Further significant auger drill uranium results from Mkuju
Released
Released
Announcement PDF
Auking Mining Limited
ASX:AKN
Suite 2208, Level 22
127 Creek Street
Brisbane Queensland 4000
ABN 29 070 859 522
Phone 07 3535 1208
www.aukingmining.com
29 December 2023
ASX RELEASE
Further significant uranium results from auger drilling at
Mkuju in Tanzania
Highlights
• Completion of initial exploration program continues at the Mkuju Uranium
Project, in southern Tanzania. Results from recent auger drilling has returned
further high grade U3O8 results including:
MKAU23_020 4m @ 598ppm U3O8 incl 1m @ 1896ppm U3O8
MKAU23_035 2m @ 110ppm U3O8
MKAU23_045 2m @ 169ppm U3O8 incl 1m @ 283ppm U3O8
• Mkuju comprises a 1070sq km licence area immediately adjacent to the world
class Russian-owned Nyota uranium project.
• A hand-held spectrometer is also being used as part of the Mkuju program and
is producing highly elevated radiation readings in and around the same sample
areas.
• These results provide further confirmation of potentially significant uranium
mineralisation across the historical radiometric survey conducted over the
Mkuju Project area.
• Both auger and diamond drilling programs ceased for the Christmas/New Years,
with activities scheduled to re-commence in early January 2024 (weather
permitting).
Cautionary Statement
The Company uses a Delta Olympus portable hand-held pXRF analyzer and an RS230 gamma ray
spectrometer to screen all samples for mineralisation before submitting samples to the lab for assay.
This allows for some understanding of the distribution of mineralisation prior to sampling to better
ensure that samples submitted for analysis are representative of the type and style of mineralisation.
The hand-held XRF and spectrometer units provide confirmation that mineralisation is present
1
however it is not an accurate determination of the elemental concentration within the sample
anlaysed. Limitations include: very small analysis window, possible inhomogeneous distribution of
mineralisation, analytical penetration depth, possible effects from irregular rock surfaces.
Accordingly, results obtained from the hand-held pXRF and spectrometer units are indicative only
and may not be representative of elemental concentration within the material sampled. The pXRF
and spectrometer readings published in this release are subject to confirmation by chemical analysis
from an independent laboratory.
AuKing Mining Limited (ASX: AKN) continues to identify uranium mineralization as part
of its Stage 1 exploration and drilling program at the Mkuju Uranium Project in
southern Tanzania.
AuKing’s CEO, Mr Paul Williams, said Mkuju was emerging as a possible major extension
of the world class nearby Nyota Uranium Project that was sold by previous owner Mantra
Resources in 2011 for $1.16Bn.
“We continue to return very promising uranium results from our exploration and drilling,
including these most recent results from auger drilling in the area. Unfortunately, the
technical problems continued to hamper the ability of the auger to drill to our target depths
of 30m and that unit has been withdrawn from the field for major servicing. The diamond
drilling rig that was mobilized in mid-November was unable to start drilling until late
December due to technical issues and breakdowns. The crew are planning to mobilise in
early January and will try to complete as many metres as possible before the rains come,”
Mr Williams said.
“Despite some frustrating issues with our drilling rigs over recent months, AuKing’s
exploration team has been successful in establishing the existence of areas of significant
uranium mineralization across the more than 1,000 square kilometres of licence holdings at
Mkuju. We have learned a lot about the operating conditions at Mkuju in recent months and
established the basis for a significant and systematic drilling program in 2024,” he said.
Figure 1 – Mkuju Project Location
2
Mkuju Auger Drilling Results
A summary of the auger drilling results achieved from the Stage 1 exploration program at
Mkuju are highlighted below and also set out in full in Annexure A to this release:
Hole ID
MKAU23_011
MKAU23_014
MKAU23_018
MKAU23_020
Incl.
MKAU23_035
MKAU23_042
MKAU23_045
Incl.
From (m)
10
0
2
0
0
7
6
0
0
To (m)
11
1
6
4
1
9
7
2
1
Width
1
1
4
4
1
2
1
2
1
Grade (U ppm)
38
159
48
598
1896
110
51
169
283
Table 1 – Mkuju highlighted auger drilling results
A number of observations need to be made in relation to the auger drilling program:
• Overall, the auger drilling program comprised 55 holes for a total of 547m drilled, with
the deepest hole being 18m and an average hole depth of 10m;
• AuKing’s planned drilling for the auger rig was to achieve depths of 30m per hole and
that based on historical drilling in the area (including at Nyota), uranium mineralization
was expected to be observed if these drilling depths were achieved;
• However, as noted previously, the auger drilling rig has experienced several
mechanical faults and other problems since arriving to site in August 2023 and these
issues have prevented the 30m target depth being achieved for any drill hole;
• AuKing’s exploration team believes this is the major reason why most of the auger
holes did not identify uranium mineralisation – the holes were simply not deep
enough;
• the auger rig has now been removed from site and is undergoing a major overhaul in
Dar es Salaam. Whether it returns to the Mkuju site will be a matter for AuKing to
consider as it would appear to make more sense for future drilling to be undertaken
by way of air core/RC drilling rig; and
• Despite the ongoing mechanical problems, AuKing has still been able (in some of the
drill holes) to identify significant uranium mineralization, including over to the eastern
part of the Mkuju licence area. As has been the case with the previously-reported
rock chip and soil sample results, these auger drill results provide further correlation
with the historical radiometric survey. More importantly, the results provide a strong
basis for the next stage of proposed drilling at Mkuju which is planned for the first half
of 2024, as soon as access is permissible after the wet season has concluded.
Diamond drilling at Mkuju
AuKing sought to mobilise the track-mounted diamond drilling rig in early November 2023 in
an attempt to carry out a few quick drill holes to a depth of approximately 100m in order to
3
test uranium mineralisation at certain priority target holes. Unfortunately, the rig arrived at
site in mid-November and then had several days tramming (on its own tracks) to the first drill
hole location. Mechanical breakdowns then occurred over the next few weeks with the rig
and then final set-up delays meant that drilling did not commence on the first proposed hole
until the week before Christmas. A total of 51m of diamond drilling was completed before
the crew departed site for the Christmas/New Year vacation period. At this stage the crew is
planning to return to site in the next few days and, if the weather permits, drilling can
resume. However, it is expected that heavier rains will commence over the next few weeks
and the prospect of significant diamond drilling at this time is very limited.
The delays experienced with the diamond rig were frustrating and unfortunate and point to a
greater likelihood that a track-mounted air core/RC drilling rig will be utilized for the planned
future drilling at Mkuju.
Figure 2 – Location of highlighted Mkuju auger drilling results
4
This announcement has been authorised by Paul Williams, CEO, AuKing Mining
Limited.
For more information, please contact:
Paul Williams
Chief Executive Officer
Mobile +61 419 762 487
p.williams@aukingmining.com
Gareth Quinn
Investor Relations
Mobile + 61 417 711 108
gareth@republicpr.com.au
About AuKing Mining
AuKing Mining (ASX:AKN) is a mining exploration company focused on uranium, copper and zinc
projects in both Tanzania and Australia.
AuKing is focussed on the exploration and development of six uranium and copper projects in Tanzania
including:
Mkuju – near to the world class Nyota uranium project in southern Tanzania; the subject of significant previous
exploration
Manyoni/Itigi – the subject of significant exploration situated in central Tanzania, just west of Dodoma
Mpanda/Karema – prospective copper areas in western Tanzania that were the subject of historic mining
operations but largely untouched by modern exploration methods.
The Company also holds the Koongie Park Copper Zinc Project in Western Australia’s Halls Creek Region
hosts a JORC resource and is neighboured by several significant mining and development operations including
Nicholson’s Gold Mine and Savannah Nickel Mine. Koongie Park has already been the subject of significant
exploration drilling and analysis since the 1970’s, hosting over 300 RC and diamond drill holes consisting of
more than 60,000m of drilling in total.
AuKing recently announced the results of its Koongie Park Scoping Study on a proposal to commence mining
operations around a central processing facility at Sandiego.
For further information
www.aukingmining.com
5
Competent Persons’ Statement
The information in this report that relates to exploration results at the Mkuju Project is based
on information compiled by Mr Chris Bittar who is a member of the Australasian Institute of
Mining and Metallurgy. Mr Bittar is an employee of AuKing Mining Limited and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves.’ Mr Bittar consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
ANNEXURE A – Mkuju auger drilling results (Full Table)
HoleID
DEPTH
MKAU23_001
MKAU23_002
MKAU23_003
MKAU23_004
MKAU23_005
MKAU23_006
MKAU23_007
MKAU23_008
MKAU23_009
MKAU23_010
MKAU23_011
MKAU23_012
MKAU23_013
MKAU23_014
MKAU23_015
MKAU23_016
MKAU23_017
MKAU23_018
MKAU23_019
MKAU23_020
MKAU23_021
MKAU23_022
MKAU23_023
MKAU23_024
MKAU23_025
MKAU23_026
MKAU23_027
MKAU23_028
MKAU23_029
9
15
14
13
5
6
12
9
14
2
13
7.5
3
3.8
12
8
7
9
11
13
12
12
18
15
7
11.5
12.5
8
11
EAST
NORTH
(UTM37SWGS84) (UTM37SWGS84)
253178
253181
253187
253560
253982
254389
252577
253168
253581
253073
253061
252649
253976
243828
243679
243081
253979
245184
245188
245343
245548
245948
244552
244968
244571
243147
242898
253070
253279
8858797
8858793
8858789
8858792
8858791
8858798
8859616
8859618
8859622
8860413
8860411
8860417
8859612
8858849
8858061
8855926
8859609
8863469
8863463
8863664
8863517
8863508
8863519
8863505
8861243
8858848
8858069
8859916
8859089
RL
665
665
665
658
637
627
660
660
639
647
646
647
625
723
705
757
625
705
705
702
690
677
701
698
682
695
709
662
651
Results
(NSR = No
Significant
results)
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
refer to Figure 1
NSR
NSR
refer to Figure 1
NSR
NSR
NSR
refer to Figure 1
NSR
refer to Figure 1
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
6
MKAU23_030
MKAU23_031
MKAU23_032
MKAU23_033
MKAU23_034
MKAU23_035
MKAU23_036
MKAU23_037
MKAU23_038
MKAU23_039
MKAU23_040
MKAU23_041
MKAU23_042
MKAU23_043
MKAU23_044
MKAU23_045
MKAU23_046
MKAU23_047
MKAU23_048
MKKAU23_001
MKKAU23_002
MKKAU23_003
MKKAU23_004
MKKAU23_005
MKKAU23_006
MKKAU23_007
MKKAU23_008
12
9
8
10
9
11
11
9
11
11
9
13
9
13
11
9
11
11
2
10
8
7.5
11
11
10
9
6
244813
245421
245631
246419
244627
244219
244498
244097
244229
244630
243297
242825
242878
244087
244574
245307
243695
242794
244396
252192
252402
252634
252963
253092
253099
253296
253496
8853192
8853179
8853189
8853172
8860951
8860514
8858007
8858024
8858838
8858835
8858029
8858810
8858130
8856011
8856004
8863557
8855999
8856820
8853978
8853198
8853734
8854139
8854500
8854993
8855457
8855859
8856181
719
716
704
705
698
698
735
725
722
714
725
699
702
740
732
744
711
747
742
711
701
699
694
690
690
685
672
NSR
NSR
NSR
NSR
NSR
refer to Figure 1
NSR
NSR
NSR
NSR
NSR
NSR
refer to Figure 1
NSR
NSR
refer to Figure 1
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
NSR
7
JORC Code, 2012 Edition – Mkuju auger drilling program
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
Logging
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised
industry
standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (eg ‘reverse
circulation drilling was used to obtain 0.5
m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine
nodules)
may
warrant
disclosure of detailed information.
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Commentary
• AKN utilised Auger drilling at Mkuju to
obtain individual 1m samples, which
were reduced in size to produce a
sample of approximately 1 to 2kg in
weight. The samples were labelled prior
to dispatch to the analytical laboratory,
pulverised to produce a pulp sample for
analysis.
• The Auger drilling results referred to in
the accompanying release were
obtained entirely by Auger drilling with
the samples collected by scoop and
placed into a plastic sample for XRF
analysis and submission to the lab.
• The samples were analysed using a
handheld Olympus Delta XRF unit.
•
Auger drilling was completed with 4WDmounted auger rig.
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
•
All samples are weighed in the field and
samples will also be weighed at the lab
when submitted for analysis.
Recovery levels are considered suitable
and appropriate for this method of
sampling.
No
relationship
between
sample
recovery and grade has been yet
observed and no sample bias is believed
to have occurred.
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
•
•
•
Auger samples were logged for
quantitative and qualitative attributes
with chips stored in chip trays for future
reference. All drill holes were logged in
full.
8
Criteria
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
JORC Code explanation
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
stages
to
maximise
sub-sampling
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias)
and
precision
have
been
established.
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Commentary
•
•
•
•
•
•
•
•
The preparation of the samples follows
industry practice for XRF sampling. All
samples were analysed in the sample
bag under controlled conditions.
Field QAQC was undertaken using
CRM’s.
The sample sizes are considered
appropriate given the nature and grain
size of the material being sampled.
All XRF readings from Mkuju were
conducted in the field using an Olympus
Delta XRF.
Samples were analysed in a clean,
contamination free environment.
Suitable settings and standards were
used on a daily basis to calibrate the unit.
The grade of significant intersections
has been verified by other senior
geological personnel associated with the
project.
The drilling database is managed by
Newexco Exploration, a Perth based
exploration consultancy group. All
drilling data resides on their NXDB
database
management
system.
Newexco is responsible for uploading all
analytical and other drilling data and
producing audited downloaded data for
use in various mining software
packages. The NXDB system has
stringent data entry validation routines.
9
Criteria
Location of
data points
Commentary
• All location data is collected in
WGS84/UTM Zone 37s.
• No downhole survey methods were
completed.
• Auger Drill collars were surveyed with a
handheld GPS unit.
• The RL for each collar was based on
topographic data over the project area.
• The drilling was a first pass drilling
program for the area.
• Drilling and sampling targeted significant
anomalies
identified
in
regional
radiometric surveys completed in mid2007.
• Samples were collected on 1m intervals.
Sample
security
JORC Code explanation
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological
and
grade
continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been
applied.
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• The measures taken to ensure sample
security.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
•
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
•
No orientation bias was considered.
•
The chain of custody is managed by
AKN. The samples will be freighted
directly to the relevant laboratories for
analysis.
No independent audit or review has
been undertaken to date.
Section 2 Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.
• Acknowledgment and appraisal of
exploration by other parties.
Commentary
• The Mkuju project is located on
PL12184, PL12185,PL12186, PL12187,
PL12189, PL12192,PL12606, PL12607,
PL12608 and the tenement package is
in good standing.
•
Mantra Resources completed a highresolution helicopter-borne radiometric
survey over the entire Mkuju River
Project area in mid-2007 which resulted
in the identification of several uranium
anomalies requiring field evaluation.
10
Criteria
JORC Code explanation
Geology
• Deposit type, geological setting and style
of mineralisation.
Drill hole
information
• A summary of all information material to
the under-standing of the exploration
results including a tabulation of the
following information for all Material drill
holes:
• easting and northing of the drill hole
collar
• elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
• dip and azimuth of the hole
• down hole length and interception
depth
• hole length
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
Data
aggregation
methods
Relationship
between
mineralisation
widths and
Commentary
Geological
mapping,
ground
radiometrics and trenching was
completed on various target areas.
Although preliminary in nature, the field
observations were positive with visible
uranium mineralisation being recorded
in trenches at a number of the targets.
• The regional geology is dominated by
Karoo Basin siltstone and sandstone
sediments.
• The mineralisation is interpreted to be
analogous to ‘roll-front’ uranium
deposits, specifically hosted in mutistacked Karoo Basin sandstone and
siltstone sequences.
• Auger drill hole collar locations and a
summary of the significant intersections
are shown in Appendix 1
• Intersection calculations are weighted by
sample length.
• Reported intersections are primarily
based on a cut-off of 35ppm U and
summarised in Table 1.
• A maximum of 2m of sub-grade (below
cut-off) is incorporated into the reported
composited intersections.
• No top cut has been applied.
•
•
Intersection lengths are reported are
downhole lengths.
Mineralisation is interpreted to be flat
lying, stacked sandstone and siltstone
sequences.
11
Criteria
intercept
lengths
JORC Code explanation
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Commentary
• All auger drillholes are vertical (not
inclined).
Diagrams
• Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported. These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and
material, should be reported including
(but
not
limited
to):
geological
observations; geophysical survey results;
geochemical survey results; bulk samples
- size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large- scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
•
Relevant diagrams have been included
within the main body of text.
•
Anomalous XRF readings have been
identified at Mkuju, these samples will
be sent to the laboratory for an
accredited assay, where the results will
be tabulated for release.
XRF readings should be considered a
guide only.
This reporting method has been
deemed appropriate for this stage of
the project.
Balanced
Reporting
Other
substantive
exploration
data
Further work
•
•
•
No other substantive data exists.
•
Once assay results have been received
and reviewed, further drilling and
geophysical work will be considered to
assess the potential of the Mkuju
project.
12
Share your feedback
Discover