AUKING MINING
A Near-term Australian Gold Producer
Cloncurry Gold Project, Queensland
F1 Aussie Equities Day, Singapore, 3 October 2025
© Confidential 2025 2
DISCLAIMER
The information contained in this presentation has been prepared by AuKing Mining Limited (AKN). This presentation is not an offer, invitation,
solicitation or other recommendation with respect to the subscription for, purchase or sale of any securities in AKN. This presentation has been
made available for information purposes only and does not constitute a prospectus, short form prospectus, profile statement or offer
information statement. This presentation is not subject to the disclosure requirements affecting disclosure documents under Chapter 6D of the
Corporations Act. While the information contained in this presentation has been prepared in good faith, neither AKN nor any of its Directors,
officers, employees, agents or advisors give any representation or warranty, express or implied, as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this presentation. Accordingly, to the maximum extent permitted by law,
none of AKN, its Directors, officers, employees, agents, advisers, nor any other person accepts any liability whether direct or indirect, express or
limited, contractual, tortuous, statutory or otherwise, in respect of the accuracy or completeness of the information or for any of the opinions
contained in this presentation or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this presentation.
This presentation may contain statements that may be deemed ‘forward-looking statements’. Forward risks, uncertainties and other factors,
many of which are outside the control of AKN, can cause actual results to differ materially from such statements. Such risks and uncertainties
include, but are not limited to, commodity price volatility, increased production costs and variances in ore grade recovery rates from those
assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. AKN makes no
undertaking to update or revise such statements but has made every endeavour to ensure that they are fair and reasonable at the time of
making the presentation. Investors are cautioned that any forward-looking statements are not guarantees of future performance and that
actual results or developments may differ materially from those projected in any forward-looking statements made. Exploration priorities
change with increased data and knowledge, as such targets and concepts outlined in this presentation may or may not be tested or be tested
by different means.
THIS PRESENTATION IS AUTHORISED BY THE BOARD
3
COMPANY HIGHLIGHTS
TEAM IN PLACE TO DELIVER: Our board and management
comprise of industry veterans with decades of leadership and
operational experience at major gold producers including Placer
Dome Inc., Barrick Gold Corporation, BHP Billiton, Ivanhoe Mines,
WMC Resources, Normandy Mining/Newmont and Pilbara Minerals
as well as deep commercial expertise drawn from Mitsui & Co Group
roles, ensuring disciplined execution and sustained value creation.
STRATEGIC CONSOLIDATION OPPORTUNITY
In addition to our exploration tenure, multiple third-party
deposits lie within hauling distance of the Lorena plant and can
be toll-treated or JV-processed, diversifying feed sources and
accelerating cash flow.
RESTART PATHWAY INCLUDING EARLY CASH FLOW: Initiate
operations through a 50:50 JV with the private owner of the Tick Hill
mine to toll-treat Tick Hill tailings, with plans to scale up to
nameplate capacity through additional satellite assets.
STRATEGIC ACQUISITION ON ATTRACTIVE
TERMS: Deal terms have been finalised to
acquire 100% of the Cloncurry Gold Project in
Queensland (currently under care and
maintenance) from the current owners. The
transaction includes the processing plant and
associated land package, with AuKing to act as
operator.
PROCESSING PLANT WITH EXCELLENT
INFRASTRUCTURE: Fully permitted plant
(commissioned 2018, 280ktpa) with
replacement value >$30M, 15km from
Cloncurry; enables low-cost feed from
multiple satellite deposits.
SCALABLE RESOURCE WITH UPSIDE: Fully-
permitted MLs at Mt Freda and Golden Mile
with historic JORC resources and upcoming
drill programs aimed at resource expansion
4
CORPORATE STRATEGY: ACQUIRE, RESTART, SCALE.
STAGE 1 SECURE
(NEXT 12 MONTHS)
ESTABLISH FOUNDATIONAL ASSETS
▪ 447 km2 tenement package
▪ Lorena processing plant
▪ Mt Freda, Golden Mide
▪ District scale exploration
tenements
▪ Tick Hill tailings JV
▪ Secure financing package
STAGE 2 DEVELOP
(NEXT 24 MONTHS)
UNLOCK NEAR-TERM CASH FLOW
▪ Restart Lorena CIL plant
▪ Ramp gravity and CIL recoveries
▪ Lorena reaches nameplate
capacity
▪ Re-establish community / TO
agreements and engagement
▪ Generate free cash flow
STAGE 3 SCALE
(NEXT 3 YEARS)
DRIVE PRODUCTION GROWTH AND
DISTRICT SCALE EXPLORATION
▪ Integrate new MRE into mine plan
▪ Consolidate area to optimise
operations
▪ Pursue strategic acquisitions
AuKing is in the process of securing the Clonclurry Gold Project which will provide a foundational portfolio with production and scalability
5
CORPORATE OVERVIEW
TOTAL OPTIONS ON
ISSUE
~625m
varying exercise
prices & expiry dates
MARKET CAPITALISATION
(Undiluted)
~A$4.9m
@ $0.06
CASH ON HAND
~A$0.10m
(30 June 2025)
~802m
SHARES ON ISSUE
TICKER
ASX: AKN
SIGNIFICANT SHAREHOLDERS % SHAREHOLDING
Kabunga Holdings PTY LTD 10.04%
Gage Resources PTY LTD 8.72%
MRS YONGJIE CHEN 5.00%
Top 50 Shareholders ~68.70%
MANAGEMENT
Paul Williams Managing Director
Paul Marshall Chief Financial Officer
Chris Bittar Exploration Manager
6
GOLD’S RELENTLESS RUN
Source – ABC Bullion – Gold Spot Price per Troy Ounce - USD
7
CLONCURRY GOLD PROJECT – 447 KM² STRATEGIC
TENEMENT PACKAGE
▪ 300 ktpa CIL + flotation,
fully permitted,
commissioned 2018
▪ Replacement value >
A$30M;
▪ Strategically located 15 km
east of Cloncurry
LORENA CIL
PROCESSING HUB.
▪ JORC 2012 resource
▪ Plans to establish a reserve
▪ Open along strike & at
depth; drilling planned to
upgrade to M&I
MT FREDA DEPOSIT.
▪ Shamrock & Comstock pits
sit on mining licences
▪ Immediate
resource‐definition targets
along 2 km trend;
drill‐ready
GOLDEN MILE
COMPLEX.
▪ High‐grade intercepts
from 2022 drilling
▪ Just 600 m from Golden
Mile,
▪ High priority exploration
target
MT SCHEELITE
PROSPECT.
▪ 50:50 JV to toll‐treat 665 koz
historic tailings @ 25 g/t
(1990s production)
▪ PFS (2020) confirms viability
at A$2 300/oz, pilot plant
active
TICK HILL TAILINGS
JV
▪ Drill-ready targets across
447 km² including Little
Duke, Evening Star, Musk &
Countess
REGIONAL
EXPLORATION PIPELINE
APPROX. 447KM² OF ASSETS NEAR CLONCURRY:
20 MLS, 1 MDL & 7 EPMS COVERING ~447 KM² IN THE CLONCURRY DISTRICT
8
LORENA PROCESSING PLANT
Leveraging a fully-permitted 300 ktpa CIL + flotation facility 15 km from Cloncurry to fast-track near-term production and
fund our aggressive district exploration
▪ Throughput: 300 ktpa CIL + flotation
(commissioned 2018)
▪ Crushing Circuit: Two-stage (jaw crusher →
cone crusher)
▪ Milling & Classification: 650 kW SAG mill +
500 kW ball mill in closed circuit with two-
stage hydrocyclone classification; cyclone
underflow controlled at 30–35% solids for
optimal liberation
▪ Flotation & CIL: Rougher‐scavenger
flotation ahead of CIL; four-stage CIL tanks
CAPACITY & PERFORMANCE
▪ Acquisition & Restart Capex: A$5 M restart
investment to achieve full production in <
12 months from debt and cash flow
▪ Replacement Value: Independently
appraised at > A$30 M for the CIL +
flotation package.
▪ Operational Efficiency: Fully permitted
plant with optimized flow sheet designed
for low reagent consumption and
minimal downtime.
VALUE & COST
▪ Access & Logistics: Direct Flinders
Highway access + 12 km all-weather haul
roads
▪ Power & Water:Three 600 kVA gensets
with on-site fuel storage for uninterrupted
operations
▪ Ideally located to take advantage of Qld
Government’s CopperString power
initiative
▪ Dual borefield providing secure process
water; on-site raw water tank
INFRASTRUCTURE
9
EXISTING OPEN PITS WITH
VALID MINING LEASES- MT FREDA
STRATEGIC VALUE
Defined open-pit infrastructure in place, direct haul to Lorena
CIL plant.
HISTORIC JORC RESOURCE: A JORC-compliant resource
was previously reported (Indicated & Inferred;).
EXPANSION POTENTIAL: The existing open‐pit remains
open along strike and at depth, offering significant upside.
PLANNED DRILL PROGRAM: RC + DD drilling to expand
and infill, upgrade classification to M&I and delineate a
maiden Reserve.
DEPOSIT GEOLOGY: Hosted in a volcano-sedimentary sequence
dominated by basalts and sandstones; mineralisation occurs in
structurally controlled quartz veining and breccias .
PERMITTING & LOGISTICS: MLs in good standing with EA in
place; haul road to Lorena plant established; on-site tailings
capacity available
10
EXISTING OPEN PITS WITH
VALID MINING LEASES- Golden Mile
STRATEGIC VALUE
Defined open-pit infrastructure in place, direct haul to Lorena
CIL plant.
HISTORIC JORC RESOURCE: A JORC-compliant resource
was previously reported under the former owner.
DRILL‐READY TARGETS: Multiple high-priority zones
along the Shamrock and Comstock structures.
PLANNED DRILL PROGRAM: Infill and extensional
RC/diamond drilling planned to qualify and upgrade the
Mineral Resource Estimate.
GEOLOGICAL SETTING: Quartz-carbonate veins hosted in
chlorite–sericite alteration envelopes.Mineralisation at Mt Freda
and Golden Mile is vein-hosted in a volcano-sedimentary
sequence predominantly composed of basalts and sandstones;
mineralisation is not confined to a single lithology.
METALLURGICAL PROFILE: Historical test work indicates strong
gravity recovery ahead of CIL. Further testwork to be completed
as part of mining restart plan.
AERIAL VIEW OF THE COMSTOCK (LOWER
LEFT) AND SHAMROCK (UPPER RIGHT) PITS
11
EARLY CASHFLOW
POTENTIAL – TICK HILL
TAILINGS
JV & PROJECT SCOPE: 50:50 JV with Tick Hill owner to process
historic tailings & waste rock. Toll-treat model eliminates upfront
mining capex and uses Lorena plant capacity.
HISTORIC PRODUCTION & TECHNICAL DUE DILIGENCE: Tick
Hill produced ~665 koz at ~25 g/t Au in the early 1990s . 2020 PFS
by Carnaby Resources confirmed technical & economic viability
at A$2,300/oz .On-site pilot plant validates metallurgical
performance and tailings handling workflows.
WORK PROGRAM & NEXT STEPS: Engaged independent
consultant for PEA to refine cost model and mine
plan.Complete feasibility study prior to commencement of
toll-treat operations.
50:50 JV TO FAST-TRACK CASH FLOW BY TOLL-TREATING
TAILINGS AT TICK HILL VIA OUR LORENA CIL HUB.
TICK HILL MINE AND TAILINGS STORAGE
12
MAJOR GROWTH POTENTIAL – MT SCHEELITE PROSPECT
IDENTIFIED GOLD MINERALISATION AT MT SCHEELITE AND
PROXIMITY TO NEARBY COMSTOCK AND SHAMROCK OPEN PITS
PRIME LOCATION: 600 m west of the Comstock &
Shamrock pits, with established haul road access to the
Lorena plant.
HISTORIC DRILLING RECOGNISED: Previous drill
programs returned significant near-surface gold assays
GEOLOGICAL SETTING: Quartz–siderite veins hosted in
chlorite–magnetite‐altered Proterozoic clastic rocks;
mineralisation extends along a structurally controlled
corridor.
EXPLORATION OPPORTUNITY: Prospect remains
open along strike and at depth; priority targets defined
for immediate follow-up. Planned RC + diamond
program to establish a maiden JORC Mineral Resource.
INFRASTRUCTURE & ECONOMICS: Toll‐treat via
Lorena CIL plant (<10 km haul) removes standalone
processing capex. Low site‐prep requirements—drill
pads and access already in place.
13
REGIONAL SCALE EXPLORATION UPSIDE
DISTRICT-WIDE TENURE & FRAMEWORK
~447 KM² LAND PACKAGE: Consolidated 20 MLs + 1 MDL + 7 EPMs
in the Cloncurry district supports a robust generative pipeline .
MINERAL / EXPLORATION STRATEGY – detailed plans
to explore and drill regional targets within close
proximity to the Lorena plant
HIGH-PRIORITY TARGET PORTFOLIO
LITTLE DUKE TREND: Soil geochem and IP-defined Cu-Au
anomalies over 4 km strike.
EVENING STAR CORRIDOR: Historic workings and geophysics
highlight discrete structurally controlled quartz veining.
MUSK PROSPECT: Copper-gold hydrothermal breccias identified
in recent drilling.
COUNTESS & VANDERBILT: Emerging gold targets along a
major NNE-striking fault splay .
NEXT STEPS
FIRST-PASS DRILLING: RC across four priority trends to follow up
on generated targets.
PATH TO RESOURCE DEFINITION: Immediate follow-up on any
significant intercepts, fast-track to Resource estimation and
maiden pit shells.
© Confidential 2025 14
AKN to complete its
funding
requirements for
the Cloncurry Gold
acquisition, with
financial close due
late October 2025.
AKN to provide
funding to
commence project
activities at
Cloncurry Gold
project and
additional working
capital.
Establishment of
project operating
plans to be
implemented post-
acquisition
completion. Drilling
at Mt Freda/Golden
Mile and Mt
Scheelite will be a
priority.
AKN and Orion will
engage the project
management team
re-engaging former
senior mining
colleagues of AKN
Board members
Commence
immediate work on
approvals required
for restart of mining
and processing
operations.
NEXT STEPS?
15
BOARD AND MANAGEMENT
MR PETER TIGHE
Non-Executive
Chairman
WELL-KNOWN BRISBANE
BUSINESSMAN. Deputy Chair
of Brisbane Markets Ltd
PAUL WILLIAMS
Managing Director
BA LLB (UQ)
Commercial lawyer with 25
years experience managing
ASX companies
DR KYLIE
PRENDERGAST
Non-Executive
Director
PHD (ECONOMIC GEOLOGY),
GRAD CERT (APP FIN)
Senior geologist with ASX-
company management
experience
MR NICK
HARDING
Non-Executive
Director
A(ACC), GRAD DIP (APP FIN),
GRAD DIP (CORP GOV), FCPA,
FFIN, AGIA
Senior finance executive in
mining companies
MR LINCOLN HO
Non-Executive
Director
B OPTOM (MELB)
Corporate finance advisor to
ASX-listed companies
MR MARK FISHER
Non-Executive
Director
B.SC. (GEOLOGICAL
ENGINEERING)
35yr experience as Senior
Executive of Barrick Gold
MR PAUL MARSHALL
Chief Financial Officer
and Company Secretary
LLB, ACA
More than 30 years experience
in Finance and Corporate
Administration
MR CHRIS BITTAR
Exploration
Manager
MGEOSC, MCOMM
(FINANCE), BMSC
Senior development and
production geologist
© Confidential 2025 16
APPENDICES
17
ADDITIONAL RESOURCE/RESERVE UPSIDE – MT FREDA
Mt Freda has an existing publicly-
reported JORC 2012 resource (indicated
and inferred).
Significant potential to expand existing
Mt Freda resource as it remains open in
along strike and at depth.
Proposed further drilling at Mt Freda to
improve confidence in the resource
estimate, and upgrade classification into
Measured and Indicated Resources and
subsequently to Reserves.
Golden Mile (Shamrock and Comstock
open pits) is the other area for immediate
resource definition and upgrade.
18
ADDITIONAL RESOURCE/RESERVE UPSIDE – GOLDEN MILE
19
KOONGIE PARK, WESTERN AUSTRALIA (COPPER/ZINC)
KEY FINDINGS OF THE COB SCOPING STUDY
INCLUDE:
Joint Venture with ASX-listed Cobalt Blue Holdings (COB)
on a 51% (COB)/49% (AKN) basis. COB has issued results of
a Scoping Study*.
10.5yr mine life
A$70M initial Capex
Onedin deposit mined first – heap leach and SX-EW
processing
Sandiego deposit mined U/G – flotation concentration
Pre-tax NPV8 – A$172M
Pre-tax IRR – 28%
See COB Release to ASX on 6 June 2025
20
MKUJU, TANZANIA (URANIUM)
Situated in southern Tanzania, near the world class
Nyota deposit (152Mlbs U3O8), Mkuju is a 780sq km
portfolio of highly prospective uranium licences, held
100% by AKN’s Tanzanian subsidiary, 92U Tanzania
Ltd. Nyota was acquired by Uranium One in 2011 for
US$1Bn. A substantial drilling program for Mkuju has
been developed and approved, based on initial results
from AKN exploration including the following:
See ASX release 31 January 2024
21
MYOFF CREEK, BRITISH COLUMBIA, CANADA –
(NIOBIUM/RARE EARTHS)
In July 2024, AuKing announced that it had completed the acquisition
of a 100% interest in the Myoff Creek project which comprises eight
mineral claims in south-eastern British Columbia. A recent airborne
magnetic and radiometric survey identified some highly encouraging
results as follows:
▪ CARBONATITE MINERALISATION CONFIRMED: Preliminary survey
results are consistent with previously interpreted and drilled near-
surface carbonatite mineralisation in the northern part of the project
area, which contained notable intercepts of niobium and total rare
earth oxides.
▪ HIGH GRADE HISTORICAL INTERCEPTS: Notable high-grade
intercepts from historical drilling of niobium (Nb) and total rare earth
oxides (TREO).
▪ POTENTIAL CARBONATITE EXTENSION: The survey has also
highlighted previously untested anomalous areas of carbonatite
mineralization in the central and southern areas of the Myoff Creek
tenures, providing potential extensions of carbonatite mineralization
and creating fresh exploration targets for follow-up.
▪ STRATEGIC LOCATION: The Myoff Creek claims are strategically
situated in the South-Central mining region of British Columbia,
known for its rich mineral deposits.
See ASX release 25 September 2025
© Confidential 2025 22
CONTACT DETAILS
AUKING MINING LTD
▪ Level 10, 320 Adelaide Street, Brisbane
QLD 4000
▪ Office: +61 7 3535 1208
PAUL WILLIAMS, MANAGING DIRECTOR
▪ Mobile: +61 419 762 487
▪ Email: p.williams@aukingmining.com