Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
1
Quarterly Report for the quarter ending 30 September 2025
Highlights
AuKing Mining is an exploration company focused on gold, uranium,
copper and niobium/REE projects in Australia, Canada, and Tanzania
Quarterly Report
For the quarter ending 30 September 2025
Auking Mining Limited
ABN 29 070 859 522
ASX Code: AKN
www.aukingmining.com
Issued Capital:
Ordinary shares
815,996,477
Options
15,625,000 unlisted options (31 December
2025 @ 10c each)
304,734,034 unlisted options (30 April 2027
@ 3c each)
265,086,209 unlisted options (31 December
2026 @ 0.6c each)
33,333,333 unlisted options (30 June 2028 @
0.9c each)
Directors:
Non-Executive Chairman Peter Tighe
Managing Director Paul Williams
Non-Executive Director Mark Fisher
Non-Executive Director Dr Kylie Prendergast
Non-Executive Director Nick Harding
Non-Executive Director Lincoln Ho
Company Secretary Paul Marshall
Contact
Suite 34, Level 10
320 Adelaide Street
BRISBANE Q 4000
Ph: +61 7 3535 1208
Email:
admin@aukingmining.com
• Completed A$5M loan facility with
London-based RiverFort Global Capital
Limited and initial $500k drawdown.
• Cobalt Blue JV (Koongie Park copper/zinc
project) continued to make progress, with
a proposed major uplift in project
activities.
• Completed airborne survey at Myoff Creek
niobium/REE project in British Colombia.
Preliminary results indicate a potential
extension of the known carbonatite
mineralisation
• The Cloncurry Gold Project acquisition
progressed during the Quarter including:
(a) US-based Nebari Natural
Resources Fund successfully
completed acquisition finance due
diligence;
(b) Continued work with Orion
Resources to meet sale
completion obligations;
• Completed the second tranche of
placement of shares and attaching
options to raise a further $497k out of
total $1.177M proceeds.
2
Quarterly Report for the quarter ending 30 September 2025
Cloncurry Gold Project
Queensland, Australia
Ownership – proposed 100% acquisition
Gold exploration and near-term development project
Cloncurry Project
Orion Resources Pty Ltd (Orion) has previously entered into an asset sale agreement
(ASA) to acquire the existing Lorena processing plant and associated facilities, situated
approximately 15 kms east of Cloncurry in northern Queensland, together with various
exploration and mining tenements in that area. The Lorena plant is a conventional carbon
in leach gold processing facility. In addition, Orion has acquired under the ASA additional
exploration and mining tenements approximately 30kms to the south of the Lorena plant,
described as the “Mt Freda/Golden Mile Project”. The overall tenure package being
acquired by Orion covers an area of 447km2 in the Cloncurry Region and includes
several granted Mining Leases and existing gold resources.
Figure 1 – Orion’s Cloncurry Project interests, including the Mt Freda/Golden Mile mining leases. [Note
the nearby Wynberg and Wallace/Wallace South gold projects are not assets being acquired by Orion]
Orion is developing plans to re-establish mining and processing operations at Lorena,
with a focus on first mining from the Mt Freda/Golden Mile deposits subject to completion
of further resource definition drilling and studies. As part of a broader production strategy,
Orion proposes to establish a central gold and copper processing hub for the region.
3
Quarterly Report for the quarter ending 30 September 2025
Nebari Financing
On 19 May 2025, the Company announced the signing of a non-binding indicative term
sheet for an A$8M financing with Nebari Natural Resources Credit Fund II, LP (“Nebari”).
Key features of the Nebari term sheet included:
• Non-Binding finance term sheet: AuKing and Orion have signed a non-binding
indicative term sheet for a 3-year senior secured credit facility of A$8M (“Facility”).
Nebari will retain (during the term of the facility) a right of first refusal to provide
additional project financing to the parties.
• Use of Proceeds: If the Facility proceeds the funds will be utilized for Orion’s
acquisition of the Cloncurry Gold Project assets.
• North American Lender: The Facility is to be provided (subject to completion of
satisfactory due diligence) by Nebari, a well-known US-based firm that has
advanced substantial funds to mining projects for several years.
During the September Quarter the Company advised that Nebari had successfully
cleared its Cloncurry Project due diligence hurdle, which was one of their key conditions
to be satisfied prior to formal facility documentation being entered into.
100% Acquisition of Orion Resources
On 18 September 2025, AuKing announced that it had entered into a binding Heads of
Agreement with Orion Resources making provision for the acquisition of 100% of the
shares in Orion Resources. This acquisition is intended to be effected in two
contemporaneous stages:
• Firstly, by AuKing accelerating its existing earn-in right to acquire 50% of Orion for
$5M; and
• Secondly, with AuKing now acquiring the other 50% interest for a total
consideration of $16.283M. This second stage acquisition is to be completed by
way of the issue of ordinary shares in AuKing to each of the existing Orion
shareholders in proportion to their holdings as at financial close. 50% of these
shares will be the subject of voluntary trading restrictions for a period of 12
months.
AuKing has approached ASX to confirm that full ASX quotation re-compliance will not be
required under Chapter 11 of the ASX Listing Rules, and the proposed 100% Orion
acquisition is conditional upon ASX providing this confirmation. Approval from
shareholders will (in any event) be sought before the issue of further shares to the
existing Orion shareholders is completed.
The Company also intends to conduct a significant capital raising by way of an
entitlement offer to existing AuKing shareholders. The proposed AuKing raising is likely
to be conducted by way of a renounceable rights issue and further details as to offer
terms will be announced shortly. It is proposed that the AuKing shares to be issued to the
existing Orion shareholders will be issued at the same price as the rights issue.
4
Quarterly Report for the quarter ending 30 September 2025
Koongie Park Project
Western Australia, Australia
Copper/zinc exploration project
On 18 February 2025, the Company announced that it had entered into an Earn-in Joint
Venture agreement with Cobalt Blue Holdings Limited (ASX:COB). Since that time, COB
has made excellent progress with its initial project activities at Koongie Park.
On 6 June 2025, COB announced the results of a Scoping Study that they had
completed in relation to the Koongie Park Project. The COB Scoping Study established
the following life of project financial parameters (on a 100% project basis):
Pre-tax NPV8 (real) – A$172M
Post-tax NPV8 (real) – A$121M
Pre-tax Internal Rate of Return – 28%
Post-tax Internal Rate of Return – 21.4%
On 4 August 2025 COB announced a further uplift in project activities at Koongie Park
featuring the following activities:
• Engineering Review Targets Expansion
Multiple value engineering opportunities are being progressed to build on the
strong economics delivered in the June 2025 Scoping Study (the ‘Scoping Study’):
o Silver recovery presents a substantial opportunity to boost Stage 1 margins.
o Cobalt at Sandiego occurs with high-grade copper-zinc zones—inclusion of
cobalt in future Mineral Resource estimates could provide a valuable
byproduct credit, enhancing Stage 2 cost competitiveness.
o A centralised processing hub is under review to integrate satellite deposits
into the development plan aiming to extend life-of-mine, increase
throughput, and lower unit capital intensity.
• Sandiego North Emerges as a High-Impact Discovery Target
Defined by a 700 m copper-in-soil anomaly with multiple samples exceeding 200
ppm Cu.
o Drill hole ASWB01 intersected 5 m at 1.37% Cu and 2m at 1.71% Cu,
confirming copper mineralisation north of the existing resource.
o Deep drilling at Sandiego shows mineralisation trending toward Sandiego
North, with high-grade results remaining open along strike.
o Represents a priority target for near-term resource growth.
• Broader tenement package under systematic review, targeting multi-deposit
development potential.
5
Quarterly Report for the quarter ending 30 September 2025
Canada Projects
Myoff Creek
Ownership – 100% | British Columbia, Canada
Niobium and REE exploration project
During the September Quarter, the Company announced the preliminary results of an
airborne survey conducted over the entire Myoff Creek tenure package. Highlights of the
results include:
• Airborne survey: A helicopter-borne high resolution aeromagnetic and
radiometric survey covering 70-line kms has been flown across the Myoff Creek
tenure area and the final results of the survey are being collated for formal
reporting purposes.
• Carbonatite mineralization confirmed: Preliminary results are consistent with
previously interpreted and drilled near-surface carbonatite mineralization in the
northern area of the project area which contained notable intercepts of niobium
and total rare earth oxides. (See ASX release by AuKing dated 22 July 2024).
• Potential carbonatite extension: The survey has highlighted previously untested
anomalous areas of additional carbonatite mineralization in the central and
southern areas of the Myoff Creek project area, providing potential extensions of
carbonatite mineralisation and creating fresh exploration targets for follow-up.
After receipt and further assessment of the final results from the airborne survey the
Company will establish a plan for further exploration activities at this project.
Grand Codroy
Ownership – 100% | Newfoundland, Canada
Uranium and Copper exploration project
No work was conducted on this project during the September Quarter.
Upcoming Exploration
There are plans to conduct a soil and rock chip sampling and survey program when the
Company has sufficient funds to do so.
6
Quarterly Report for the quarter ending 30 September 2025
Tanzania Projects
Ownership 100% | Tanzania
Uranium exploration projects
In January 2023, AuKing announced completion of the acquisition of its 100% interest in
six projects in Tanzania (Ref ASX Release 31 January 2023).
The Mkuju Uranium Project in southern Tanzania remains the Company’s focus of
exploration activities in Tanzania. As previously advised, a detailed exploration drilling
program has been approved by local authorities and will commence when the Company
has sufficient funds to carry out that activity.
Sale of Mkuju Licences
On 5 February 2025, the Company announced the sale of two non-core Prospecting
Licences in the Mkuju region to Gage Capital for a total purchase price of $300,000, less
prospecting licence annual renewal fees incurred by Gage Capital of $144,992.
This sale was completed during the September Quarter.
Sale of Manyoni Licences
On 16 October 2024, AuKing announced it had reached agreement to sell its remaining
non-core Manyoni PLs to ASX-listed Moab Minerals Limited (ASX: MOM) for a total
purchase price of A$175,000. The sale remains conditional on certain Tanzanian
regulatory matters.
Saudi Arabia Joint Venture
Kingdom of Saudi Arabia
The Company completed arrangements with Resource Mining Corporation Limited
(ASX:RMI) during the September Quarter, whereby RMI acquired all of the Company’s
interests in this Saudi JV. As a consequence, the Company has no further interest in this
Saudi JV.
Corporate
Extraordinary General Meeting – 15 August 2025
The Company held an Extraordinary General Meeting of shareholders (EGM) on Friday,
15 August 2025. All resolutions at the EGM were passed with near-unanimous majorities.
7
Quarterly Report for the quarter ending 30 September 2025
RiverFort Global Financing
On 2 July 2025, the Company announced it had entered into a binding term sheet with
London-based RiverFort Global Capital Limited to provide for a A$5M loan facility to the
Company (“RiverFort Facility”). RiverFort conducts an international business of providing
venture debt financing for listed companies.
On 9 September 2025 the Company announced that the RiverFort Facility had been
finalised and that an initial $500k of funds had been drawn down under the Facility. It is
the intention of the Company that funds from the RiverFort Facility will provide an
important source of potential future funding for the Company as it proceeds with the
proposed Cloncurry Gold project acquisition and future development activities.
GAM Short-term Loan
The Company repaid all moneys owing under this loan from GAM Company Pty Ltd
(“GAM”) during the September Quarter.
Share Placement (July 2025)
On 2 July 2025, AuKing announced that it had received binding commitments for a
placement to professional and sophisticated investors (including Directors) comprising
196,228,333 new fully paid ordinary shares in the Company at an issue price of $0.006
per share (“Placement Shares”) together with free-attaching options to raise A$1.17M
(before issue costs). The Placement occurred in two tranches:
• Tranche 1 Placement – the Company to issue 113,337,550 new shares at an
issue price of $0.006 per share raising a total of $680,025 before costs. These
Placement Shares will be issued pursuant to the Company’s existing placement
capacity under ASX Listing Rules 7.1 (58,288,245 shares) and 7.1A (55,049,305
shares); and
• Tranche 2 Placement – subject to obtaining shareholder approval, the Company
proposes to issue approximately an additional 82,890,783 new shares at an issue
price of $0.006 per share, raising an additional $497,344 before costs. This
includes Director participation of approximately $150,000 (subject to shareholder
approval).
The Placement also included the offer, subject to obtaining shareholder approval, of the
following free attaching options (“Placement Options”):
• One option for every one Placement Share issued (being a total of 196,228,333
options) with an exercise price of $0.006 and expiring on 31 December 2026
(“$0.006 Options”); and
• One option for every two Placement Share issued (being a total of 98,114,167
options) with an exercise price of $0.03 and expiring on 30 April 2027 (“0.03
Options”).
At the recent EGM on 15 August 2025, the Company’s shareholders approved the
8
Quarterly Report for the quarter ending 30 September 2025
proposed issue of shares and options contemplated by the Placement. Shortly after the
EGM the Tranche 2 Placement was completed.
The funds received by the Company under the Placement were utilized for the following
purposes:
• Retirement of the short-term GAM loan facility (see details above);
• Provide additional funds to assist with the Cloncurry Gold project acquisition;
• Working capital; and
• Costs of the Placement.
Peak Asset Management and Spark Plus acted as Joint Lead Managers to the
Placement.
ASX Additional Information
Exploration Activities ASX Listing Rule 5.3.1:
There was limited focus on AuKing’s exploration activities during the September Quarter
as focus on the Cloncurry Gold acquisition continued. Total exploration expenditure for
the September Quarter, excluding contributions to the Orion acquisition was $42K.
Mine Production Activities ASX Listing Rule 5.3.2:
There were no mine production or development activities conducted during the Quarter.
Related Party Payments
During the September 2025 Quarter, AuKing paid a total of $104,123 of director fees and
$46,932 of interest to related parties and their associated entities.
Board and Senior Management
Mr Peter Tighe, Non-Executive Chairman
Mr Paul Williams, Managing Director
Mr Mark Fisher, Non-Executive Director
Dr Kylie Prendergast, Non-Executive Director
Mr Nick Harding, Non-Executive Director
Mr Lincoln Ho, Non-Executive Director
Mr Chris Bittar, Exploration Manager
Mr Paul Marshall, CFO and Company Secretary
9
Quarterly Report for the quarter ending 30 September 2025
Financial Position
At 30 September 2025, AuKing had cash reserves of $56,000. Further details of
AuKing’s financial activities during the September 2025 Quarter are set out in the
Appendix 5B Quarterly Cashflow Statement which accompanies this report. The
Company announced on 18 September 2025 its intention to proceed with a substantial
capital raising by way of an entitlement offer to existing shareholders, Details of this offer
will be made available shortly.
Share Information
Issued share capital of 815,996,477 ordinary shares, 15,625,000 options to subscribe for
ordinary AKN shares at an exercise price of 10c each and exercisable on or before 31
December 2025, 304,734,034 options to subscribe for ordinary AKN shares at an
exercise price of 3c each and exercisable on or before 30 April 2027, 265,086,209
options to subscribe for ordinary AKN shares at an exercise price of 0.6c each and
exercisable on or before 31 December 2026, and 33,333,333 options to subscribe for
ordinary AKN shares at an exercise price of 0.9c each and exercisable on or before 30
June 2028.
During the Quarter, 64,500,000 options to subscribe for ordinary AKN shares at an
exercise price of 20c each and exerisable on or before 30 September 2025 lapsed
without being exercised.
Top 10 Shareholders of AKN at 30 September 2025
Rank Name Number of Shares %
1 Kabunga Holdings Pty Ltd <Kabunga Family A/c>#
74,080,000 9.08
2 Gage Resources Pty Ltd#
60,000,000 7.35
3 Mrs Yongjie Chen#
43,813,108 5.37
4 Ms Chunyan Niu 31,890,477 3.91
5 Mr Peter Tighe and Mrs Patricia Tighe <The Peter Tighe S/F A/c> 26,917,038 3.30
6 RiverFort Global Opportunities PCC Ltd 17,700,000 2.17
7 Elf Point Minerals Pty Ltd <Elk Point A/c> 16,334,250 2.00
8 Mr Joseph Ignatius D’Souza 16,330,000 2.00
9 Xiaole Wu <The Wu Family A.c> 14,285,715 1.75
10 Brian and Noeline Smith 14,285,714 1.75
TOTAL 315,636,302 38.68
# Denotes substantial shareholder
10
Quarterly Report for the quarter ending 30 September 2025
Other Details
Head Office Share Registry
Level 10, Suite 34 MUFG Corporate Investments (AU) Limited
320 Adelaide Street Level 12, 300 Queen Street
Brisbane Q 4000 Brisbane Q 4000
Phone: +61 7 3535 1208 Phone: 1300 554 474
Website: www.aukingmining.com
This announcement is authorised by the Board.
For further information contact:
Paul Williams
Managing Director
p.williams@aukingmining.com
+61 419 762 487
11
Quarterly Report for the quarter ending 30 September 2025
Current AuKing Tenures
Project/Location Tenement
Reference
Current Holder AKN %
Interest
Comment
WESTERN AUSTRALIA
Koongie Park, Halls Creek E80/ 4960 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek E80/ 5076 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek E80/ 5087 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek E80/ 5127 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek E80/ 5263 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek M80/ 276
(Sandiego)
Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek M80/ 277
(Onedin)
Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek E80/5707 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek P80/ 1878 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek P80/ 1879 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek P80/ 1880 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek P80/ 1881 Koongie Park Pty Ltd 100 Refer Note 1
Koongie Park, Halls Creek P80/ 1882 Koongie Park Pty Ltd 100 Refer Note 1
TANZANIA
Manyoni PL12188 92U Tanzania Ltd 100 Refer Note 2 and 3
Manyoni PL12190 92U Tanzania Ltd 100 Refer Note 2 and 3
Manyoni PL12191 92U Tanzania Ltd 100 Refer Note 2 and 3
Manyoni PL12323 92U Tanzania Ltd 100 Refer Note 2 and 3
Mkuju PL12184 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12185 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12186 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12187 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12189 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12192 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12485 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12606 92U Tanzania Ltd 100 Refer Note 2
Mkuju PL12607 92U Tanzania Ltd 0 Refer Note 2 and 4
Mkuju PL12608 92U Tanzania Ltd 0 Refer Note 2 and 4
Karema PL12179 Monaco Copper Ltd 100 Refer Note 2
CANADA – MYOFF CREEK
MC1RAR 1048172 North American Expl P/L 100 Refer Note 5
REN 1 1048173 North American Expl P/L 100 Refer Note 5
REN 2 1048179 North American Expl P/L 100 Refer Note 5
REN 3 1048187 North American Expl P/L 100 Refer Note 5
REN 4 1052092 North American Expl P/L 100 Refer Note 5
CHILLY 1089285 North American Expl P/L 100 Refer Note 5
REN CHILLY 1098734 North American Expl P/L 100 Refer Note 5
REN NW 1119473 North American Expl P/L 100 Refer Note 5
REN CHILLY2 1121091 North American Expl P/L 100 Refer Note 5
CANADA – GRAND
CODROY
038273M Lithium Rabbit Pty Ltd 100 Refer Note 5
Notes:
1. AKN entered into a Joint Venture earn-in agreement in February 2025 whereby Cobalt Blue
Holdings Limited has the right to earn up to a 75% interest in these tenures.
2. 92U Tanzania Limited and Monaco Copper Limited, are wholly owned subsidiaries of Auking
Mining Limited.
3. These licences are the subject of the sale agreement that has been entered into with Moab
Minerals Limited and Katika Resources Limited, with completion due shortly.
12
Quarterly Report for the quarter ending 30 September 2025
4. These licences are the subject of the sale agreement that has been entered into with Gage
Resources Tanzania Limited – see ASX announcement titled “Strategic Transaction with Gage
Capital” dated 5 February 2025. Completion of this sale occurred during the September Quarter.
5. North American Carbonatite Exploration Pty Ltd and Lithium Rabbit Pty Ltd are wholly-owned
subsidiaries of AuKing Mining Limited.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AUKING MINING LIMITED
ABN Quarter ended (“current quarter”)
29 070 859 522 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(167) (287)
(a) exploration & evaluation: Tanzania,
Canada and Orion projects
(b) development - -
(c) production - -
(d) staff costs (215) (410)
(e) administration and corporate costs (298) (989)
1.3 Dividends received (see note 3) - -
1.4 Interest received - -
1.5 Interest and other costs of finance paid (145) (230)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Disposal of Tanzania licences 150 150
1.9 Net cash from / (used in) operating
activities
(717) (1,825)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation: Koongie Park - (35)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 R&D tax incentives - -
2.6 Net cash from / (used in) investing
activities
- (35)
3. Cash flows from financing activities
996 1,830
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(205) (210)
3.5 Proceeds from borrowings 478 829
3.6 Repayment of borrowings (531) (567)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
738 1,882
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
35 34
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(717) (1,825)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
- (35)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
738 1,882
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
56 56
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 56 35
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
56 35
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
151
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Managing Director salary and superannuation: $104,123
Interest payments to Peter Tighe: $46,932
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 1,150 1,150
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 1,150 1,150
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Short-term loan agreement with Director Peter Tighe:
• Facility limit of $650,000 (excluding accrued interest)
• Due date of the earlier of 31 March 2026 or when the Company has sufficient funds to repay the
loan
• 15% per annum payable monthly in arrears
Loan facility with RiverFort Global Capital Ltd:
• Facility limit of $5,000,000. $500,000 is immediately available for the first drawdown. The
remaining facility will be available in two tranches.
The second tranche of $2,500,000 will be available to fund the Orion project and the third tranche
of $2,000,000 at a later time to further fund development of the Orion project.
The second and third tranches are subject to mutual agreement between RiverFort Global
Capital Ltd and the Company.
• Overall facility term of 3 years
Each drawdown is to be repaid 12 months from the drawdown date Interest rate of 1% per week.
• First Ranking Security over Auking Mining Limited but subject to being subordinated to the
proposed Nebari senior secured facility.
• 4.5% drawdown fee paid in cash and deducted from gross proceeds of each Drawdown, or 5.5%
paid in shares at the 5-day VWAP preceding the relevant drawdown.
• RiverFort Global Capital Ltd shall receive Options equal to 40% (or a 2:5 ratio) of each
Drawdown divided by the Reference Price, exercisable at a 50% premium to the relevant
Reference Price. Each issuance of Options will have a 36-month term from the date of issuance.
The Options associated with the First Drawdown will have an exercise price at a 50% premium
to the Equity Placing share price.
• RiverFort Global Capital Ltd may from time to time and in varying amounts convert outstanding
Principal and Interest at a 50% premium to the Reference Price of each Drawdown at any time
during the Term. For the First Drawdown, the Fixed Placing Price will be at a 50% premium to
the Equity Placing price.
If there is any issuance of equity at a share price which is below the Fixed Placing Price during
the Term, the Fixed Placing Price will be revised to be the same as the relevant placing price of
the issuance of equity.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (717)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
8.3 Total relevant outgoings (item 8.1 + item 8.2) (717)
8.4 Cash and cash equivalents at quarter end (item 4.6) 56
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 56
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.08
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated
Share your feedback