Persons Statement
The information in this Annual Report that relates to the mineral resources and ore reserves statement as a whole has
been reviewed and approved by Mr Ian Hodkinson who is a member of the Australian Institute of Geoscientists. Mr
Hodkinson is a consultant to AuKing Mining Limited and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Hodkinson consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Competent Persons’ Statements
The information relating to Exploration Results as outlined in this Annual Report are extracted from previous ASX
announcements made by the Company. These reports are available to view on the Company’s website
www.aukingmining.com. This report was issued in accordance with the 2012 Edition of the JORC Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original market announcement. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcements.
AuKing Mining Limited
2025 Annual Report
Page 9
Annual Mineral Resource Statement
In accordance with ASX Listing Rule 5.21, the Company reviews and reports its Mineral Resources at least annually. The
date of reporting is 31 December each year, to coincide with the Company’s end of financial year balance date. If there
are any material changes to its Mineral Resources over the course of the year, the Company is required to promptly
report these changes.
The Company has not reported any changes to its Mineral Resources during the 2025 calendar year. The current reported
JORC 2012 resource estimate for the Koongie Park project (Sandiego and Onedin) is 8.9Mt @ 1.01% Cu, 3.67% Zn,
0.16g/t Au, 32g/t Ag and 0.77% Pb, details of which are set out below:
Onedin Mineral Resource Estimate and Metal Tonnes
Zone Classification
Tonnes
(Mt)
Copper
(%)
Zinc (%)
Gold
(g/t)
Silver
(g/t)
Lead (%)
Cu
Dominant
Indicated 1.5 1.1 0.6 0.2 47 1.2
Inferred - - - - - -
Zn
Dominant
Indicated 3.3 0.5 4.3 0.1 34 1.0
Inferred - - - - - -
Resource Total and Grades 4.8 0.7 3.2 0.1 38 1.1
Zone Classification
Tonnes
(Mt)
Copper
(tonnes)
Zinc
(tonnes)
Gold
(oz)
Silver
(Moz)
Lead (tonnes)
Cu
Dominant
Indicated 1.5 16,500 9,000 9,600 2.27 18,000
Inferred - - - - - -
Zn
Dominant
Indicated 3.3 16,500 141,900 10,600 3.61 33,000
Inferred - - - - - -
Total Metal Tonnes 33,000 150,900 20,200 5.88 51,000
Note: (1) Reported tonnes and grade are rounded
(2) Reporting cut-off grades of 0.4% Cu and 1% Zn have been applied to the Onedin deposit
Sandiego Mineral Resource Estimate and Metal Tonnes
Classification
Tonnes
(Mt)
Copper
(%)
Zinc (%)
Gold
(g/t)
Silver
(g/t)
Lead (%)
Cu
Dominant
Indicated 1.7 2.3 0.8 0.3 18 0.2
Inferred 0.3 1.6 3.0 0.2 5 0.0
Sub Total 2.0 2.2 1.1 0.3 16 0.1
Zn
Dominant
Indicated 2.0 0.6 7.3 0.1 35 0.7
Inferred 0.1 0.2 6.1 0.1 10 0.1
Sub Total 2.1 0.6 7.3 0.1 34 0.7
Resource Total and Grades 4.1 1.4 4.3 0.2 25 0.4
Classification
Tonnes
(Mt)
Copper
(tonnes)
Zinc
(tonnes)
Gold
(oz)
Silver
(Moz)
Lead (tonnes)
Cu
Dominant
Indicated 1.7 39,100 13,600 16,400 0.98 3,400
Inferred 0.3 4,800 9,000 1,900 0.05 0
Sub Total 2.0 43,900 22,600 18,300 1.03 3,400
Zn
Dominant
Indicated 2.0 12,000 146,000 6,400 2.25 14,000
Inferred 0.1 200 6,100 300 0.03 100
Sub Total 2.1 12,200 152,100 6,700 2.28 14,100
Total Metal Tonnes 56,100 174,700 25,000 3.31 17,500
Note: (1) Reported tonnes and grade are rounded
(2) Reporting cut-off grades of 0.8% Cu and 3% Zn have been applied to the Sandiego deposit
AuKing Mining Limited
2025 Annual Report
Page 10
The current reported JORC 2012 resource estimate for the Koongie Park project (Emull) is 12.2Mt @ 0.27% Cu, 0.38%
Zn, 0.09% Pb, and 4.9g/t Ag, details of which are set out below:
Emull Mineral Resource Estimate and Metal Tonnes
December 2022 Mineral Resource Estimate (0.15% Cu Cut-off)
Indicated Mineral Resource
Type Tonnage Cu Zn Pb Ag Cu Zn Pb Ag
Mt % % % g/t t t t koz
Oxide 0.26 0.28 0.72 0.16 5.4 700 1,800 400 50
Transitional 0.34 0.29 0.68 0.17 7.0 1,000 2,300 600 80
Fresh 1.8 0.31 0.57 0.14 6.6 5,600 10,400 2,400 390
Total 2.4 0.30 0.60 0.14 6.6 7,300 14,500 3,400 510
Inferred Mineral Resource
Type Tonnage Cu Zn Pb Ag Cu Zn Pb Ag
Mt % % % g/t t t t koz
Oxide 0.04 0.24 0.23 0.05 3.1 100 100
Transitional 0.05 0.25 0.18 0.04 3.4 100 100 10
Fresh 9.7 0.26 0.33 0.08 4.6 25,200 32,300 7,400 1,420
Total 9.8 0.26 0.33 0.08 4.5 25,400 32,500 7,400 1,430
Total Mineral Resource
Type Tonnage Cu Zn Pb Ag Cu Zn Pb Ag
Mt % % % g/t t t t koz
Oxide 0.29 0.28 0.66 0.14 5.2 800 1,900 400 50
Transitional 0.39 0.28 0.61 0.15 6.6 1,100 2,400 600 80
Fresh 11.5 0.27 0.37 0.09 4.9 30,800 42,700 9,800 1,810
Total 12.2 0.27 0.38 0.09 4.9 32,700 47,000 10,800 1,940
In completing the review for the period ended 31 December 2025, the historical resource factors were reviewed and found
to be relevant and current. The Koongie Park project has not been converted to an active operation yet and hence no
material resource depletion has occurred for the review period.
Material Changes and Resource Statement Comparison
The 2012 JORC resource at Koongie Park (Sandiego and Onedin) and the Emull resource (as shown above) are the
current versions of the Mineral Resource estimates. No updates have occurred in the year. The information in this Annual
Report that relates to Mineral Resources was prepared and first disclosed under the JORC Code 2012 Edition. The
Company is not aware of any new information or data that materially affects the information as previously released and
all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially
changed.
AuKing Mining Limited
2025 Annual Report
Page 11
DIRECTORS AND OFFICERS
The following persons were directors of AuKing Mining Limited (‘AKN’ or ‘the Company’) during the whole of the financial
period and up to the date of this report, unless stated:
Current Directors
Mr Peter Tighe
Non-Executive Chair
Mr Tighe started his working career in the family-owned JH Leavy & Co business, which is one of the longest established
fruit and vegetable wholesaling businesses in the Brisbane Markets at Rocklea and has been trading since the late 1800s.
As the owner and managing director of JH Leavy & Co, Mr Tighe expanded the company along with highly respected
farms and packhouses that have been pleased to supply the company with top quality fruit and vegetables for
wholesale/export for over 40 years. JH Leavy & Co is considered one of the most successful businesses operating within
the Brisbane Markets.
Mr Tighe has been a director of Brisbane Markets Limited (BML) since 1999. BML is the owner of the Brisbane Markets®
site and is responsible for its ongoing management and development of its $350m asset portfolio. As the proprietor of the
site, BML has over 250 leases in place including selling floors, industrial warehousing, retail stores and commercial
offices. BML acknowledges its role as an economic hub of Queensland, facilitating the trade of $1.5 billion worth of fresh
produce annually, supporting local and regional businesses of the horticulture industry. As a Board member Mr Tighe
has held roles in various sub-committees which include Chairman of Safety and Tenant Advisory Committee, BML
Strategy Investment Committee, and Legal and Compliance Committee.
In 2016 the JH Leavy & Co business was sold but Mr Tighe has continued as the CEO of Global Fresh Australia, trading
as JH Leavy & Co, to ensure a successful transition of ownership.
He has not been a Director of any other Australian listed company in the last three years.
Mr Paul Williams
Managing Director, LLB, BA.
Mr Williams holds both Bachelor of Arts and Law Degrees from the University of Queensland and practised as a corporate
and commercial lawyer with Brisbane legal firm Hopgood Ganim for 17 years. He ultimately became an equity partner of
that firm before joining Eastern Corporation as their Chief Executive Officer in August 2004. In mid-2006 Mr Williams joined
Mitsui Coal Holdings in the role of General Counsel, participating in the supervision of the coal mining interests and business
development activities within the multinational Mitsui & Co group.
Mr Williams is well known in the Brisbane investment community as well as in Sydney and Melbourne and brings to the
AKN Board a broad range of commercial and legal expertise – especially in the context of mining and exploration
activities. He also has a strong focus on corporate governance and the importance of clear and open communication of
corporate activity to the investment markets.
Mr Williams is currently a Non-Executive Director of Alice Queen Limited (appointed 16 July 2025).
He has not been a Director of any other Australian listed company in the last three years.
Mr Lincoln Ho
Non-Executive Director
Mr Ho has over 8 years in ASX listed directorship experience, providing a wide range of business and strategic advice to
both unlisted & listed public companies. Lincoln also has ample experience in mining exploration and administration
jurisdictions within Australia and overseas. Further, he has overseen transactions across local & overseas markets,
working in conjunction with experienced corporate financiers across the emerging caps space.
During the past three years, he has held directorships in the following ASX-listed companies:
➢ Non-Executive Director Exultant Mining Limited (appointed 1 July 2025)
➢ Non-Executive Director Askari Metals Limited (appointed 23 Jul 2024 and resigned 16 April 2025)
➢ Non-Executive Director of Aldoro Resources Limited (appointed 26 November 2020 and resigned 31 August 2024)
➢ Non-Executive Director of Redcastle Resources Limited (appointed 22 November 2022 and resigned 10
September 2024)
➢ Non-Executive Director of Red Mountain Mining Limited (appointed 1 July 2016 and resigned 15 August 2024)
AuKing Mining Limited
2025 Annual Report
P