Quarterly Report for the quarter ending 31 December 2024
Auking Mining Limited
ABN 29 070 859 522
ASX Code: AKN
Quarterly Report
For the quarter ending 31 December 2024
www.aukingmining.com
AuKing Mining is an exploration company focused on gold, uranium,
copper and niobium/REE projects in Canada, Australia and Tanzania
Highlights
•
Entered agreement to earn-in a 15%
interest in the Cloncurry Gold Project
with Orion Resources Pty Ltd.
•
Added significant exploration and
mining expertise with appointment of Mr
Fisher, Dr Prendergast and Mr Harding to
the Board.
•
Proposed drilling program at Mkuju,
Tanzania postponed until early 2025,
after wet season.
•
Successful bid with Saudi JV partner for
“Shaib Marqan” project.
Issued Capital:
Ordinary shares
514,778,768
Options
64,500,000 unlisted options (30 September
2025 @ 20c each)
15,625,000 unlisted options (31 December
2025 @ 10c each)
124,333,783 unlisted options (30 April 2027
@ 3c each)
3,000,000 Director incentive options
(31 May 2025 @ 17c each)
2,700,000 Employee incentive options
(31 May 2025 @ 11c each)
•
Closed prospectus to existing
shareholders for rights issue entitlement
offer in October (with a large shortfall).
Subsequent agreement to place shortfall
with Benwest Investment Services.
•
Extended short-term $750k loan facility
during the Quarter.
•
EGM held in late December 2024 pursuant
to s249D Notices issued to Company.
Directors:
Contact
Non-Executive Chairman Peter Tighe
Managing Director Paul Williams
Non-Executive Director Mark Fisher
Non-Executive Director Dr Kylie Prendergast
Non-Executive Director Nick Harding
Suite 34, Level 10
320 Adelaide Street
BRISBANE Q 4000
Ph: +61 7 3535 1208
Email:
admin@aukingmining.com
Company Secretary Paul Marshall
Quarterly Report for the quarter ending 31 December 2024
2
Queensland Project
Cloncurry Gold Project
Ownership – 15% earn-in right | Cloncurry, north-western Queensland
Gold exploration and near-term development project
Cloncurry Project
Orion Resources Pty Ltd (Orion) has entered into an asset sale agreement (ASA) to
acquire the existing Lorena processing plant and associated facilities, situated
approximately 15 kms east of Cloncurry in northern Queensland, together with various
exploration and mining tenements in that area. The Lorena plant is a conventional carbon
in leach gold processing facility. In addition, Orion has acquired under the ASA additional
exploration and mining tenements approximately 30kms to the south of the Lorena plant,
described as the “Mt Freda/Golden Mile Project”. The overall tenure package being
acquired by Orion covers an area of 447km2 in the Cloncurry Region and includes
several granted Mining Leases and existing gold resources.
Orion is developing plans to re-establish mining and processing operations at Lorena,
with a focus on first mining from the Mt Freda/Golden Mile deposits subject to completion
of further resource definition drilling and studies. As part of a broader production
strategy, Orion proposes to establish a central gold and copper processing hub for the
region.
Mt Freda/ Golden Mile Project
On 4 March 2021 Ausmex Mining Group Limited (ASX: AMG) reported an upgraded
mineral resource for the Mt Freda deposit (as shown in Table 1 below). The resource is
located in three zones of gold mineralization that fall within a shear zone; the Main Lode,
the NW Lode, and the NE lode. Mt Freda has been mined historically, with remaining
resources below the historical open pit controlled in their lateral and vertical extents by a
geological model. This model was created from lithological descriptions and geochemical
data collected from holes drilled by various explorers since the 1980’s.
Table 1 – Mt Freda mineral resource estimate (Refer AMG release to ASX 4 March 2021)
A central component of Orion’s plans is the conduct of additional drilling and mineral
resource estimation work in and around the Mt Freda/Golden Mile Project. The nature of
Quarterly Report for the quarter ending 31 December 2024
3
the proposed work will be the primary focus of the AuKing Earn-in agreement (see below)
and includes the following:
•
•
•
•
Further drilling to identify additional gold resources and provide greater definition
of existing resources;
Re-assessment of previous geological and related modelling;
Preparation of an upgraded mineral resource estimate for Mt Freda and the
nearby Golden Mile areas; and
General tenement administration and maintenance.
Figure 1 – Orion’s Cloncurry Project interests, including the Mt Freda/Golden Mill mining leases.
[Note the nearby Wynberg and Wallace/Wallace South gold projects are not assets being acquired
by Orion]
Quarterly Report for the quarter ending 31 December 2024
4
Earn-in Agreement Terms
AuKing has entered into an agreement with Orion making provision for AuKing to earn up
to a 15% interest in the Cloncurry Project in accordance with the following terms:
•
•
•
•
•
•
The focus of activities by AuKing will be exploration, drilling and resource estimation
work associated specifically with the Mt Freda/Golden Mile Project areas, which are
the contemplated first areas for mining under Orion’s development program.
AuKing will have the right to earn a 15% interest in the total package of assets
(comprising the Cloncurry Project) that are being acquired by Orion by spending
$1.5M on proposed exploration, drilling and resource estimation work at Mt
Freda/Golden Mile on or before 31 December 2025.
AuKing will be the manager of project activities that it is providing the funding for at
Mt Freda/Golden Mile.
On completion of the AuKing earn-in, a Joint Venture will be established between
AuKing and Orion on normal terms for a mining joint venture, with the participating
interests of 15% (AuKing) and 85% (Orion) respectively.
In the event of AuKing failing to meet the $1.5M expenditure amount, its interests in
the Cloncurry Project will lapse.
Some other features of the agreement between AuKing and Orion include:
o
Orion will meet the purchase price obligations for the purchase of the Cloncurry
Project from its own sources and no funds are payable by AuKing; and
o
There are no additional rights for AuKing to acquire further interests in the
Cloncurry Project after it acquires the 15% holding. To the extent any further
rights are created, that will be a matter for future negotiation.
Figure 2 – Lorena Processing Facility
Quarterly Report for the quarter ending 31 December 2024
5
Canada Projects
Myoff Creek
Ownership – 100% | British Columbia, Canada
Niobium and REE exploration project
No work was conducted on this project during the December Quarter.
Upcoming Exploration
There are plans to conduct an airborne radiometric survey across the Myoff Creek tenure
portfolio in early 2025, after the winter weather conditions ease.
Grand Codroy
Ownership – 100% | Newfoundland, Canada
Uranium and Copper exploration project
Grand Codroy Acquisition Terms
As announced on 21 October 2024, AuKing completed an agreement to acquire all the
shares in Australian-registered company Lithium Rabbit Pty Ltd (LR). LR owns 100% of
one (1) mineral claim of an area totalling 2,200Ha that comprises the Grand Codroy
Project.
A summary of the acquisition terms was as follows:
•
•
The purchase price comprised the following:
o
A$50k cash payment (the payment of which was deferred by agreement with
the LR vendors until 30 November 2024);
o
The issue of 21,428,571 ordinary AuKing shares (comprising a $150,000
amount of shares at an issue price of $0.007 per share – half of these shares will
be the subject of a voluntary 6 month escrow from trading on the ASX); and
o
A further number of ordinary fully paid AuKing shares based on an amount of
$100,000 and the applicable previous 20 trading day VWAP calculation for the
shares trading on the ASX. These deferred shares are to be issued within 12
months from the date of acquisition at no less than 0.5c per share (or a total of
20,000,000 shares) and subject to shareholder approval;
A 2% net smelter royalty on all materials produced from Grand Codroy. 1% of this
royalty can be purchased by AuKing for $1M at the election of AuKing.
Quarterly Report for the quarter ending 31 December 2024
6
Upcoming Exploration
There are plans to conduct an initial rock chip and soil sampling program across the
Grand Codroy mineral claim, in early 2025, after the winter weather conditions ease.
Tanzania Projects
Ownership 100% | Tanzania
Uranium and Copper projects
In January 2023, AuKing announced completion of the acquisition of its 100% interest in
six projects in Tanzania (Ref ASX Release 31 January 2023).
Mkuju is currently the priority focus of exploration activities in Tanzania and is located
immediately south of the Nyota uranium project which is being developed by Mantra
Tanzania (a member of the Rosatom Group).
2024 Mkuju Exploration Program (Stage 2)
Earlier in 2024, AuKing announced details of its proposed Stage 2 drilling program at
Mkuju, comprising an estimated 75 drill hole (11,000m) air core/RC drilling program.
AuKing elected to postpone commencement of the drilling program until early into 2025,
after the end of the wet season in this region of southern Tanzania.
Sale of Non-core Manyoni Licences
On 16 October 2024, AuKing announced it had reached agreement to sell its remaining
non-core Manyoni PLs to ASX-listed Moab Minerals Limited (ASX: MOM) for a total
purchase price of A$175,000. The sale remains conditional on certain Tanzanian
regulatory matters but is anticipated to be completed during Q1 of 2025.
In addition, AuKing provided MOM (and its associated entity in Tanzania, Katika
Resources Limited) with a release and waiver in respect of any claims as against MOM,
Katika and the license interests that Katika currently holds in the Manyoni region. The
release and waiver does not include any rights or claims of AuKing to seek compensation
from the Tanzanian Mining Commission as a result of the expropriation of the two key
PLs back in February 2023.
Monaco Copper Project, western Tanzania
There were no activities to report in relation to this project for the Quarter.
Quarterly Report for the quarter ending 31 December 2024
7
Koongie Park Project
Western Australia, Australia
Ownership 100% (subject to 1% net smelter royalty)
Total JORC Resources: Sandiego/Onedin - 8.9 million tonnes @ 1.01% Cu, 3.67% Zn,
0.16g/t Au, 32g/t Ag, 0.77% Pb and Emull -12.2 million tonnes @ 0.27% Cu, 0.38% Zn,
0.09% Pb and 4.9g/t Ag
No work was undertaken on this Project during the December Quarter.
Saudi Arabia Joint Venture
Kingdom of Saudi Arabia
Ownership – right to earn a 70% interest in JV 100%
Summary
On 6 November 2024, the Company announced that, together with local Saudi Arabian
partner, Barg Alsaman Mining Company (BSMC), it had been successful in securing the
“Shaib Marqan” exploration licence as part of the Saudi Ministry of Industry and Mineral
Resources’ 6th Licensing Round bid process.
Shaib Marqan is situated in central Saudi Arabia and covers an area of 91.8km2. The
project area is around 240km south-west of Riyadh and is part of the Ar Rayn Terrane
along the eastern margin of the Arabian-Nubian Shield (ANS). Despite being smaller than
other terranes within the ANS, the Ar Rayn Terrane is known for hosting multiple mineral
systems and mineral commodities, including volcanogenic massive sulfide (VMS)-hosted
copper and zinc, epithermal and orogenic gold, and iron oxide copper/gold (IOCG)
deposits.
Saudi Joint Venture
In conjunction with BSMC, Auking has now established its Joint Venture in Saudi Arabia
with BSMC (“Saudi JV”) and a new JV company has been incorporated. Under the terms
of the Saudi JV, Auking has the right to earn a 70% joint venture interest by incurring
project-related expenditure up to the stage of a feasibility study for the particular project.
At the present time, the Saudi JV has two (2) project interests – first, the BSMC-owned
project known as “Wadi Salamah” and the Shaib Marqan project awarded by the Saudi
Ministry of Industry and Mineral Resources (“Ministry”). An exploration licence has just
been granted for Wadi Salamah and steps are being taken with the Ministry in order to
secure the Shaib Marqan licence.
Quarterly Report for the quarter ending 31 December 2024
8
RMI Option
As a consequence of the Board’s decision to focus efforts on the Orion Resources
Cloncurry Project and its other existing exploration interests, the Company announced
(on 13 January 2025) that it had entered into a binding term sheet with Resource Mining
Incorporated (ASX:RMI), whereby RMI has an exclusive right to acquire AuKing’s
interests in the Saudi JV. Key provisions of the term sheet include the following:
•
•
•
RMI has an option to purchase all of Auking’s rights, obligations and interests in
the Saudi JV, for a period of thirty (30) days commencing after the grant by the
Ministry of the Shaib Marqan licence (“RMI Option”);
No consideration is payable by RMI to AuKing in respect of the exercise of the RMI
Option, other than RMI’s agreement to:
o
Assume all of AuKing’s obligations under the Saudi JV; and
o
(at its own expense and at no cost to AuKing), RMI assisting BSMC to
secure grant of the Shaib Marqan licence and the commencement of
exploration activities at the Wadi Salamah project; and
In the event that the RMI Option is not exercised, AuKing’s interest in the Saudi JV
will automatically revert to BSMC, for no consideration.
Corporate
Extraordinary General Meeting – 23 December 2024
After receipt of various notices pursuant to section 249D of the Corporations Act, the
Company convened an extraordinary general meeting of shareholders on 23 December
2024. The resolutions seeking removal of Peter Tighe and Paul Williams as directors
were not passed, not were the resolutions seeking the appointment of new directors to
replace these existing Board members.
Certain other resolutions (to approve/ratify the issue or proposed issue of shares and
options in the Company were approved at this meeting.
Entitlement Offer to Shareholders
On 12 September 2024, the Company announced that it had lodged a prospectus for a
pro-rata non-renounceable entitlement offer of ordinary shares (New Shares) to existing
shareholders on a 2 for 3 entitlement basis at an issue price of 0.7 cents per share to
raise approximately $1.48 million (Entitlement Offer). For every two (2) New Shares
issued to a holder as part of their subscriptions under the Entitlement Offer, the holder
will also receive one (1) unlisted attaching option exercisable at 3 cents and expiring 30
April 2027 (New Option). The Entitlement Offer closed on 10 October 2024.
Quarterly Report for the quarter ending 31 December 2024
9
On 16 October 2024 the Company announced the following results of the Entitlement
Offer were as follows:
•
Acceptances were received in the Entitlement Offer for a total of 7,351,541 New
Shares (including applications for additional New Shares) from 55 shareholders
raising $51,460.88. An additional 7,142,857 New Shares arising from the shortfall
have been placed to a private sophisticated investor, giving rise to total funds
raised to $101,460.88.
•
Board members Tighe and Williams contributed their entitlement as committed in
the Prospectus dated 12 September 2024.
•
All applications from shareholders for additional New Shares would be met in full.
•
The net shortfall remaining under the Entitlement Offer was $1,385,747.87
(197,963,982 shares).
The 14,494,398 New Shares and attaching 7,247,200 New Options were issued on 16
October 2024.
On 27 November 2024 the Company announced that agreement had been reached with
Benwest Investment Services Pty Ltd (AFSL No. 258832) to subscribe for the Entitlement
Offer shortfall by way of a placement to investors on the same terms as were offered
under the Entitlement Offer. As at the close of the offer period for the Entitlement Offer
shortfall (10 January 2025) a total of an additional $864,000 in funds had been
subscribed, giving rise to the issue of a further 123,428,501 New Shares and 60,285,719
New Options.
Extension of Short-term Tighe Loan
During the December 2024 Quarter, the Company and its Company Chairman, Mr Peter
Tighe, agreed to further extend repayment of the A$750,000 loan to be repaid by the
Company until 31 March 2025, with interest payments to continue to be paid on the same
terms.
New Board Members
On 19 December 2024, the Company announced certain changes to its Board as follows:
•
Mark Fisher, Dr Kylie Prendergast and Nick Harding had joined the board as
additional directors (see respective CV’s for each of these persons below);
•
Peter Tighe would remain in his role as non-executive Chairman;
•
Paul Williams would remain as Managing Director; and
•
Shizhou Yin had retired as a director.
The appointments of Mr Fisher, Dr Prendergast and Mr Harding have added important
exploration and mining experience and expertise to the Board.
Quarterly Report for the quarter ending 31 December 2024
10
Mark Fisher, B.Sc. (Geological Engineering)
Mark is a highly accomplished resources executive with over 35 years of experience. His
skills and experience include strategic business planning, feasibility, project
management, organization design, mine engineering and mine management. Mark’s
combination of skills and depth of experience has consistently produced profitable and
sustainable outcomes in complex settings delivering increased shareholder value.
Mark’s extensive global leadership and operational experience includes senior positions
with Placer Dome Inc and Barrick Gold Corporation over a period of decades. In his last
corporate role, Mark was President of the Global Copper division for Barrick Gold
Corporation, executing the development strategy for its portfolio of key copper assets in
South America, Africa, Middle East and Asia.
Dr Kylie Prendergast, PhD (Economic Geology), Grad Cert (App Fin)
Kylie is an experienced geologist and technical leader with more than 25 years’
experience within the international and resource sector. She currently holds the position
of Managing Director at Helix Resources Limited (ASX: HLX) and has worked across a
range of different operating jurisdictions, including significant in-country assignments and
expatriate roles. This has included substantial business development, project technical
and economic evaluation, and commercial management including direct interaction with
a range of stakeholders in global resource capital markets.
Previously the Managing Director at leading industry consultant Mining Associates, Dr
Prendergast has held senior leadership roles with Felix Gold Limited (Managing Director),
Mawarid Mining (Oman – GM Exploration and Business development), Batu Mining
(Mongolia – Senior Geologist) and Gold Fields St Ives (Project Generation Geochemist).
Prior to that she worked in technical geology positions with BHP Billiton, Ivanhoe Mines
(Mongolia) and North Limited.
Nick Harding, BA(Acc), Grad Dip (App Fin), Grad Dip (Corp Gov), FCPA, FFin, AGIA
Nick is a Certified Practicing Accountant (FCPA) with extensive executive and senior
management experience across the resources and agribusiness sectors in the areas of
finance, commercial, corporate governance and company administration. He possesses
significant experience in equity raisings, debt funding, management and statutory
reporting, corporate governance, financial modelling and the preparation of feasibility
studies.
Nick has held the roles of Executive Director, Chief Financial Officer, and Company
Secretary through his professional services company for a number of ASX listed junior
Quarterly Report for the quarter ending 31 December 2024
11
exploration companies over the past 16 years, taking some of these through to the
evaluation phase and into development and production.
Prior to this, over a 20-year period, Nick has held senior finance management positions
within WMC Resources, Normandy Mining/Newmont Australia and Beach Energy across
various commodities including gold, copper, nickel, uranium, industrial minerals and oil
and gas.
ASX Additional Information
Exploration Activities ASX Listing Rule 5.3.1:
There was limited focus on AuKing’s exploration activities during the December Quarter
as capital raising efforts continued. Total exploration expenditure for the December
Quarter was $32k.
Mine Production Activities ASX Listing Rule 5.3.2:
There were no mine production or development activities conducted during the Quarter.
ESG commitment
The Company has previously adopted the World Economic Forum’s Environment, Social
and Governance (ESG) framework and instructed management to set up an impact
measurement plan for each sustainability area. These areas include governance, anticorruption practices, ethical behaviour, health and safety, GHG emissions, land use,
ecological sensitivity, water consumption, diversity and inclusion, pay equality and
economic contribution. To ensure that AuKing can measure, monitor, and report on its
ESG progress, the Company has engaged impact monitoring technology platform
Socialsuite to streamline the outcomes measurement and ongoing ESG reporting
process.
Related Party Payments
During the December 2024 Quarter, AuKing paid a total of $80,768 of director fees.
to related parties and their associated entities.
Board and Senior Management
Mr Peter Tighe, Non-Executive Chairman
Mr Paul Williams, Managing Director
Mr Mark Fisher, Non-Executive Director
Dr Kylie Prendergast, Non-Executive Director
Mr Nick Harding, Non-Executive Director
Mr Chris Bittar, Exploration Manager
Mr Paul Marshall, CFO and Company Secretary
12
Quarterly Report for the quarter ending 31 December 2024
Financial Position
At 31 December 2024, AuKing had cash reserves of $34,000. Further details of AuKing’s
financial activities during the December 2024 Quarter are set out in the Appendix 5B
Quarterly Cashflow Statement which accompanies this report.
Share Information
Issued share capital of 514,778,768 ordinary shares, 64,500,000 options to subscribe for
ordinary AKN shares at an exercise price of 20c each and exercisable on or before 30
September 2025, 15,625,000 options to subscribe for ordinary AKN shares at an exercise
price of 10c each and exercisable on or before 31 December 2025, and 124,333,783
options to subscribe for ordinary AKN shares at an exercise price of 3c each and
exercisable on or before 30 April 2027. There are also 3,000,000 director incentive
options (17c exercise price on or before 31 May 2025) and 2,700,000 employee incentive
options (11c exercise price on or before 31 May 2025) on issue.
Top 10 Shareholders of AKN at 31 December 2024
Rank
Name
1
2
3
4
5
6
Kabunga Holdings Pty Ltd <Kabunga Family A/c>#
Ven Capital Pty Ltd#
Mr Pavle Tomasevic
Brian and Noeline Smith
10 Bolivianos Pty Ltd
M&K Korkidas Pty Ltd <M&K Korkidas Pty Ltd A/c>
Mr Peter Tighe and Mrs Patricia Tighe <The Peter Tighe
S/F A/c>
Bienitial International Industrial Co Ltd
Ropa Investments (Gibraltar) Limited
BNP Paribas Nominees Pty Ltd <IB AU Noms Retail
Client>
7
8
9
10
TOTAL
# Denotes substantial shareholder
Number of
Shares
41,000,000
23,080,000
19,670,000
14,285,714
13,193,324
12,262,525
%
10.11
5.69
4.85
3.52
3.25
3.02
10,250,371
2.53
9,245,092
7,995,737
2.28
1.97
6,789,245
1.67
157,772,008
38.89
Quarterly Report for the quarter ending 31 December 2024
Other Details
Head Office
Share Registry
Level 10, Suite 34
320 Adelaide Street
Brisbane Q 4000
Phone: +61 7 3535 1208
Website: www.aukingmining.com
Link Market Services Limited
Level 12, 300 Queen Street
Brisbane Q 4000
Phone: 1300 554 474
This announcement is authorised by the Board.
For further information contact:
Paul Williams
Managing Director
p.williams@aukingmining.com
+61 419 762 487
13
14
Quarterly Report for the quarter ending 31 December 2024
JORC Resources
Onedin Mineral Resource Estimate and Metal Tonnes
Zone
Classification
Tonnes
(Mt)
Copper
(%)
Zinc (%)
Gold
(g/t)
Silver
(g/t)
Lead (%)
Cu
Dominant
Indicated
1.5
1.1
0.6
0.2
47
1.2
Inferred
-
-
-
-
-
-
Zn
Dominant
Indicated
3.3
0.5
4.3
0.1
34
1.0
Inferred
Resource Total and Grades
-
-
-
-
-
-
4.8
0.7
3.2
0.1
38
1.1
Zone
Classification
Tonnes
(Mt)
Copper
(tonnes)
Zinc
(tonnes)
Gold
(oz)
Silver
(Moz)
Lead (tonnes)
Cu
Dominant
Indicated
1.5
16,500
9,000
9,600
2.27
18,000
Inferred
-
-
-
-
-
-
Zn
Dominant
Indicated
3.3
16,500
141,900
10,600
3.61
33,000
Inferred
-
-
-
-
-
-
20,200
5.88
51,000
Total Metal Tonnes
Note:
33,000
150,900
(1) Reported tonnes and grade are rounded
(2) Reporting cut-off grades of 0.4% Cu and 1% Zn have been applied to the Onedin deposit
Sandiego Mineral Resource Estimate and Metal Tonnes
Cu
Dominant
Zn
Dominant
Classification
Tonnes
(Mt)
Copper
(%)
Zinc (%)
Gold
(g/t)
Silver
(g/t)
Lead (%)
Indicated
1.7
2.3
0.8
0.3
18
0.2
Inferred
0.3
1.6
3.0
0.2
5
0.0
Sub Total
2.0
2.2
1.1
0.3
16
0.1
Indicated
2.0
0.6
7.3
0.1
35
0.7
Inferred
0.1
0.2
6.1
0.1
10
0.1
Sub Total
2.1
0.6
7.3
0.1
34
0.7
4.1
1.4
4.3
0.2
25
0.4
Classification
Tonnes
(Mt)
Copper
(tonnes)
Zinc
(tonnes)
Gold
(oz)
Silver
(Moz)
Lead (tonnes)
Indicated
1.7
39,100
13,600
16,400
0.98
3,400
Resource Total and Grades
Cu
Dominant
Zn
Dominant
Inferred
0.3
4,800
9,000
1,900
0.05
0
Sub Total
2.0
43,900
22,600
18,300
1.03
3,400
Indicated
2.0
12,000
146,000
6,400
2.25
14,000
Inferred
0.1
200
6,100
300
0.03
100
Sub Total
2.1
12,200
152,100
6,700
2.28
14,100
56,100
174,700
25,000
3.31
17,500
Total Metal Tonnes
Note:
(1) Reported tonnes and grade are rounded
(2) Reporting cut-off grades of 0.8% Cu and 3% Zn have been applied to the Sandiego deposit
15
Quarterly Report for the quarter ending 31 December 2024
JORC Resources (cont.)
Emull Base Metals Deposit
December 2022 Mineral Resource Estimate (0.15% Cu Cut-off)
Type
Oxide
Transitional
Fresh
Total
Type
Oxide
Transitional
Fresh
Total
Type
Oxide
Transitional
Fresh
Total
Tonnage
Mt
0.26
0.34
1.8
2.4
Cu
%
0.28
0.29
0.31
0.30
Zn
%
0.72
0.68
0.57
0.60
Indicated Mineral Resource
Pb
Ag
Cu
Zn
%
g/t
t
t
0.16 5.4
700
1,800
0.17 7.0
1,000
2,300
0.14 6.6
5,600
10,400
0.14 6.6
7,300
14,500
Tonnage
Mt
0.04
0.05
9.7
9.8
Cu
%
0.24
0.25
0.26
0.26
Zn
%
0.23
0.18
0.33
0.33
Inferred Mineral Resource
Pb
Ag
Cu
Zn
%
g/t
t
t
0.05 3.1
100
100
0.04 3.4
100
100
0.08 4.6
25,200
32,300
0.08 4.5
25,400
32,500
Tonnage
Mt
0.29
0.39
11.5
12.2
Cu
%
0.28
0.28
0.27
0.27
Zn
%
0.66
0.61
0.37
0.38
Total Mineral Resource
Pb
Ag
Cu
%
g/t
t
0.14 5.2
800
0.15 6.6
1,100
0.09 4.9
30,800
0.09 4.9
32,700
Zn
t
1,900
2,400
42,700
47,000
Pb
t
400
600
2,400
3,400
Ag
koz
50
80
390
510
Pb
t
Ag
koz
7,400
7,400
10
1,420
1,430
Pb
t
400
600
9,800
10,800
Ag
koz
50
80
1,810
1,940
Note:
The Mineral Resource has been compiled under the supervision of Mr. Shaun Searle who is a director of Ashmore Advisory
Pty Ltd and a Registered Member of the Australian Institute of Geoscientists. Mr. Searle has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity that he has undertaken to
qualify as a Competent Person as defined in the JORC Code.
All Mineral Resources figures reported in the table above represent estimates at December 2022. Mineral Resource
estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape and
continuity of the occurrence and on the available sampling results. The totals contained in the above table have been
rounded to reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies.
Mineral Resources are reported in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The Joint Ore Reserves Committee Code – JORC 2012 Edition).
Competent Persons’ Statements
The information in this report that relates to exploration results is based on information compiled by Mr
Chris Bittar who is a member of the Australasian Institute of Mining and Metallurgy. Mr Bittar is an
employee of AuKing Mining Limited and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which they are undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Bittar consents to the
Quarterly Report for the quarter ending 31 December 2024
16
inclusion in the report of the matters based on his information in the form and context in which it
appears.
The information in this report that relates to Mineral Resource Estimates at the Koongie Park Project
(Onedin and Sandiego) is based on information compiled by Mr David Williams who is a member of the
Australian Institute of Geoscientists. Mr Williams is a Principal Consultant Geologist (Brisbane) of CSA
Global and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.’ Mr Williams consents to the inclusion in this release of the matters
based on his information in the form and context in which it appears.
The information relating to the Mineral Resource Estimates at the Koongie Park copper/zinc project
(Onedin and Sandiego) is extracted from the Independent Mineral Resource Estimate of CSA Global
(the Report) dated 4 April 2022, which is available to view on the AKN website www.aukingmining.com.
The Report was
Share your feedback
Discover